Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: DryDocking Prog

Six ferries of Stena Line's Irish Sea fleet will dry-dock at Harland and Wolff’s famous Belfast shipyard this summer for a range of repairs and upgrades.

Currently the Stena Europe (see related relief ferry), which operates on the Rosslare-Fishguard service, is dry-docked in Belfast with the final works project due to be completed on the Stena Superfast VIII (Belfast-Cairnryan service) at the end of September. This is part of the significant docking programme by the Irish Sea’s largest ferry operator.

2020 marks more than 40 years of Stena ships in Belfast’s iconic Harland and Wolff (H&W) shipyard. In April 1980 the firm’s predecessor (Sealink BR) took delivery of the Belfast-built MV Galloway Princess (later Stena Galloway) which operated on the Northern Ireland routes for many years.

Stena Line continues to select the H&W shipyard for docking works on their Irish Sea ferry fleet, with orders totalling £2.5m.

Paul Grant, Stena Line’s Trade Director said: “Despite the dramatic impact of the Coronavirus pandemic on our business, regular ship upgrades and maintenance works are a very important element in our ship management operation. They help us to maintain our excellent reliability record and keep our Irish Sea fleet to the forefront of the ferry sector.”

He added: “Whilst Stena Line has already committed a significant investment to the Irish Sea by introducing two new ships – Stena Estrid (Dublin-Holyhead, Jan 2020) and Stena Edda (Belfast-Liverpool, March 2020) with a third ship to follow for our Belfast-Liverpool service in early 2021, it’s also important that we continue to improve, develop and invest in our existing fleet of vessels, which is exactly what this contract will do.”

John Petticrew, Managing Director of Harland & Wolff said: “Since InfraStrata acquired the Harland & Wolff shipyard, we have built a strong working relationship with Stena Line, demonstrated through the repeat business we have seen with four ships in the yard since our acquisition.”

Belfast-based Paul Grant is head of the company’s Irish Sea operations. His long career at Stena Line includes a short spell working on the mentioned MV Galloway Princess. “We’re delighted that we are continuing our relationship supporting our local shipyard Harland and Wolff and the other local companies involved.  Stena Line continues to support Northern Ireland and have operated throughout the Coronavirus pandemic, ensuring that essential supply lines reach their destinations and enabling the flows of freight and travel customers” he said.

The ferry operator is the largest serving on the Irish Sea, with the biggest fleet offering the widest choice of routes including, combined passenger and freight serviceS: Belfast-Cairnryan, Belfast-Birkenhead (Liverpool), Dublin-Holyhead and Rosslare-Fishguard.

As well as a freight only route, Belfast-Heysham. A total of up to 238 weekly sailing options between Ireland and Britain. Stena Line also offers a direct service linking Rosslare and Cherbourg with three return crossings a week.

Published in Ferry

ESB’s 2040 strategy Driven to Make a Difference: Net Zero by 2040 sets out a clear roadmap for ESB to achieve net zero emissions by 2040. 

ESB will develop and connect renewable energy to decarbonise the electricity system by 2040. ESB will invest in the development of new renewable generation, including onshore and offshore wind and solar, and will significantly increase the amount of renewable generation connected to our electricity networks.

ESB will:

  • Deliver more than a fivefold increase in our renewable generation portfolio to 5,000MW.
  • Reduce carbon intensity of generation fleet from 414 to 140gCO2/kWh by 2030.
  • Decarbonise 63% of our generation output by 2030 and 100% by 2040 (up from c20% now).

Offshore wind

ESB know the importance of offshore wind in tackling climate change and delivering net zero. Ireland has a unique capability given its prime location to take advantage of the potential of offshore wind. ESB are working hard to develop offshore wind projects for the benefit of everyone across society in Ireland and the UK. This includes ongoing engagement with marine users and local communities so ESB can deliver these significant projects.

Offshore wind will play a major role globally in our fight against climate change. It will help to replace energy generated by burning fossil fuels with that from a clean, safe and secure renewable energy source. Ireland’s geographic location on the exposed edge of the Atlantic presents us with a significant opportunity to generate electricity from wind – both offshore and onshore.

Power from onshore wind farms currently provide over one-third of Ireland’s electricity needs. But, whilst its marine area is many times the size of its landmass, Ireland’s offshore wind potential is only starting to be realised. ESB have a coastline stretching over 3,000km but only one operational offshore wind farm – Arklow Bank, with a capacity of 25 MW. In contrast, Belgium’s coastline is only 63km long, but it has already developed more than 2,000 MW of offshore wind. In Great Britain, with a coastline four times the length of ours, offshore wind generation now equates to over 440 Arklow Banks, with an installed capacity of 11,0000 MW as of late 2021.

The Irish Government's target to install 5,000 MW of offshore wind capacity in our maritime area by 2030 is set out in the Climate Action Plan 2021. It also has the objective to source 80% of Ireland’s electricity needs from renewables by the same year. In line with this, ESB is applying its professional and proven engineering expertise to the challenges set within the Climate Action Plan.

ESB are committed to playing a strong role in developing Ireland’s offshore wind potential for the benefit of the people of Ireland. This will be done in consultation with marine users and local communities, and with due care for the marine environment.