Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: World Under23 Championships

#Rowing: Ireland’s Fintan and Jake McCarthy took second in the B Final, eighth overall, at the World Rowing Under-23 Championships in Plovdiv, Bulgaria. In temperatures already in the twenties, Chile and Japan were fastest over the first half of the race, with Ireland back in fourth. Through the second 1,000 metres, Chile took over the clear lead and Ireland moved up into second. They challenged the Chileans but could not catch them.  

 The race was a five-boat contest, as Britain’s Matt Curtis and Gavin Horsburgh pulled out for medical reasons.

World Rowing Under-23 Championships (Irish interest)

Men

Lightweight Double Sculls – B Final (Places 7 to 12): 1 Chile 6:27.09, 2 Ireland (F McCarthy, J McCarthy) 6:28.58, 3 Japan 6:31.52.

Published in Rowing

#Rowing: Ireland took a second medal at the World Rowing Under-23 Championships in Bulgaria today. The lightweight quadruple of Niall Beggan, Stephen O’Connor, Andrew Goff and Shane O’Connell took bronze behind Switzerland and Austria.

 Austria and Switzerland swapped the lead through the race, but the Swiss edged ahead in the final quarter. Ireland had a fine middle 1,000 metres and won their battle with Britain to gain a place in the medals. They were third as the crews drove for the line, but came within .28 of a second of catching the Austrians, who took silver.

 Ireland’s David O’Malley and Shane Mulvaney took a bronze medal in the final of the lightweight pair.

World Under-23 Championships, Plovdiv, Bulgaria (Irish interest)

Men

Lightweight Pair – A Final: 1 Italy 6:33.05, 2 Turkey 6:36.70, 3 Ireland (S Mulvaney, D O’Malley) 6:37.63; 4 Britain 6:45.33, 5 France 6:46.74, 6 Denmark 6:53.36.

Lightweight Quadruple Sculls – A Final: 1 Switzerland 5:50.62, 2 Austria 5:52.09, 3 Ireland (N Beggan, S O’Connor, A Goff, S O’Connell) 5:52.37; 4 Britain 5:54.55, 5 Italy 5:56.46, 6 France 5:56.82.

Lightweight Double Sculls – Semi-Finals (First Three to A Final; rest to B Final)

Semi-Final One: 1 Denmark  6:18.69, 2 Italy 6:21.85, 3 Germany 6:23.22.

Semi-Final Two: 1 Canada 6:19.88, 2 Spain 6:20.66, 3 South Africa 6:21.69; 4 Ireland (F McCarthy, J McCarthy) 6:22.56, 5 Britain 6:23.77, 6 Poland 6:42.15.

Published in Rowing

#Rowing: Ireland’s David O’Malley and Shane Mulvaney took a bronze medal at the World Rowing Under-23 Championships in Plovdiv, Bulgaria today. Italy won a tense race. Turkey led early on, but Italy and Ireland came through fast. With 500 metres to go, Italy had taken the lead with Ireland and Turkey just behind. In the final quarter, Italy secured first with Turkey just rebuffing Ireland to take the silver. Mulvaney and O’Malley had taken bronze a year after just missing out on a medal.

OMalley Mulvaney Medallists U23 WorldsDavid O'Malley and Shane Mulvaney with Bronze Medal at World Under-23

World Under-23 Championships, Plovdiv, Bulgaria (Irish interest)

Men

Lightweight Pair – A Final: 1 Italy 6:33.05, 2 Turkey 6:36.70, 3 Ireland (S Mulvaney, D O’Malley) 6:37.63; 4 Britain 6:45.33, 5 France 6:46.74, 6 Denmark 6:53.36.

Lightweight Double Sculls – Semi-Finals (First Three to A Final; rest to B Final)

Semi-Final One: 1 Denmark  6:18.69, 2 Italy 6:21.85, 3 Germany 6:23.22.

Semi-Final Two: 1 Canada 6:19.88, 2 Spain 6:20.66, 3 South Africa 6:21.69; 4 Ireland (F McCarthy, J McCarthy) 6:22.56, 5 Britain 6:23.77, 6 Poland 6:42.15.

Published in Rowing

#ROWING: Paul O’Donovan produced an excellent finish to take second in his semi-final of the lightweight single scculls at the World Under-23 Rowing Championships in Varese in Italy today. Enes Kusku of Turkey set a hot pace and won, while behind him O’Donovan had to see off a number of challengers to secure the top-three spot. He was  third at 1500 metres, but passed Francesco Genoraro of Italy coming up to the line and almost caught Kusku.

