Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: canoeing,

#CANOEING: Newly-qualified Olympian Andrzej Jerzieski finished fifth in the B Final (14th overall) in the C1 200 metres at the Canoe Sprint World Cup in Poznan in Poland today.

Canoe Sprint World Cup, Poznan, Day Two (Irish interest)

Saturday

Men

C1 200 – Heat Three (1-7 and next best time to Semi-Final) 7 A Jezierski 48.652. Semi-Final (1-2 and next best time to A Final; 3-4 to B Final): 4 Jezierski 42.663.

K1 1,000m – B Final: 4 B Watkins 3:53.405

K2 200 – Heat Two (1-6 and next 3 best times to Semi-Final): 8 P Egan, M Majchrzak) 37.239. Heat Four: 7 S Marchetti, V Peirce 35.798. Semi-Final: 8 Marchetti, Peirce 35.776.

Women

K1 500m – C Final: 7 J Egan 2:10.730.

Sunday

Men

C1 200m – B Final: 5 A Jezeierski 44.204

Women

K1 5,000m – Final: Egan did not finish.

Published in Canoeing

CANOEING: New Ireland star Andrzej Jezierski qualified for the B Final at the canoe sprint World Cup in Poznan in Poland. Jezierski finished fourth in his semi-final, just over three tenths of a second off the second place which would have put him in the A Final. Jezierski booked his place for the Olympic Games at the same venue in the Olympic Qualifier on Thursday.

Canoe Sprint World Cup, Poznan, Day Two (Irish interest)

Men

C1 200 – Heat Three (1-7 and next best time to Semi-Final) 7 A Jezierski 48.652. Semi-Final (1-2 and next best time to A Final; 3-4 to B Final): 4 Jezierski 42.663.

K1 1,000m – B Final: 4 B Watkins 3:53.405

K2 200 – Heat Two (1-6 and next 3 best times to Semi-Final): 8 P Egan, M Majchrzak) 37.239. Heat Four: 7 S Marchetti, V Peirce 35.798

Women

K1 500m – C Final: 7 J Egan 2:10.730.

Published in Canoeing

#CANOEING: Ireland’s Barry Watkins reached two semi-finals at the ICF Canoe Sprint World Cup in Poznan in Poland today. He came closest to reaching the A Final in the K1 500 metres - he finished fourth in the semi-final, having won his heat. In the K1 1,000 metres he was second in his heat and fifth in the semi-final.

Jenny Egan reached the semi-final of the K1 500 metres, where she finished sixth.  

Canoe Sprint World Cup, Poznan, Poland (Irish interest)

Men

K1 1,000m – Heat Five (1-6 to semi-final): 2 Ireland (B Watkins) 3:44.458. Semi-Final Two (1-2 and 3rd best time to A Final): 5 Watkins 3:58.572

K1 500 Heat Five (1-7 and one best time to Semi-Final): 1 Watkins 1:49.747. Semi-Final (1-2 and next best time to A Final): Watkins 1:49.618

Women

K1 500 – Heat One (1-6 to semi-final): 5 Ireland (J Egan) 2:07.163. Semi-Final One (1-2 and 3rd best time to A Final) 6 Egan 2:09.263.

Published in Canoeing
Page 2 of 2

ESB’s 2040 strategy Driven to Make a Difference: Net Zero by 2040 sets out a clear roadmap for ESB to achieve net zero emissions by 2040. 

ESB will develop and connect renewable energy to decarbonise the electricity system by 2040. ESB will invest in the development of new renewable generation, including onshore and offshore wind and solar, and will significantly increase the amount of renewable generation connected to our electricity networks.

ESB will:

  • Deliver more than a fivefold increase in our renewable generation portfolio to 5,000MW.
  • Reduce carbon intensity of generation fleet from 414 to 140gCO2/kWh by 2030.
  • Decarbonise 63% of our generation output by 2030 and 100% by 2040 (up from c20% now).

Offshore wind

ESB know the importance of offshore wind in tackling climate change and delivering net zero. Ireland has a unique capability given its prime location to take advantage of the potential of offshore wind. ESB are working hard to develop offshore wind projects for the benefit of everyone across society in Ireland and the UK. This includes ongoing engagement with marine users and local communities so ESB can deliver these significant projects.

Offshore wind will play a major role globally in our fight against climate change. It will help to replace energy generated by burning fossil fuels with that from a clean, safe and secure renewable energy source. Ireland’s geographic location on the exposed edge of the Atlantic presents us with a significant opportunity to generate electricity from wind – both offshore and onshore.

Power from onshore wind farms currently provide over one-third of Ireland’s electricity needs. But, whilst its marine area is many times the size of its landmass, Ireland’s offshore wind potential is only starting to be realised. ESB have a coastline stretching over 3,000km but only one operational offshore wind farm – Arklow Bank, with a capacity of 25 MW. In contrast, Belgium’s coastline is only 63km long, but it has already developed more than 2,000 MW of offshore wind. In Great Britain, with a coastline four times the length of ours, offshore wind generation now equates to over 440 Arklow Banks, with an installed capacity of 11,0000 MW as of late 2021.

The Irish Government's target to install 5,000 MW of offshore wind capacity in our maritime area by 2030 is set out in the Climate Action Plan 2021. It also has the objective to source 80% of Ireland’s electricity needs from renewables by the same year. In line with this, ESB is applying its professional and proven engineering expertise to the challenges set within the Climate Action Plan.

ESB are committed to playing a strong role in developing Ireland’s offshore wind potential for the benefit of the people of Ireland. This will be done in consultation with marine users and local communities, and with due care for the marine environment.