Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Arklow's Latest Launch

#ArklowsLastestLaunch – Arklow Breeze had the honour of been launched as the newest and final newbuild of six cargoships from a Dutch yard last Friday, writes Jehan Ashmore.

The ceremony for Yard No. (Nb) 414 saw a successfull sideways launch at the Westerbroek yard of Ferus Smit. The same Dutch yard having completed all of the previous bulk oriented general cargoships of 8,660dwt for Arklow Shipping. She joins the company's Dutch division based in Rotterdam, Arklow Shipping Netherland N.V.

A 119m long hull form without a bulb-less bow design has given the series 'green' credentials. This is to improve operating efficiency by reducing wave resistance in varying sea-state conditions without compromising on cargo-loads.

The bulb-less concept, instead features a straight-stemmed bow to allow a slender hull entry to slice into the waves. While at the same time taking into account various loading drafts. Total performance of this bow design will also be better than that of a bulb optimised for one single-draft and flat water only conditions.

Almost a year ago, Arklow Bay was also given a spectacular launch, see VIDEO. As for Arklow Breeze she is due to enter service next month.

She follows Arklow Brave which called to Dublin Port this month and whose agents are the Burke Shipping Group which invested in new port infrastructure late last year.

The new cargoship had loaded scrap metal elsewhere in the port alongside the Hammond Lane Metal Company. She departed laden with the cargo bound for Leixoes in Portugal.

The sisters will be mainly employed in the shipment of wheat, corn and other bulk commodities in European waters.

Published in Arklow Shipping

Dun Laoghaire Baths Renovation

Afloat has been reporting on the new plans for the publically owned Dun Laoghaire Baths site located at the back of the East Pier since 2011 when plans for its development first went on display by Dun Laoghaire Rathdown County Council. 

Foreshore consent was applied for in 2013.

Last used 30 years ago as the 'Rainbow Rapids' before falling into dereliction – the new site does not include a public pool.

The refurbished Dun Laoghaire Baths include the existing Baths Pavilion for use as artist workspaces, a gallery café and for the provision of public toilet facilities. 

Work finally got underway at Dún Laoghaire on the €9 million redevelopments of the old Dún Laoghaire Baths site in June 2018 under a contract with SIAC-Mantovani.

The works have removed dilapidated structures to the rear of the Pavilion to permit the creation of a new route and landscaping that will connect the walkway at Newtownsmith to both the East Pier and the Peoples Park. 

Original saltwater pools have been filled in and new enhanced facilities for swimming and greater access to the water’s edge by means of a short jetty have also been provided.

The works included the delivery of rock armour to protect the new buildings from storm damage especially during easterly gales. 

It hasn't all been plain sailing during the construction phase with plastic fibres used in construction washing into the sea in November 2018

Work continues on the project in Spring 2020 with the new pier structure clearly visible from the shoreline.

A plinth at the end of the pier will be used to mount a statue of Roger Casement, a former Sandycove resident and Irish nationalist.