World Under-23 Rowing Championships, Varese, Italy (Selected results; Irish interest)

Men

Four – B Final (Places 7 to 12): 1 Croatia 6:09.17, 2 Belarus 6:10.60

3 China 6:11.76, 4 Serbia 6:14.24, 5 France 6:15.88, 6 Ireland (R Bennett, K Neville, F McQuillan-Tolan, R O’Callaghan) 6:20.33.

Lightweight Single Sculls – Semi-Final One (First Three to A Final; rest to B Final): 1 Turkey (E Kusku) 7:11.73, 2 Ireland (P O’Donovan) 7:11.91, 3 Italy (F Pegoraro) 7:12.30; 4 Netherlands 7:15.25, 5 Germany 7:17.22, 6 Greece 7:29.74.

Published in Rowing

#ROWING: Ireland’s men’s four reached tomorrow’s semi-finals of the World Under-23 Rowing Championships by finishing third in their repechage today. Belarus and Serbia finished first and second, with Ireland showing their determination to stay in the Championships by taking the final qualification spot.  Russia, who are a bigger crew than the Irish, lost out by finishing fourth.

World Under-23 Rowing Championships, Varese, Italy, Day Two (Irish interest; selected results)

Men,

Four – Repechage (First Three to A/B Semi-Finals): 1 Belarus 6:18.7, 2 Serbia 6:24.33, 3 Ireland (R Bennett, K Neville, F McQuillan-Tolan, R O’Callaghan) 6:28.54, 4 Russia 6:31.41.

Lightweight Double Sculls – Heat Three (First Two Directly to A/B Semi-Finals; Rest to Repechage): 1 France (P Houin, D Debourdeau) 6:34.72, 2 Italy (F Gherzi, N Forcellini) 6:37.86;

3 Ireland (S O’Driscoll, G O’Donovan) 6:38.34, 4 Serbia 6:54.08, 5 Poland 7:04.23,

Women,

Lightweight Single Sculls – Heat Three (First Two Directly to A/B Semi-Finals; Rest to Repechage): 1 Cyprus 8:04.62, 2 France 8:06.67; 3 Britain 8:13.89, 4 Ireland (D Walsh) 8:22.48, 5 Russia 8:26.00.

Published in Rowing

#WorldUnder-23Rowing: The Ireland heavyweight four finished third in their B Final, ninth overall, at the World Under-23 Championships in Linz in Austria this morning. Croatia won the race and Lithuania, after duelling with Ireland in the middle stages, secured second. The Ireland crew of Richie Bennett, Matthew Wray, John Mithcell and Rob O’Callaghan held off Norway for third. Britain withdrew as they had to call on one of the members of the crew for their quadruple scull.

 Adam Boreham, the reserve for the men's heavyweight crews,  finished sixth in the D Final of the men's single sculls, 24th overall.

World Under-23 Rowing Championships, Linz, Austria, Day Four (Irish interest, selected results)

Men

Four – B Final (places 7 to 11): 1 Croatia 6:14.55, 2 Lithuania 6:17.00, 3 Ireland (R Bennett, M Wray, J Mitchell, R O’Callaghan) 6: 19.24, 4 Norway 6:19.29. Britain did not start.

Pair - (First Three to A Final; rest to B Final) – Semi-Final One: 1 South Africa (D Hunt, V Breet) 6:46.15, 2 Greece (K Christomanos, A Dafnis) 6:49.16, 3 Serbia (M Vasic, R Deric) 6:49.47; 4 Hungary 6:50.31, 5 Ireland (S O’Connor, F McQuillan-Tolan) 6:59.77, 6 Lithuania 7:20.32.

Lightweight Double Sculls – (First Three to A Final; rest to B Final) – Semi-Final One: 1 Germany (M Moos, J Osborne) 6:36.55, 2 Italy (L Barbaro, S Molteni) 6:37.75, 3 Spain (J de Haz, J Zabala Artetxe) 6:37.88; 4 Poland 6:38.49, 5 Ireland (S O’Driscoll, G O’Donovan) 6:46.30, 6 Norway 6:48.13.

Lightweight Single Sculls – (First Three to A Final; rest to B Final) – Semi-Final One: 1 United States (A Campbell) 7:11.15, 2 Ireland (P O’Donovan) 7:12.58, 3 Britain (Z Lee-Green) 7:14.26; 4 Australia 7:22.67, 5 Italy 7:24.34, 6 Germany 7:28.69.

