Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: First 375

A First 375 has appeared on Afloat's Boats for Sale this week and there’s a timeless elegance to the general appearance and lines of the First 375 which suggests something beyond basic naval architecture in her creation writes W M Nixon. So it’s no surprise to learn that designer Jean Berret was a student at a very distinguished art school before his love of sailing, and offshore racing in particular, steered him into the professional designing of boats which he’d like to sail himself, and in 1985 the First 375 for Beneteau was signed off from his drawing board.

This 1988-built First 375 is based in Howth Yacht Club Marina, and is for sale through Leinster Boats. She certainly seems to have done what’s expected of her, as she has had only two previous owners. But as she is largely unchanged from new – including the original 28hp Volvo Penta diesel auxiliary – her sensible price of €31,950 reflects this, as some potential owners might think in terms of an early engine upgrade for this 28-year-old boat, planning on installing a more powerful yet lighter type of motor.

Against that, I was with a couple of happy co-owners on another cruiser of a certain age the other day who still cruise with their original vintage Volvo, and they wouldn’t dream of having anything else. Its weight gives it endurance, and it’s tops on fuel consumption too – “It would run on the smell of an oily rag” I was assured.

In this version of the First 375, the accommodation has been so arranged that you could sleep eight if needs be, but as there’s only one toilet that might feel a little crowded, and a more civilized approach would be no more than six with the saloon settee berths used only as settees. For four, she would be decidedly commodious, a very civilised fast cruiser which could give a good account of herself in local racing. As for her looks, you’re almost into “Spirit of Classics” territory here, she looked good when she was new, and she still looks good.

Read the full advert on Afloat's Boats for Sale here

Published in Boat Sales
Tagged under

East Coast inshore campaigner Lively Lady (Derek Martin) left Dublin Bay racing behind yesterday for ISORA's offshore race to Rockaill and won. The Royal Irish boat, a Beneteau First 44.7, topped a 13-boat fleet over the 50 mile course to Rockabill. It was the second ISORA race of the 2011 calendar.

Second overall was another Beneteau, Walter Mitty, Stephen Mullaney's First 375 from Howth Yacht Club. Third was Jedi, Andrew Sarratt's J109 from Dun Laoghaire.

Yesterday's race was a much more pleasant start to the season compared to the previous weekend's pasting taken during the slog across the Irish Sea to Holyhead. Perhaps that was the reason for the drop off in entries from 21 to 13?  Next Saturday's ISORA fixture features another cross Irish Sea venture, this time to Pwhelli.

Race two results are available for download below. Latest ISORA news here.

ISORA Commodore Peter Ryan adds: 

It had been hoped that there would be a bumper fleet out for this popular day race run in conjunction with the Royal Alfred Yacht Club and the Lee Overlay Offshore Series but despite 25 entries, only 15 came to the start line. The heavy offshore race to Holyhead and delivery back the previous weekend and the strong winds all the week since then, had taken its toll with damage to boats and crew and boats not being to get to Dun Laoghaire.

The weather forecast for the day was for wind force 3-5 south east going east. The original course was to go south to North Arklow buoy. However, with the strong spring tides going north at the start and the light winds forecast, the Sailing Committee decided that going north to Rockabill would ensure a finish would be achieved to all boats. The course was: Start – North Burford(P) – Lambay (P) – Rockabill (S) – Lambay (S) – Kish Light (S) – Finish at Dun Laoghaire Harbour (45 miles).

Paul McCarthy of the RAYC provided the start at 10.00 and the fleet set off on a white sail reach towards North Burford. The wind was as forecast, south east force 3-4. Rounding that mark, spinnakers were raised and the fleet sped north with the tide. Shorthy after 12.00 “Lively Lady” rounded Rockabill followed by “English Mick”, “Orna” and directly behind her “Tsunami”.

The leg back to Kish was a beat keeping Lambay to starboard. The wind fluctuated with the stronger wind being out to sea. Most boats tacked behind Lambay to get the benefit of some lack tides in the lee of the island.

The wind was holding as the fleet neared Kish. First round was “Lively Lady” followed by “English Mick”, “Tsunami”, “Orna” and “Jedi”. As forecast the wind backed to east and dropped. What was looking like a charge to the finish turned out to be a crawl. Many of the boats at the back of the fleet gained by a temporary filling of the wind from behind as they caught up with the leading pack. However, “Lively Lady” and “English Mick” held their positions and crossed the line first and second. “Jedi” and “Orna” crept past “Tsunami” to cross the finish.

“Lively Lady” took line honours, 1st in Class and 1st Overall. “Jedi” took 1st in Class 2 while “Walter Mitty” won Class 3.

Sandra Moore of the NYC provided the finish. The usual après sail took place in the NYC after the race.

The next race is the Day Race in Pwllheli on the 14th May. It is hoped that the day race there will attract some new entrants from the Welsh side.

 

RankFleetBoatSailNoTypeRatingStartFinishElapsedCorrectedPoints
1Class 1Lively LadyIRL 1644First 44.71.10910.00.0016:21:006.21.007.02.3298.6
2Class 3Walter MittyIRL 7963First 3750.94710.00.0017:36:387.36.387.12.2692.8
3Class 2JediIRL 8088J1091.02910.00.0017:05:157.05.157.17.3587.0
4Class 1OrnaIRL 532 1.04710.00.0017:13:187.13.187.33.4081.2
5Class 2Lula BelleIRL 3607First 36.71.01910.00.0017:28:557.28.557.37.2775.4
6Class 3WindshiftIRL 37737SF370.99210.00.0017:41:597.41.597.38.1769.6
7Class 2First of SeptemberIRL 8581First 43.51.01710.00.0017:32:417.32.417.40.2363.9
8Class 1TsunamiIRL 4007First 40.71.06110.00.0017:15:007.15.007.41.3258.1
9Class 1English MickGBR4771RBeneteau 47.71.13010.00.0016:50:076.50.077.43.2652.3
10Class 2Miss ScarlettIRL 4763Sunfast 40.31.02510.00.0017:33:067.33.067.44.2646.5
11Class 3YahtzeeIRL 1068Oceanis 4110.98310.00.0017:57:517.57.517.49.4440.7
12Class 1Sailing West IntuitionGBR 9383Reflex 381.06010.00.0017:28:337.28.337.55.2834.9
13Class 1RebellionIRL 6001Nicholson 581.05410.00.0017:39:227.39.228.04.1029.1
14Class 1African ChallengeIRL 2649Fast 421.07710.00.0017:33:117.33.118.08.0523.4
15Class 3ObsessionIRL4513Sigma 330.905 DNF 10.0
Published in ISORA

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020