Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Sunflower 2

#FERRY NEWS-A month from today sees the resumption of fast-ferry sailings on the Dun Laoghaire-Holyhead route, operated by Stena Line's HSS Stena Explorer, writes Jehan Ashmore.

The 120 minute central-corridor route closed in mid-September due to consistent high operating costs in recent years. This led to the withdrawal of the fuel-thirsty HSS craft which is powered by four gas-turbine engines.

In addition most of the route's turnover was generated in the high season months, leaving the remaining months unsustainable. As such the company decided to make the service as a seasonal-only operation. To read a previous report of the closure click HERE.

The ending of the year-round-service was the first major break to the route since the introduction of the pioneering HSS Stena Explorer in 1996 which in turn had replaced conventional tonnage. The Finnish built craft was the first of a trio of sisters commissioned for Stena Line and only this vessel remains in service for the operator.

Also operating on the route in recent years was the smaller fast-ferry craft Stena Lynx III which had served several high and low seasons, though she  will not be joining her larger fleetmate. The Tasmanian built Incat fastcraft was sold last year to South Korean interests as previously reported on Afloat. ie

Meanwhile the company's Dublin-Holyhead route is maintained by conventional tonnage vessels, Stena Adventurer and Stena Nordica which operate the 3 hour 15 minute service.

Published in Ferry
Irish Sea fast-ferry Stena Lynx III (1996/4,113grt) which has been laid-up in Dun Laoghaire Harbour since last month has been sold to interests in South Korea. Renamed Sunflower 2 and flying the flag of the Far-Eastern nation, she departed yesterday afternoon on a delivery voyage expected to take around twenty-five days, writes Jehan Ashmore.
The Dublin Port pilot cutter Camac was in attendance as the 650 passenger/153 vehicle fast-ferry departed at 16.20hrs. She is re-registered in Busan, South Korea's second largest city, located in the south-east, where she is to operate to the island of Jeju off the country's south-west coast.

Sunflower 2 is to make bunker calls on the repositioning voyage, firstly in Valletta, Malta before she transits the Suez Canal to the Red Sea port of Jeddah, Saudi Arabia and Columbo, Sri Lanka. From there she transits the Strait of Malacca then through the South China Sea followed by the East China Sea before finally entering the Strait of Korea to her homeport of Busan.

Since 1999 she has served Stena Line's fast-ferry high-season Rosslare-Fishguard route sailings taking 1 hour 50 minutes in tandem with conventional ferry Stena Europe (1981/24,828grt) which currently maintains the year-round 3 hours 30 minutes route. It is believed that Stena Line will not be operating high-season fast-ferry services in 2012.

Prior to her Dun Laoghaire departure, her South Korean crew have been preparing the craft over the last three weeks. Notably there was the removal of all Stena Line corporate livery markings on the hull. Her new name and port of registry were painted at the stern though she retained her original name at the bow which included both symbols of an Irish shamrock aptly to starboard (green) and the Welsh dragon to port (red) to reflect her Irish Sea southern corridor route.

Stena Lynx III departing Dun Laoghaire last year, note her starboard 'Shamrock' at the bow.

In recent years on the St. Georges Channel route she was marketed as the Stena 'Express'. Her final sailing this year was 4 September and three days later she docked Dun Laoghaire at St. Michaels Pier. On the adjacent berth which is designed specifically for and only capable of accommodating the HSS 1500 class fast-ferries.

Stena Lynx III also ran several shoulder season stints on the Dun Laoghaire-Holyhead route with the HSS Stena Explorer (1996/19,638grt) only running during the busier summer months. During this summer all sailings were maintained by HSS Stena Explorer until the route became a seasonal-only service for the first time this year when the last sailing took place in mid-September. The HSS remains in layover for the winter in Holyhead at her dedicated berth. The route is due to re-open in April or May.

The 35 knot Stena Lynx III was launched from fast-ferry catamaran specialists InCAT Pty based in the Tasmanian capital of Hobart. Early in her career the 81m wave-piercing catamaran (WPC) craft served Dover-Calais followed by two seasons between Newhaven-Dieppe when renamed P&O Elite for joint operators P&O Stena Line.

Her predecessors the WPC InCat 74m Stena Sea Lynx, became the first car-carrying catamaran to operate Dun Laoghaire-Holyhead sailings in 1993. The pioneering water-jet propelled craft was replaced in subsequent years by the larger InCAT 78m Stena Lynx II.

She was replaced in 1996 when the revolutionary four gas-turbine engine water-jet propelled HSS Stena Explorer was introduced. A further two sisters of the HSS 1500 class (High-speed Sea Service) were completed by Finnyards in Rauma.

Published in Ferry

ESB’s 2040 strategy Driven to Make a Difference: Net Zero by 2040 sets out a clear roadmap for ESB to achieve net zero emissions by 2040. 

ESB will develop and connect renewable energy to decarbonise the electricity system by 2040. ESB will invest in the development of new renewable generation, including onshore and offshore wind and solar, and will significantly increase the amount of renewable generation connected to our electricity networks.

ESB will:

  • Deliver more than a fivefold increase in our renewable generation portfolio to 5,000MW.
  • Reduce carbon intensity of generation fleet from 414 to 140gCO2/kWh by 2030.
  • Decarbonise 63% of our generation output by 2030 and 100% by 2040 (up from c20% now).

Offshore wind

ESB know the importance of offshore wind in tackling climate change and delivering net zero. Ireland has a unique capability given its prime location to take advantage of the potential of offshore wind. ESB are working hard to develop offshore wind projects for the benefit of everyone across society in Ireland and the UK. This includes ongoing engagement with marine users and local communities so ESB can deliver these significant projects.

Offshore wind will play a major role globally in our fight against climate change. It will help to replace energy generated by burning fossil fuels with that from a clean, safe and secure renewable energy source. Ireland’s geographic location on the exposed edge of the Atlantic presents us with a significant opportunity to generate electricity from wind – both offshore and onshore.

Power from onshore wind farms currently provide over one-third of Ireland’s electricity needs. But, whilst its marine area is many times the size of its landmass, Ireland’s offshore wind potential is only starting to be realised. ESB have a coastline stretching over 3,000km but only one operational offshore wind farm – Arklow Bank, with a capacity of 25 MW. In contrast, Belgium’s coastline is only 63km long, but it has already developed more than 2,000 MW of offshore wind. In Great Britain, with a coastline four times the length of ours, offshore wind generation now equates to over 440 Arklow Banks, with an installed capacity of 11,0000 MW as of late 2021.

The Irish Government's target to install 5,000 MW of offshore wind capacity in our maritime area by 2030 is set out in the Climate Action Plan 2021. It also has the objective to source 80% of Ireland’s electricity needs from renewables by the same year. In line with this, ESB is applying its professional and proven engineering expertise to the challenges set within the Climate Action Plan.

ESB are committed to playing a strong role in developing Ireland’s offshore wind potential for the benefit of the people of Ireland. This will be done in consultation with marine users and local communities, and with due care for the marine environment.