Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Henley Royal Regatta,

#Rowing: Henley Royal Regatta did not yield any early joy for Irish crews this morning. In the Wyfold Cup coxless fours, Lady Elizabeth were beaten by Nottingham Rowing Club ‘A’. The English crew cut across from their station at the start and took a lead which they did not relinquish. Lady Elizabeth tried hard in the warm conditions, but their young opponents held on to their lead and won by two and a half lengths.

Henley Royal Regatta, Day One (Irish interest)

Wyfolds (Fours, Club): Nottingham RC ‘A’ bt Lady Elizabeth BC 7 mins 39 seconds, 2½ l.

Published in Rowing

#ROWING: The Irish challenge in the Double Sculls at Henley Royal Regatta was ended this morning as the British national crew of John Collins and Jonathan Walton beat Dave Neale and Eimantas Grigalius of Three Castles. The British, who have been finalists at the European Championships and the World Cup in Aiguebelette, were half a length up by the top of the Island and three lengths up at 500 metres. The winner was never in doubt from that point.  

Henley Royal Regatta, Day Three (Selected Results; Irish interest)

Double Sculls Challenge Cup (Men, Open): Leander (J Collins, J Walton) bt Three Castles (D Neale, E Grigalius) 2l, 7 mins 48 secs.

Published in Rowing

# ROWING: Sanita Puspure was beaten in the semi-final of the Princess Royal at Henley Royal Regatta this evening. The woman who will represent Ireland in rowing at London 2012 fought out a close duel with Isolda Penney of Canada, who was behind until the middle of the race. The Canadian, in the preferable Berks station, pushed into the lead and held off Puspure to eventually win by two lengths.

Penney’s victory was a surprise, but the 37-year-old, who holds joint US/Canadian citizenship, is a serious competitor. She was third in the US trial held before the Olympic Qualifier in Lucerne this year. The trial was won by Genevra Stone, who went on to finish third at the Qualifier, one place ahead of Puspure.

Kaisa Pajusalu of Estonia, who lost out in that Olympic Qualifier (she finished sixth in the Final)  won  the other semi-final of the Princess Royal after a good race with Laura Schiavone of Italy.

Henley Royal Regatta, Day Four (Irish interest):

Queen Mother (Quadruple Sculls, Open): Victoria City Rowing Club, Canada bt UCC/London RC (N Kenny, A English, H Pelly, M O’Donovan) 1¾ l, 7:24

Princess Royal (Single Sculls, Women, Open): I Penney (Canada) bt S Puspure (Ireland) 2l, 9:57

K Pajusalu (Estonia) bt L Schiavone (Italy) easily 10:03

Published in Rowing

# ROWING: Queen’s bowed out of Henley Royal Regatta yesterday after a very good race in the Visitors’ Cup with Durham University. The Queen’s four started well, but the bigger Durham crew headed them and won by three lengths.

Henley Royal Regatta, Day Three (Irish interest)

Princess Royal (Single Sculls, Women, Open): S Puspure (Old Collegians) bt P Whittaker (Nottingham) easily, 10.31

The Double Sculls (Open): SH Whelpley and WS Cowles bt A Boreman (Belfast Boat Club) and C Beck (RBAI) easily, 8:45.

Visitors’ Cup (Fours, Intermediate): Durham University bt Queen’s University 3l, 8:03.

Published in Rowing

# ROWING: John Keohane slugged it out with the heavier Luke Moon in the Diamond Sculls at Henley Royal Regatta today but finished second, a length off the Tideway Scullers’ man. Keohane was slower off the start, but he drew level in the middle stages and even edged in front. Moon eventually took and held the lead, but he slowed in front of the enclosures and Keohane tightened the final margin.

Henley Royal Regatta, Day Two (Irish interest)

Diamond Sculls (Single Sculls, Open): R Lopez (El Salvador) bt C Williamson (Queen’s University) easily, 9:00; L Moon (Tideway Scullers’ School) bt J Keohane (Lee Valley) 1l, 9:30

Visitors’ Cup (Fours, Intermediate): Queen’s University bt Nottingham University B easily, 8:14; Durham University bt Oxford University and Isis BC 4 ¼ l, 7:55

Wyfold Cup (Fours, Club): Rob Roy bt Cork BC 4¼ l, 7:53

Published in Rowing

# ROWING: The Cork Boat Club four of John Paul Collins, Stephen Carroll, Colm Dowling and Shane Mac Eoin put in a good challenge in the second round of the Wyfold Cup but could not overcome Rob Roy from Cambridge at Henley Royal Regatta. The English crew led by half a length at the quarter mile and held off Cork’s pushes to extend their lead.

Colin Williamson of Queen’s University lost to El Salvador’s Roberto Lopez in the Diamond Sculls. Lopez powered away from Williamson early on and did not yield up the advantage.

Henley Royal Regatta, Day Two (Irish interest)

Wyfold Cup (Fours, Club): Rob Roy bt Cork BC 4¼ l, 7:53

Diamond Sculls (Single Sculls, Open): R Lopez (El Salvador) bt C Williamson (Queen’s University) easily, 9:00

Published in Rowing

# ROWING: Ireland’s only eight competing at Henley Royal Regatta bowed out of the Temple Cup today. Trinity led the University of Michigan at the Barrier and Fawley (roughly halfway). A push by Trinity was ineffective, but the Americans staged their own which took them into the lead. They took control and won by one and a quarter lengths.

Henley Royal Regatta, Day One (Irish interest)

Temple Cup (Eights, Student): University of Michigan (USA) bt Trinity 1 ¼ l, 7:12

Prince Albert Cup (Coxed Fours, Student): Imperial College bt Queen’s University 1¾ l, 8:07

Wyfold Cup (Fours, Club): Cork BC bt Cardiff City 1l, 7:52; Rob Roy bt Henley B 4l, 7:56

Published in Rowing

# ROWING: Cork Boat Club gave Ireland its first race win at Henley 2012, when they came through their first round test against Cardiff City in the Wyfold for club fours. The Cork crew eked out a lead early on, but Cardiff mounted a challenge right to the end when the pressure told and their steering faltered. Cork won by a length.

Imperial Boat Club, who were seeded, ousted Queen’s University in the Prince Albert for student coxed fours.

Henley Royal Regatta, Day One (Irish interest)

Temple Cup (Eights, Student): Brown University (USA) bt Dartmouth 2½ l, 6:57;

Prince Albert Cup (Coxed Fours, Student): Imperial College bt Queen’s University 1¾ l, 8:07

Wyfold Cup (Fours, Club): Cork BC bt Cardiff City 1l, 7:52; Rob Roy bt Henley B 4l, 7:56

Published in Rowing

# ROWING: In the qualifying races for Henley Royal Regatta this evening, UCD's senior women's eight was well outside the mark to qualify for the Remenham Cup, but Colin Williamson of Queen's University did enough to make his way into the draw for the Diamond Sculls for single sculls.

Published in Rowing

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020