Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Foynes

This coming weekend an action-packed programme of events will take place at Foynes Yacht Club

On Saturday, the Glin Castle race will take place, and on Sunday the Cappa race is also pencilled in the the sailing schedule (weather permitting).
The Glin Castle race is an annual event between the hosts, the Royal Western Yacht Club in Kilrush, and Foynes Yacht Club, and this is one of the highlights on the Shannon Estuary's sailing calendar, where it has been raced for quite a considerable amount of years between the two clubs.
The Knight of Glin, Desmond FitzGerald and his family are 'very much in favour' of this event being raced for the forseeable future.
This race will start at Glin Pier with first gun at 11am. The boats will race east to different 'marks' laid on the estuary, and back up to Glin Pier, which will be the finish line.
After the race a prizegiving ceremony will be hosted by the Knight and his family in Glin Castle, this will take place at 5pm approximately.
On Sunday, the Cappa race is scheduled to take place with first gun at 11am from Cooleen Point. Again, this is an annual event for the Cappa Cup, prizegiving will take place after racing in the Galleon Inn, Cappa.
On Sunday last 5 Yachts and 2 Mermaids from Foynes Yacht Club sailed east of Cooleen Point for the annual Cannon Island Mass at 3pm. This Mass was said at 5pm in the ruins of the old Franciscian Abbey, where the public of Kildysart converge on the Clare Island. 5 yachts 2 mermaids
Club racing continues every Wednesday evening with first gun at 7pm sharp. Skippers and crew are asked to be at the marina at 6pm. Please note that buoyancy aids have to be worn by all members.

Published in Shannon Estuary
Jim Dempsey from Skerries with crew Scott Flanagan and Cian O'Regan won Mermaid week in Paul Winters' No. 183 Wannago (based on provisional results).  Dempsey was 2nd in Thursday's Race 5, sailed in shifty 7-10 knot westerly breeze at Foynes on the lower Shannon.  This was enough to secure him an unassailable first place and he didn't even have to the final Race 6 today. Four times winner Jim Carthy in 123 Vee was 2nd overall and  Paddy Dillon in 131 Wild Wind was 3rd on equal points with Carthy.

The new champion has previously won Mermaid Week in 1987 and again in 2000, sailing his own boat No. 36 Elizabeth.  Paul Winter's boat, No. 183 Wannago has won Mermaid Week once before, in Fenit in 2002, helmed by her builder and former owner Sam Shiels.

The winner of the Daphne (Silver fleet, 12 boats) was Geraldine O'Neill in 73 Lively Lady crewed by her husband Mick Hanney (President of Mermaid Sailing Association) and Ailbhe Smith.  O'Neill, like Dempsey didn't have to sail on the last day to secure the trophy.

IMG_0284

The Mermaid Start for Race 6 today in a 22 knot breeze on the Shannon Estuary

The Designer (Bronze fleet, 23 boats), unlike the others was down to the bitter end with Mark McCormack (54 Hycilla) and Paddy Archer (18 Clare) being the main contenders. But retirements of 54 and 18 due to gear failure in squalls allowed Mark Boylan of Skerries (177 This is It) sailing a boat built by his grandfather Joe to achieve overall victory.

Overall results:
1st 183 Wannago Owner Paul Winters, Helm Jim Dempsey, Crew Cian O'Regan and Scott Flanagan of Skerries - 8 points
2nd 123 Vee Owner & Helm, Jim Carthy, Crew Paula & Muriel Carthy of Rush - 13 points
3rd 131 Wild Wind Owner & Helm, Paddy Dillon, Crew Johnny Dillon & Rory Grimes of Rush- 13 points
4th 188 Innocence Owner & Helm, Anthony Carthy, Crew Marguerite Carthy and Eoin Butterly of Rush - 24 points
5th 187 Zuleika Owner & Helm, Derek Joyce, Crew Cillian Joyce and Darragh Hassey of Wexford - 29 points
6th 135 Cara II Owner & Helm, Frankie Browne, Crew Marina & Frankie Browne Jnr of Skerries - 30 points

Daphne -  73  Lively Lady Owner & Helm Geraldine O'Neill, Crew Mick Hanney, Ailbe Smith of National Yacht Club
Designer -  177 This is It Owner Joe Boylan, Helm Mark Boylan, Crew Niall Collins & Graham Daly of Skerries

Published in Shannon Estuary
Jim Dempsey from Skerries with crew Scott Flanagan and Cian O'Regan won Mermaid week in Paul Winters' No. 183 Wannago (based on provisional results).  Dempsey was 2nd in today's Race 5, sailed in shifty 7-10 knot westerly breeze at Foynes on the lower Shannon.  This was enough to secure him an unassailable first place and he doesn't even have to sail Race 6 tomorrow. Contender and last year's champion Paddy Dillon in 131 Wild Wind was 6th today, and is this is now his discard, he cannot make up the gap on points with Dempsey.  Similarly four times winner Jim Carthy in 123 Vee's 4th didn't do the job either.