 Single Sculls - D Final (places 19 to 24): 6 Ireland (A Boreham) 7:36.40.

Women

Lightweight Single Sculls – (First Three to A Final; rest to B Final) – Semi-Finals Two: 1 Greece (A Nikolaidou) 7:54.92, 2 Austria (A Berger) 8:00.22, 3 Ireland (D Walsh) 8:00.28; 4 France 8:04.30, 5 Germany 8:11.25, 6 Cyprus 8:11.63.

 

Published in Rowing

#WorldUnder-23Rowing: Ireland qualified two more boats for the A Finals of the World Under-23 Rowing Championships at Linz in Austria this morning, nailing top-three places in the semi-finals to join the women’s four in the hunt for medals.

Denise Walsh started the day well for the team in green by qualifying in the lightweight single sculls. Aikaterini Nikolaidou of Greece led the semi-final all the way down the course and won.   Walsh and Anna Berger of Austria got away from Julie Marechal of France to secure second and third, with the Austrian pipping the Skibbereen woman for second.

The favourite for gold, Andrew Campbell Jr of the United States, set the pace in the second semi-final of the lightweight single sculls. Paul O’Donovan again had a slow start and by half way still trailed the American by more than a length. O’Donovan, characteristically, closed on his rival in the second half, but Campbell held him off. Zak Lee-Green of Britain took the third qualifying place.

In the men’s pair, Fionnán McQuillan-Tolan and Seán O’Connor finished fifth in a race in which South Africa, Greece and Serbia took a grip of the qualifying places quite early.

Ireland’s lightweight double scull of Shane O’Driscoll and Gary O’Donovan fought their way from sixth to fourth in the middle stages of their semi-final, but could not break into the top three. Poland pushed them into fifth in the second half of the race.

World Under-23 Rowing Championships, Linz, Austria, Day Four (Irish interest, selected results)

Men

Pair - (First Three to A Final; rest to B Final) – Semi-Final One: 1 South Africa (D Hunt, V Breet) 6:46.15, 2 Greece (K Christomanos, A Dafnis) 6:49.16, 3 Serbia (M Vasic, R Deric) 6:49.47; 4 Hungary 6:50.31, 5 Ireland (S O’Connor, F McQuillan-Tolan) 6:59.77, 6 Lithuania 7:20.32.

Lightweight Double Sculls – (First Three to A Final; rest to B Final) – Semi-Final One: 1 Germany (M Moos, J Osborne) 6:36.55, 2 Italy (L Barbaro, S Molteni) 6:37.75, 3 Spain (J de Haz, J Zabala Artetxe) 6:37.88; 4 Poland 6:38.49, 5 Ireland (S O’Driscoll, G O’Donovan) 6:46.30, 6 Norway 6:48.13.

Lightweight Single Sculls – (First Three to A Final; rest to B Final) – Semi-Final One: 1 United States (A Campbell) 7:11.15, 2 Ireland (P O’Donovan) 7:12.58, 3 Britain (Z Lee-Green) 7:14.26; 4 Australia 7:22.67, 5 Italy 7:24.34, 6 Germany 7:28.69.

Women

Lightweight Single Sculls – (First Three to A Final; rest to B Final) – Semi-Finals Two: 1 Greece (A Nikolaidou) 7:54.92, 2 Austria (A Berger) 8:00.22, 3 Ireland (D Walsh) 8:00.28; 4 France 8:04.30, 5 Germany 8:11.25, 6 Cyprus 8:11.63.

Published in Rowing

#WorldUnder-23Rowing: Shane O’Driscoll and Gary O’Donovan brought Ireland a second semi-final place this morning at the World Under-23 Championships at Linz in Austria. The repechage of the lightweight double sculls turned into a three-way battle for two places between Ireland, Britain and Chile. The Irish got through in second, securing qualification. Britain won the race by a single second.

Paul O'Donovan, Gary's younger brother, had secured his semi-final place by winning his quarter-final of  the lightweight single sculls. 

Adam Boreham, who travelled as a reserve for the Ireland pair and four, finished sixth in quarter-final of the men’s single sculls and and sixth in the C/D semi-finals. He will compete in the D Final for places 19 to 24.

World Under-23 Rowing Championships, Day Two (Irish interest, selected results)

Men

Single Sculls – (First Three to A/B Semi-Finals; rest to C/D Semi-Finals) – Quarter-Final Four: 1 Germany (H Trzybinski) 7:13.77, 2 Belgium (H Obreno) 7:16.00, 3 Norway (J Boehn) 7:19.41; 4 Australia 7:20.20, 5 United States 7:27.76, 6 Ireland (A Boreham) 7:42.11. C/D Semi-Finals: 6 Boreham 7:36.30.

