Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: DouglasLiverpool

Once the new £70m ferry terminal in Liverpool Docks is in operation, it is hoped the Isle of Man Steam Packet can put on a year-round operated service between Douglas and Merseyside.

The Steam packet’s fast-ferry Manannan currently does not take passengers to Merseyside during the winter months. However, the 865 capacity craft did receive some modifications to allow it to berth at the new site when trails took place last month at the Princes’ Half-Tide Dock facility.

In the meantime, the latest business plan of the IOMSP shows it doesn't expect the 1998 built / 200 car capacity fastcraft, will be replaced before 2030.

As ManxRadio reports, there are questions that still hang over as to when the new terminal in the northwest of England port will be in operation, with a number of recent deadlines for opening missed.

A committee was told by the IOMSP’s Managing Director, Brian Thomson on what's expected once the new terminal is ready to welcomes passengers (to listen, click station's audio link).

The MD said that the operation of a high-speed catamaran is perhaps not the best option going forward.

Noting, last week the Packet Company confirmed that the Manannan had been damaged during a very rough crossing from Liverpool to the Isle of Man, for more the radio station also has the story here.

Published in Ferry

The Manx Government has lowered its coronavirus alert level meaning the fast (ferry)craft Manannan can resume sailings between Liverpool and the Isle of Man

As Liverpool Business News reports, fast craft sailings between the England and the Isle of Man will resume this week – but only for residents of the island.

In March the Isle of Man Steam Packet Company halted sailings, which can be up to twice a day during the peak summer months, as the island looked to protect its residents from the spread of coronavirus.

Since March there have been 336 confirmed cases of COVID-19 among the Isle of Man’s population of around 84,000 people, with 312 recovering and 24 deaths. There has been no new confirmed cases on the island for more than 50 days.

From Monday, July 20, the Manx government is moving its alert level from 5 to 4 which means residents will be allowed to visit the UK and beyond for holidays or to visit friends and relatives before self-isolating for 14 days on their return.

Although the Steam Packet Company rescheduled its timetable in late March, it has continued to operate daily services between Douglas and Heysham, including an overnight lifeline freight service.

For further reading click here

Published in Ferry

#MerseyFastFerry – The recent return of the Manx-Merseyside fast-craft car-ferry, Manannan alongside to Liverpool Landing stage marks preparations to the 2014 seasonal service between the city and Douglas, writes Jehan Ashmore.

Operated by the Isle of Man Steam Packet Company, Manannan, which had spent a winter lay-up in Liverpool docks, is to reopen the route this Friday (28 March). The inaugural sailing departs Douglas at 07.30 and for further information sailings and other routes visit the link HERE.

A UK-Manx service was in operation during the winter months on the Douglas-Birkenhead link. The ferry terminal of Twelve Quays in Birkenhead is located facing Liverpool on the opposite side of the River Mersey.

The Birkenhead-Douglas route had been served by conventional ro-pax ferry, Ben-My-Chree which in tandem also ran sailings to Heysham, from where the vessel continues to operate on the company's second Isle of Man-England route.

 

Published in Ferry

#MANX FERRY – The IOM Today reports that the Manx Government is drawing up plans to ensure that any wind-farms built within the waters off the island would not affect ferry routes.

Work on the Isle of Man Marine Plan is under way and the Department of Environment, Food and Agriculture's director of environment Martin Hall said it was important it was completed in a 'timely manner'.

One of the plan's objectives would be to identify current activities in Manx waters and safeguard their ongoing use. Mapping the location of navigation corridors, important natural areas and pipelines/cables will enable the island to identify potential wind farm sites that will not adversely affect current uses of the Manx marine environment, including ferry routes and fishing.

The comments come following criticism from the Isle of Man Steam Packet Company over Centrica's plans for a wind farm in the Irish Sea, outside Manx waters. The Steam Packet says that Centrica plans to develop in the path of two routes: Douglas-Liverpool and Douglas-Heysham, in spite of complaints from the ferry operator. For much more on this story click HERE.

Published in Ferry

ESB’s 2040 strategy Driven to Make a Difference: Net Zero by 2040 sets out a clear roadmap for ESB to achieve net zero emissions by 2040. 

ESB will develop and connect renewable energy to decarbonise the electricity system by 2040. ESB will invest in the development of new renewable generation, including onshore and offshore wind and solar, and will significantly increase the amount of renewable generation connected to our electricity networks.

ESB will:

  • Deliver more than a fivefold increase in our renewable generation portfolio to 5,000MW.
  • Reduce carbon intensity of generation fleet from 414 to 140gCO2/kWh by 2030.
  • Decarbonise 63% of our generation output by 2030 and 100% by 2040 (up from c20% now).

Offshore wind

ESB know the importance of offshore wind in tackling climate change and delivering net zero. Ireland has a unique capability given its prime location to take advantage of the potential of offshore wind. ESB are working hard to develop offshore wind projects for the benefit of everyone across society in Ireland and the UK. This includes ongoing engagement with marine users and local communities so ESB can deliver these significant projects.

Offshore wind will play a major role globally in our fight against climate change. It will help to replace energy generated by burning fossil fuels with that from a clean, safe and secure renewable energy source. Ireland’s geographic location on the exposed edge of the Atlantic presents us with a significant opportunity to generate electricity from wind – both offshore and onshore.

Power from onshore wind farms currently provide over one-third of Ireland’s electricity needs. But, whilst its marine area is many times the size of its landmass, Ireland’s offshore wind potential is only starting to be realised. ESB have a coastline stretching over 3,000km but only one operational offshore wind farm – Arklow Bank, with a capacity of 25 MW. In contrast, Belgium’s coastline is only 63km long, but it has already developed more than 2,000 MW of offshore wind. In Great Britain, with a coastline four times the length of ours, offshore wind generation now equates to over 440 Arklow Banks, with an installed capacity of 11,0000 MW as of late 2021.

The Irish Government's target to install 5,000 MW of offshore wind capacity in our maritime area by 2030 is set out in the Climate Action Plan 2021. It also has the objective to source 80% of Ireland’s electricity needs from renewables by the same year. In line with this, ESB is applying its professional and proven engineering expertise to the challenges set within the Climate Action Plan.

ESB are committed to playing a strong role in developing Ireland’s offshore wind potential for the benefit of the people of Ireland. This will be done in consultation with marine users and local communities, and with due care for the marine environment.