Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Detained cargoship

#Detained - A Dutch flagged general cargoship that was due to Dublin Port last night remains under detention in Wicklow Port having discharged packaged timber, writes Jehan Ashmore.

Irish maritime authorities detained the 2010 built Crown Mary on behalf of the Paris MoU in which Ireland is a member of the organisation. The mission of the Paris MoU is to eliminate the operation of sub-standard ships through a harmonized system of Port State Control. A list of ships that are currently under detention in the Paris MoU region can be consulted here.

The 2,622 gross tonnage Crown Mary had sailed from New Holland, located on the Humber Estuary opposite Hull, a major North Sea ferryport. Just over a year ago Afloat previously reported of another detained cargoship Burhou I in Wicklow. Again this albeit smaller cargoship was employed in the timber trade.

The Paris MoU (Memorandum of Understanding) on Port State Control (PSC) was signed in January 1982 by fourteen European countries at a Ministerial Conference held in Paris, France. It entered into operation on 1 July 1982. The principles of the MoU also cover the following:
Safety of life at sea
Prevention of pollution by ships, and
Living and working conditions on board ships

The Paris MoU on PSC is an administrative agreement between 27 Maritime Authorities. The participating maritime Administrations of the Paris MoU covers the waters of the European coastal States and the North Atlantic basin from North America to Europe.

Since the detention was imposed last Saturday, Afloat had noted the 88m Crown Mary shift berths within Wicklow Port. This involved the vessel vacate the main commercial Packet Quay to the East Pier so to enable other cargoships to dock. So far two ships have called, Thea Marieke also Dutch flagged arrived from Sheerness, Kent. Last night the vessel docked in Dublin and this morning Scot Pioneer called to Wicklow having sailed overnight from Warrenpoint.

Only the day before the detention, Wicklow recieved the first call of the newly renamed car ferry Fraser Aisling Gabrielle. The 44-car capacity ferry made an overnight stop while en route from Waterford to Greenore from where next month a new Carlingford Lough service is to operate to Greencastle. 

Update May 24 2017: Detention of Dutch Flagged Cargoship In Wicklow Port Is Lifted

 

Published in Ports & Shipping

#Detained- A cargoship from Scotland that was detained in Wicklow Port for a more than a week including St. Patrick's Day, finally departed last night bound for Belfast, writes Jehan Ashmore.

The 674 tonnes Burhou I was detained by Port State Control at Wicklow Port, having discharged a cargo of round timber from Kyle of Lochalsh in western Scotland. This is a regular trade to the port as featured previously on Afloat.

Burhou I is a Belize flagged small coaster which was detained following an inspection by authorities. The detention surrounded a single technical deficiency to resolve, before the ship departed yesterday in the early evening.

The detention of the 58m long Burhou I involved having to shift berths within Wicklow Harbour. This led to the cargoship berthing alongside the non-commercial East Pier.

It is from this vantage point where spectators gather to watch the Round Ireland Yacht Race hosted by the nearby Wicklow Sailing Club located at the foot of the pier.

The veteran cargsoship built by a German yard in 1978 is a sister of Isis (see, visit to Ramsey, Isle of Man). Both coasters have self-loading and discharging capabilities to transport a variety of cargoes among them timber felled in Scotland. 

These coasters regularly trade throughout the Irish Sea and also to ports in south-west England. In addition they provide a domestic freight service to the smaller harbours in the Scottish Outer Isles.

Also in the port during the week was the 82m long Nestor. This was only the second call to the port of the 2,452 tonnes cargoship that loaded scrap metal in recent days and departed for Liverpool.

Published in Ports & Shipping

#DetainedBulker- A High Court judge has expressed concern for the crew of a Belize registered 19,000 tonnes cargo ship detained in Dublin Port since last March and who have not been paid since late last year.

The 17 crew, represented by the International Transport Workers Federation, had brought proceedings against the owner of the MV Clipper Faith for unpaid wages of approximately $320,000.

The ship's owner, the Liberian-registered Afternoon Maritime, said it lacked funds to pay the crew, who are largely from Russia and Ukraine. For more on this story, The Irish Times has a report.

 

Published in Ports & Shipping

ESB’s 2040 strategy Driven to Make a Difference: Net Zero by 2040 sets out a clear roadmap for ESB to achieve net zero emissions by 2040. 

ESB will develop and connect renewable energy to decarbonise the electricity system by 2040. ESB will invest in the development of new renewable generation, including onshore and offshore wind and solar, and will significantly increase the amount of renewable generation connected to our electricity networks.

ESB will:

  • Deliver more than a fivefold increase in our renewable generation portfolio to 5,000MW.
  • Reduce carbon intensity of generation fleet from 414 to 140gCO2/kWh by 2030.
  • Decarbonise 63% of our generation output by 2030 and 100% by 2040 (up from c20% now).

Offshore wind

ESB know the importance of offshore wind in tackling climate change and delivering net zero. Ireland has a unique capability given its prime location to take advantage of the potential of offshore wind. ESB are working hard to develop offshore wind projects for the benefit of everyone across society in Ireland and the UK. This includes ongoing engagement with marine users and local communities so ESB can deliver these significant projects.

Offshore wind will play a major role globally in our fight against climate change. It will help to replace energy generated by burning fossil fuels with that from a clean, safe and secure renewable energy source. Ireland’s geographic location on the exposed edge of the Atlantic presents us with a significant opportunity to generate electricity from wind – both offshore and onshore.

Power from onshore wind farms currently provide over one-third of Ireland’s electricity needs. But, whilst its marine area is many times the size of its landmass, Ireland’s offshore wind potential is only starting to be realised. ESB have a coastline stretching over 3,000km but only one operational offshore wind farm – Arklow Bank, with a capacity of 25 MW. In contrast, Belgium’s coastline is only 63km long, but it has already developed more than 2,000 MW of offshore wind. In Great Britain, with a coastline four times the length of ours, offshore wind generation now equates to over 440 Arklow Banks, with an installed capacity of 11,0000 MW as of late 2021.

The Irish Government's target to install 5,000 MW of offshore wind capacity in our maritime area by 2030 is set out in the Climate Action Plan 2021. It also has the objective to source 80% of Ireland’s electricity needs from renewables by the same year. In line with this, ESB is applying its professional and proven engineering expertise to the challenges set within the Climate Action Plan.

ESB are committed to playing a strong role in developing Ireland’s offshore wind potential for the benefit of the people of Ireland. This will be done in consultation with marine users and local communities, and with due care for the marine environment.