Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Bangor Bay

From Skippingstone Beach on the west side of Bangor Bay on Belfast Lough to the RNLI slipway in the Harbour is 800 metres and last week 200 swimmers raced that distance in the swim called the 'Pickie to Pier' named when it began back in 1910. It was run until 1989 and resurrected in 2019, then suspended during the Pandemic, only to be held again last year.

Pickie was the name of the open-air swimming pool near Skippingstone, long since demolished and in those days, there wasn’t the comfort of accompanying boats, kayaks and paddle boards for safety. One old hand said they just raced across the Bay to the Pier and that was that!

At the Picklet to Pier finishAt the Pickie to Pier finish

The 200-strong group was made up of around 60% female and 40% male. The first four finishers were all women. First was Jessika Robson who won last year, in 9 minutes 15 seconds. Second was Jessika’s sister, Holly just 10 seconds later to be followed by Sian Clements in 9min 45sec.

The event drew large crowds and is no doubt now an established popular part of the Seaside Revival organised by Open House Festival, a charitable organization working towards the regeneration of Bangor.

Published in Sea Swim

Last Saturday (10th July) saw the resurrection of the famous Pickie to Pier swim in Bangor Bay after its cancellation last year due to Covid. Pickie is the previous site of the original sea water swimming pool on the west side of the Bay, which was demolished in the late 1980s to be replaced by a heated indoor pool, and the Pier is the old North Pier, now named Eisenhower Pier in memory of June 1944 when General Eisenhower inspected American troops gathered in Belfast Lough.

The 2019 event was held after a 30-year absence.

First home and taking the Women’s title was Jessika Robson in just seven minutes, followed by Gary Robinson winning the men’s section for the second time in a row.

Jessica Robson centre, first Woman in the Pickie to Pier race with Gary Robinson, first Man and (left) Caroline McCoubrey Seaside Revival Co-ordinator and (right) Alan Whyte, Ballyholme YCJessica Robson centre, first Woman in the Pickie to Pier race with Gary Robinson, first Man and (left) Caroline McCoubrey Seaside Revival Co-ordinator and (right) Alan Whyte, Ballyholme YC

As told in Afloat.ie in January last year, the swim to the pier pre-dates the Bangor swimming club – the 18th annual swim was organised by Donegall Amateur Swimming Club based in Belfast IN 1910. But the Men’s trophy went missing and has never been found.

The Swim organisers from the Seaside Revival Vintage Festival said;  “We're still grinning from ear to ear after yesterday's epic Pickie to Pier Swim. So many smiles, and whoops and cheers of encouragement for the 200 intrepid swimmers who took part in our 2021 Pickie to Pier Swim. The sun shone, the water was calm and clear, and the swimmers and spectators were all very happy people”.

RNLI Bangor after duty at the Pickie to Pier swimRNLI Bangor after duty at the Pickie to Pier swim.jpg

The swimmers swam the 800m course from Skippingstone Beach beside Pickie, to the RNLI slipway at Eisenhower Pier and were sent off and greeted at the finish by huge crowds of spectators.

Paddle board safety volunteers at the Pickie to Pier swimPaddle board safety volunteers at the Pickie to Pier swim

Seaside Revival thanked Alan Whyte and Ballyholme Yacht Club, Marina Manager Kevin Baird and all the volunteers who secured the swimmers on boats, kayaks and paddle boards; the RNLI, and Spar Ballyholme, Spar Gransha Road and Spar Abbeyhill for their support.

Published in Sea Swim

Bangor Coastguard Rescue Team didn't have far to travel to answer a report today (21st June) of a vessel aground on the rocks at Brompton on the opposite side of Bangor Bay from the Belfast Lough station.

Winds were strong from the North with rough seas and breaking waves.

The team managed to contact the owner, who arrived a short time later.

All belongings, engine and fuel were removed from the vessel by the owner, and the hope was that it could be refloated at the next high tide.

Published in Coastguard
Tagged under

Today you couldn’t swim across Bangor Bay on Belfast Lough without skirting the Marina but from 1910 till the 80s the ‘Pickie to Pier’ annual sea swim saw many participants taking part in the 650-metre race from Skippingstone Beach, beside what is now Pickie Fun Park, to the then North Pier, now named the Eisenhower Pier, and back.

Now, in its Seaside Revival programme, the Open House Festival which runs in August every year in Bangor, the Pickie to Pier race is being held again, (in 2020 it is on July 4th) but sadly, the men’s prize, the Lyttle Trophy is missing! The ladies are lucky, however, as their prize is still intact. It is named the Connor Shield after a well-known old Bangor family.

So, the hunt is on for that trophy. Local businessman David McCullough won the race in the late 1960s when he was around 12 years old and remembers the trophy had three handles.

Picke to Pier swim winners 2019 Julie MCabe and Gary RobinsonjpgPickie to Pier swim winners 2019 Julie McCabe and Gary Robinson

The swim to the pier pre-dates the Bangor swimming club – the 18th annual swim was organised by Donegall Amateur Swimming Club based in Belfast. By the time Bangor ASC was formed, there were inter-club races to the pier featuring Wellington, New Alliance and Northern swimming clubs. BASC swam the route weekly, and the Pickie to Pier race carried on through two world wars but met its demise in the late 1980s when a new heated indoor pool was favoured to the freezing cold, jellyfish-laden waters of Bangor Bay.

According to one of the local librarians who has done some research, it is probable that 1918 was the 18th year of the race but no evidence that it started in 1910 could be found in the local press. The race did continue through WWII but there is a gap in the library reels from 1916 – 25 so those years cannot be checked. Generally, the race was run for individuals in a handicap system according to how good a swimmer they were – the faster you were, the longer you had to wait before starting off. There was also a team event for the Gamble Memorial Trophy.

Pickie to Pier poster re missing trophyPickie to Pier poster appeal for the missing trophy

Before Pickie Pool was built in 1931, gentlemen swam in that area and the ladies swam just below the large mansion called Seacourt in what was called ‘Ladies Bathing Place”.

Many people who did the race remember how cold it was, even in August; the horrors of being touched by the seaweed and stinging jellyfish as well as the distance, all presented a huge challenge. One of the competitors remembers the coal boat leaving harbour during the race, creating chaos. But what amounts to a questionable memory is that of a competitor who did the swim with a bottle of Olde English (an American malt liquor) in one hand and a Rod Stewart album in the other!

So if you can help please contact Caroline McCoubrey [email protected]

Published in Belfast Lough
Tagged under

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020