Jonathan O'Rourke's No.77 Tiller Girl won today, leading the fleet the for the first half and then tussling with No 187 Zuleika for the 2nd half, eventually winning out on the last beat.  There was considerable place swapping further down in the fleet.  Of particular interest is the four McCormack boats competing for the Munster trophy.  Brothers James and Vincent, and James' sons Darragh and Mark are competing in their four Mermaids and all in the running for the Munster trophy (9 boats eligible).  They went around the 2nd leeward mark in a raft today, though without troubling the protest committee. It looks like it will be down to the last beat on the last day (tomorrow, Race 6).

The new unofficial champion has previously won Mermaid Week in 1987 and again in 2000, sailing his own boat No. 36 Elizabeth.  Paul Winter's boat, No. 183 Wannago has won Mermaid Week once before, in Fenit in 2002, helmed by her builder and former owner Sam Shiels.

The unofficial winner of the Daphne (Silver fleet, 12 boats) was Geraldine O'Neill in 73 Lively Lady crewed by her husband Mick Hanney (President of Mermaid Sailing Association) and Ailbhe Smith.  O'Neill, like Dempsey doesn't have to sail tomorrow to secure the trophy.

The Designer (Bronze fleet, 23 boats), unlike the others will be down to the bitter end with Mark McCormack (54 Hycilla) and Paddy Archer (18 Clare)being the main contenders.

All of the above is provisional information as Protest Time is still open for Race 5 until 20:41 this evening and overall championship results will not be confirmed officially until after 17:00 on Friday 6th August.

For the first time this year, the Mermaid Sailing Association and Foynes Yacht Club have been running a live blog during racing with updates every few minutes from the committee boat, supported by analysis from the race office.  Live photos are also posted on the blog, including contentious start lines and boat on boat action.  In today's racing over there were over 700 views of the blog and more than 100 on line at www.dublinbaymermaid.org/foynes2010 <http://www.dublinbaymermaid.org/foynes2010>  simultaneously.

Mermaid Week concludes tomorrow with Race 6.  33 boats are competing. Follow the Live Commentary at for news of any protest this evening and during racing tomorrow from 13:00.

Published in Shannon Estuary
Skerries sailor Jim Dempsey, sailing his clubmate Paul Winters' Wannago, totally dominated today's Race 4 at Mermaid Week in Foynes.  He led the 30 boat fleet the whole way around, with a constant battle and place swapping for 2nd place between last year's winner Paddy Dillon (Wild Wind) and his former skipper Jim Carthy (Vee), both from Rush.  There were battles further down the fleet as well, with uncle and nephew James and Mark McCormack of Foynes constantly swapping places.
Conditions were lively, with 22 knots of breeze from the NNW at times.  Spinnaker handling skills were tested and a number of crews went for a swim as the spinnakers took the boats over in
the gusts.  One of those was Frankie Browne in his recently restored Cara II.  He recovered well, bailed the boat and fought his way back up the fleet, picking off two boats on the finish line.
Race 5 tomorrow is at 16:00, after which the discard applies.  33 boats are competing and racing concludes on Friday.
You can follow all the action live on the Live Commentary blog, with real time photos from the Committee Boat and Race Office: http://www.dublinbaymermaid.org/foynes2010/index_files/Commentary.htm
Race 4: 1st Wannago, 2nd Vee, 3rd Wild Wind, 4th Innocence, 5th Zuleika, 6th Tiller Girl, 7th The Message, 8th Thumbalina, 9th Helen and 10th Fugitive. 3 boats DNS, 3 boats RTD.

Overall after Race 4: 1st Wannago, 2nd Wild Wind, 3rd Vee, 4th Innocence, 5th Dolphin, 6th Jill, 7th Lively Lady, 8th Cara II, 9th Fugitive, 10th Zuleika.

Daphne Fleet Overall after Race 4: 1st Lively Lady, 2nd Thumbalina, 3rd Swallow
Designer Fleet Overall after Race 4: 1st Hycilla, 2nd Clare, 3rd Syrena
Munster Fleet Overall after Race 4: 1st Hycilla, 2nd Argo, 3rd Three Chevrons

Published in Shannon Estuary

Race 3 of the National Mermaid Championship starts today at 15:00, followed by the annual 'crew' race.  Five times champion Derek Joyce in 187 Zuleika has a major challenge to stay in the running and really needs a win to stay in contention.  The stiffer breezes foretasted today should suit him.  Another boat with some work to do is 131 Wild Wind, sailed by last year's champion Paddy Dillon; as he is lying third overall at seven points, he needs to stay in the top three today.

Yesterday's winner, Shay O'Toole (182 Dolphin) is lying 6th overall and another win today could put him in contention for the Championship.  Current overall leader Jim Dempsey (183 Wannago), with two seconds under his belt, needs to maintain consistency as four times champion Jim Carthy (123 Vee) is hot on his heels just one point behind.

