Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Snipe

Sailing enthusiasts around Lough Erne in County Fermanagh have a proud record of restoring old boats as well as building new craft in traditional designs.

Some years ago, the late Fred Ternan set up a small organisation called Lough Erne Heritage, whose aims were to promote and preserve the story of boat use on Lough Erne. One of the first dinghies that Fred restored was a Snipe dinghy called Ranger, which he found with another called Teal in the old boat shed at Crom Castle on Upper Lough Erne in County Fermanagh. Johnny Madden of Clones owned both in Co Monaghan, whose family were instrumental in Snipe sailing on Lough Erne in the 1950s and 1960s.

Another one of the original Snipes, Valkyria, had been stored in Enniskillen, the county town of Fermanagh; evidence that boats from Belfast Lough ended up in Lough Erne, as she had been owned by an E Cowan of Holywood and Ranger was from Carrickfergus. Snipes were present on Belfast Lough, Strangford Lough, and bizarrely on tiny Lough Eskragh near Dungannon.

Snipe dinghies at Crom Photo: courtesy Johnny MaddenSnipe dinghies at Crom Photo: courtesy Johnny Madden

Johnny Lucas-Clements had owned Valkyria, and now his daughter, Sarah Royle is offering it at no cost for restoration. It has been undercover, and the sails are stored indoors. She has told me that at the relaunch of Ranger in 2021, “Fred said he would also like to restore my father’s Snipe but sadly passed away before he could do that.

Ballyholme Yacht Club Regatta 1949 with Snipe Valkyria listed as an entry on the regatta programmeBallyholme Yacht Club Regatta 1949 with Snipe Valkyria listed as an entry on the regatta programme

Currently, the Snipe is still in a shed doing nothing, and ideally, I would like to find a new owner who would be prepared to restore it and sail it again.” She continued, “I just want Valkyria to go to a good home and for someone to enjoy sailing it. I have spoken to Johnny Madden, and he has told me the Snipe was built by George Jointer in the 1930s and in 1954, the Maddens, Lucas Clements and some others acquired them and sailed them on Lough Erne”.

Anyone interested can contact Sarah by email at blakeleyfarm@gmail,com

Published in Historic Boats
Tagged under

For a very long time, the Snipe class Dinghy Ranger languished in the Boathouse at Crom Castle on Upper Lough Erne, but after lengthy restoration by Fred and George Ternan, Ranger has been afloat twice recently and last weekend (18th September) at the Lough Erne Heritage Festival, she created a stir on display in the grounds of Enniskillen Castle.

The festival celebrated various heritage skills, local talents, and heritage projects, including Willow Weaving, Rush craft and Rope making, Thatching and Blacksmithing, and there were Rowing tours on the Erne and Historical tours of the Castle.

Fred Ternan was there to show off Ranger and discuss all things maritime heritage, and he gave a dedicated talk on the Snipe's restoration.

From left to right: Joy and Colin Honeyford from Bangor with Brian Osborne and Fred Ternan Photo: Andrew PatonFrom left to right: Joy and Colin Honeyford from Bangor with Brian Osborne and Fred Ternan Photo: Andrew Paton

There were about 1000 people who visited the festival, and many took photos of Ranger and its display sparked much conversation and tales of sailing on Lough Erne in the past. Brian Osborne from Lough Erne Heritage (It aims to encourage local heritage research about Lough Erne, its traditional boats and the people who built and used them), says that "The future for classic sailing certainly appears to be bright. We had our fair share of interested parties of all ages. Our restored Snipe provided a fitting backdrop for dozens of people eager for a memorable photograph. If the level of interest shown is anything to go by, then classic dinghy sailing on Lough Erne has a positive future".

Ranger displaying its original club, LEYC (Lough Erne Yacht Club) the original club based at CromRanger displaying its original club, LEYC (Lough Erne Yacht Club) the original club based at Crom

Among those visiting were Joy and Colin Honeyford from Bangor, who has a boat on Lough Erne. They had a beautiful day for a visit; " Of special interest to us was our chat with Fred Ternan, who explained in great detail how he and his brother George carefully restored a 1941 Snipe dinghy which was on display at their stand. They've done a superb job! And it was also great to see that so many traditional skills such as basket weaving, lace making, saddlery and many others are still practised".

Tagged under

In late August, the Snipe dinghy Ranger, restored by Fred and George Ternan after sixty years lying abandoned on the Crom Estate, County Fermanagh, had her second outing on Upper Lough Erne at Crom.

Ranger was one of two Snipes found by Fred in the boathouse at Crom Castle and was restored over the last year. The other was Teal, and it is known that a third, Valkyria, is stored near Enniskillen.

Heading off in very calm conditions from the Visitor Centre slipway at Crom were Rob and Alice Armstrong from Bangor, later to be joined by Sarah Royle from County Cavan. Sarah confessed she hadn't sailed since she was ten; " Valkyria was owned by my father, Johnny Lucas -Clements, and when I was a young child, I used to sail with him at Crom on Sunday afternoons. That was back in the late 1960s and early 1970s, and we always sailed from the boathouse. I enjoyed sailing at Crom back then. I was very grateful to be asked by Johnny Madden to attend the relaunch of Ranger in early August and then by Fred to sail in Ranger last Sunday. It brought back many happy memories for me."

Ranger approaching Trial Bay on Upper Lough ErneRanger approaching Trial Bay on Upper Lough Erne

Both Ranger and Valkyria came from Belfast Lough, where they regularly sailed for years. They formed part of a fleet of Snipes acquired by Major Madden of Clones, who was instrumental in establishing the class in Lough Erne. He introduced Teal about 1953, and his son Johnny Madden has much detail about the Snipe class at his fingertips.

The whole story of Snipe sailing in Northern Ireland can be found here

Tagged under

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020