Lightweight Double Sculls – Repechage Two (First Two to A/B Semi-Finals; rest to C/D Semi-Finals): 1 (S Sykes, J Copus) 6:49.89, 2 Ireland (S O’Driscoll, G O’Donovan) 6:50.89; 3 Greece 6:52.79, 4 Chile 6:59.23, 5 Slovenia 7:02.67.

Lightweight Single Sculls – (First Three to A/B Semi-Finals; rest to C/D Semi-Finals) – Quarter-Final Three: 1 Ireland (P O’Donovan) 7:11.32, 2 Turkey (E Kusku) 7:14.06, 3 Hungary (B Tamas) 7:14.54; 4 Chile 7:17.11, 5 Mexico 7:35.88, 6 Estonia 7:46.20.

Published in Rowing

#WorldUnder-23Rowing: Paul O’Donovan won his quarter-final of the lightweight single sculls at the World Under-23 Championships in Linz in Austria this morning after an interesting race. Enes Kusku of Turkey led – and led well – for much of the race, with Bence Tamas of Hungary and O’Donovan filling the next two qualification places. But O’Donovan is a good judge of a race and has an effective sprint finish. He sped past Kusku to win by 2.28 seconds.

World Under-23 Rowing Championships, Day Two (Irish interest, selected results)

Men

Lightweight Single Sculls – (First Three to A/B Semi-Finals; rest to C/D Semi-Finals) – Quarter-Final Three: 1 Ireland (P O’Donovan) 7:11.32, 2 Turkey (E Kusku) 7:14.06, 3 Hungary (B Tamas) 7:14.54; 4 Chile 7:17.11, 5 Mexico 7:35.88, 6 Estonia 7:46.20.

Published in Rowing

#WorldUnder-23Rowing: The Ireland women’s four secured the first A Final place for Ireland at the World Under-23 Rowing Regatta at Linz in Austria today. The crew of Emily Tormey, Ailish Sheehan, Aifric Keogh and Lisa Dilleen needed to finish in the top two of their repechage to get through, and by the closing stages Ireland and Poland were on their way to those places. However, Ireland beat Poland into second to improve their lane draw in the final.

 The Ireland men's four of Richie Bennett, Matthew Wray, Jonathan Mitchell and Rob O'Callaghan will row in a B Final. They finished fifth in their repechage.

World Under-23 Rowing Championships, Day Two (Irish interest, selected results)

Men

Four – Repechage One (First Two to A Final; rest to B Final): 1 Germany 6:01.85, 2 Italy 6:03.35; 3 Croatia 6:05.59, 4 Norway 6:11.03, 5 Ireland (R Bennett, M Wray, J Mitchell, R O’Callaghan) 6:16.97.

Pair – (First Two Directly to A/B Semi-Finals; rest to Repechage) – Heat Two: 1 Australia (A Moore, A Hill) 6:37.37, 2 Ireland (S O’Connor, F McQuillan-Tolan) 6:49.15; 3 Russia 6:54.42, 4 Venezuela 7:05.10, 5 United States 7:09.48, 6 Estonia 7:15.64.

Lightweight Double Sculls – (First Two Directly to A/B Semi-Finals; rest to Repechage) – Heat Three: 1 France (D Piqueras, D Houin) 6:26.65, 2 Italy (L Barbaro, S Molteni) 6:31.96; 3 Ireland (S O’Driscoll, G O’Donovan) 6:37.40, 4 Russia 6:42.81, 5 Lithuania 7:05.01.

Women

Four – Repechage One (First Two to A Final; rest to B Final): 1 Ireland (E Tormey, A Sheehan, A Keogh, L Dilleen) 6:48.03, 2 Poland (A Budzynska, J Dittmann, M Cylwik, O Michalkiewicz) 6:48.59; 3 United States 6:54.09, 4 Italy 6:55.92, 5 France 6:58.66.

Lightweight Single Sculls – (First Two Directly to A/B Semi-Finals; rest to Repechage) – Heat One: 1 Belgium (E Peleman) 7:46.06, 2 Ireland (D Walsh) 7:50.87; 3 Croatia 7:52.54, 4 Germany 8:00.47, 5 Israel 8:04.22, 6 Argentina 8:06.23.

Published in Rowing
Page 2 of 3

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020