Of the 186 Mermaids built since 1932, some have been built by professionals and some by amateurs.  Amateur is, perhaps not the best word as many Mermaid sailors are carpenters, furniture makers and woodwork teachers by profession and have build fast boats to exacting standards.  The most prolific builders over the years have been John Brennan of Dun Laoghaire (16 boats), James Kearney (15 boats) and Skee Gray (10 boats).

Of the thirty three boats competing this week, Brennan built three, Harry & Tom Grieves built three and Des Tyrell built three.  Four sailors are on board boats they built themselves: Frankie Browne (135 Cara II), Martin O'Toole (179 Bean Adhmaid), Shay O'Toole (182 Dolphin) and Ross Galbraith (185 The Message).  Former champion Joe Boylan built the boats being sailed by his son Aidan (138 Zeila) and grandson Mark (177 This Is It).

If there was a Formula 1 style 'Constructor's Championship', the top three builders since 1953 would be: Harry & Tom Grieves, 9 wins; John Brennan, 8 wins and Des Tyrell, 7 wins.  This year the Grieves boats are 73 Lively Lady, 76 Helen and 77 Tiller Girl.  The Brennan boats are 131 Wild Wind, 143 Jill and 146 Fugitive, while the Tyrell boats are 186 MyDi, 187 Zuleika and 188 Innocence.  It's all to play for.

Live updates will be blogged from the race area today at http://www.dublinbaymermaid.org/foynes2010/index_files/Commentary.htm

Published in Shannon Estuary
After a two hour postponement the slack winds filled in for a Race Officer Liam Dinneen allowing him to run today's first race of Mermaid week in near perfect conditions with NW 9 knots and sunshine.  There are thirty three boats racing, from clubs in the Dublin area, Wexford and of course Foynes.  The oldest boat sailing this week is No. 11 Oonagh built in 1937 whilst the newest boat is No. 188 Innocence built in 1997.

All age groups are sailing from pre-teen to some in their eighties.  There are five pairs for brothers helming ten competing boats - Enda and Anthony Weldon from Rush, James and Vincent McCormack from Foynes, James's sons Darragh and Mark McCormack, Jim and Anthony Carthy from Rush and veterans Shay and Martin O'Toole from Skerries.  There are also many husband/wife crews.

Frankie Browne of Skerries in Cara II (No. 135) got a great start and built on his lead during the first beat and again on the first run.  He lead for the first eight legs, but on the ninth and last leg he failed to cover effectively and was beaten by Jim Carthy in No. 123 Vee (Rush) in 1st and Jim Dempsey in No. 183 Wannago (Skerries).

The 2009 Champion, Paddy Dillon (131 Wild Wind, Rush) was a solid fourth, with Anthony Carthy (188 Innocence, Rush) in fifth.  Derek Joyce (187 Zuleika, Wexford) who had been in the top three also lost out on the last beat and came in sixth.

The winner of the "Daphne" fleet (equivalent of Silver Fleet) was Alan Berg of Rush, sailing No 93 Swallow.  The winner of the "Designer" fleet was Mark Boylan in No. 177 This Is It, sailing a boat his father Joe built and sailed for many years.  Best local boat was Vincent McCormack in No 119 Three Chevrons.

Racing today starts at 10:30 with live updates on the Mermaid Week website http://www.dublinbaymermaid.org/foynes2010/index_files/Commentary.htm.

Published in Shannon Estuary
Anthony Carthy was flying today in the practice race at Mermaid Week at Foynes. The race started at 14:30 in a brisk westerly breeze and squalls up to 22 knots. Anthony and his crew Margeurite Carthy and Eoin Butterly from Rush Sailing Club were on board No. 189 Innocence. For much of the race five times championship winer Derek Joyce, sailing 187 Zuleika was hot on their heels until Derek decided to retire towards the end of the race. Also going fast were 124 Jill (Paul Smith, Pat Mangan, Anne Smith of NYC) and 26 Thumbalina (Patrick Boardman, Vincent Coleman and Darren Kane of RSC).

Local boat 46 Argo sailed by Darragh McCormack, Donal Moroney and Luke Murray were a convincing fourth and are showing a turn of speed, rewarding their practice in the past few months and work on the boat last winter. The 2009 champion 131 Wild Wind sailed by Paddy Dillon of Rush, retired early in the race.

There were three capsizes and some minor gear damage as the squalls came through past Foynes Island. Principal Race Officer Liam Dineen of Skerries set up a balanced course, with boats going up both sides of the beat, a slightly tight first reach and a square run.

The real racing starts tomorrow with Race 1 at 14:00.

Catch up with the latest Mermaid Week news and live updates during racing at www.dublinbaymermaid.org/foynes2010

Published in Racing
Page 4 of 4

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020