Menu

Ireland's sailing, boating & maritime magazine

annalise page topper

Displaying items by tag: Dublin Array

The Department of Transport has been advised by Dublin Array that they will be conducting geophysical, geotechnical and environmental surveys for the Dublin Array offshore wind farm project.

Site investigation operations for the wind farm and the Expert Corridor Route (ECR) between the coast of Dublin and Wicklow will take place between Friday 19 April and the end of July, subject to weather and operational constraints.

The geophysical survey will be carried out by the vessel Fugro Helmert (callsign C6FT8). During these operations, the vessel will be towing equipment at a depth of up to five metres below the surface and extending some 300 metres astern.

The geotechnical survey will be carried out by the vessel M/V Flat Holm (callsign GHLZ) at fixed stations. The environmental survey will be carried out by the vessel Ros Áine (callsign EIZG5) in daytime hours only.

All vessels will be mobilised from Dun Laoghaire and will be restricted in their ability to manoeuvre, therefore all other mariners are advised to provide a wide berth and navigate with caution in the relevant area.

Coordinates and a map of the survey area, as well as contact details, can be found in Marine Notice No 18 of 2024, attached below.

Published in Power From the Sea

RWE Renewables Ireland has appointed Vanessa O’Connell as its new Development Project Director for the Dublin Array offshore wind farm.

Dublin Array is a proposed 824MW offshore wind farm, which will be located about 10 kilometres from the coast of counties Dublin and Wicklow.

Vanessa replaces Peter Lefroy, who has been leading the project since 2018, while also being the Offshore Development Head for Ireland. Peter will continue in his role as Offshore Development Head of RWE Ireland & UK West.

Vanessa brings more than 12 years of experience in leadership in the offshore wind sector to RWE. She has worked across all stages of offshore wind projects, encompassing development, construction, and operations, with involvement in nine offshore wind projects.

Vanessa spent over ten years at Ørsted, working on projects such as Hornsea 1 (1.2GW), Burbo Bank Extension (258MW), Walney Extension (659MW), and Barrow (90MW). On Hornsea 1, Vanessa held leadership positions in the commercial function, served on the construction leadership team, and assumed overall accountability for the asset during its transition to the operational phase.

Returning to Ireland over two years ago, Vanessa assumed the role as Head of Inis Offshore Wind. This independent offshore wind developer, backed by Temporis and the Ireland Strategic Investment Fund, focuses on early stage development in Ireland.

Vanessa holds an MSc in Environmental Technology from Imperial College London and a BA in Economics from Trinity College Dublin. She lives in Dun Laoghaire with her husband and two daughters.

Commenting on the appointment, RWE Director of Offshore Development UK & Ireland Danielle Lane said:

“I’m delighted that Vanessa has chosen to join RWE and Dublin Array. Her skills and experience in working in offshore wind will make a great contribution to the project at an important time. Dublin Array is a flagship project in the Irish offshore wind market and Vanessa is joining a strong, established team that will thrive under her leadership.”

Dublin Array

Dublin Array is a proposed offshore wind farm, which will be located on the Kish and Bray Banks, approximately 10km from the coastline of counties Dublin and Wicklow. It is being developed by RWE, one of the world’s leading developers of renewable energy, and Irish renewable energy firm Saorgus Energy. RWE is leading the development on behalf of the partnership.

Once operational, the project will deliver up to 824MW of clean, renewable electricity and will consist of up to 50 wind turbines. This is enough energy to supply around 770,000 homes and reduce Ireland’s annual carbon emissions by over 1.4m tonnes per year. The final decision on the number of turbines will be informed by ongoing surveys and detailed design work.

The Dublin Array project will also bring significant economic benefits during its construction and operation, with over 1,000 construction phase jobs and 80 direct and 160 indirect full-time jobs expected during the 30-year operational phase. Dublin Array’s operations base is expected to be located within Dún Laoghaire, resulting in an estimated €540 million in local expenditure across the Greater Dublin Area.

Dublin Array was awarded its Maritime Area Consent (MAC) in December 2022. A MAC is required for any proposed Irish offshore wind farm development to be able to seek planning permission. Subject to planning permission, the project could be operational by 2028.

Published in Power From the Sea
Tagged under

Kish Offshore Wind Ltd and Bray Offshore Wind Ltd will be conducting geotechnical investigations on the Dublin Array project site and associated export cable corridor off the coast of counties Dublin and Wicklow from later this month.

The geotechnical investigations will include 27 vibrocores which will be sampled at locations within the offshore wind farm site. Project works will commence on Saturday 29 April and continue through to late May, subject to weather and operational constraints.

Investigations will be conducted within the Kish lease area, Bray lease area and the expert cable corridor, all of which are off the coast of counties Dublin and Wicklow.

Operations will be conducted by the multipurpose vessel Voe Vanguard (callsign MBEN9). The vessel will be positioned at each of the investigation points for approximately two hours, which may extend in the event of inclement weather.

The vessel is supplied with a VHF multi-channel radio and mobile phone. It will be operating 24 hours a day during the survey works and will display relevant lights and shapes as required under COLREGS.

All other vessels operating within the planned area of survey are requested to keep their distance and give a wide berth wherever possible.

Contact details, a map and coordinates of the survey area can be found in Marine Notice No 24 of 2023, attached below.

Published in Power From the Sea

The Department of Transport has been advised by Kish Offshore Wind Ltd and Bray Offshore Wind Ltd that geotechnical investigations will be conducted on the Dublin Array offshore wind farm project site off the coast of counties Dublin and Wicklow.

The project works will commence next Saturday 1 April and continue through to late May 2023, subject to weather and operational constraints.

The geotechnical investigation will include approximately seven boreholes which will be drilled at locations within the project work site.

Operations will be conducted by the Dutch Pearl (callsign PBZP), a support vessel/tug, and the Excalibur (callsign YJKQ5), a jack-up barge.

The Excalibur will be positioned at each of the investigation points for several days which may extend in the event of inclement weather. The Dutch Pearl will be assisting the Excalibur in its daily operations and towing the barge between investigation points. The standby tug will be at anchor on the project site and will be conducting transits between the site and Dublin Port.

Both vessels will display the relevant light and shapes as required under COLREGS. Both vessels will keep continuous watch on VHF Channels 16 and 72. During operations, the vessels will be restricted in their ability to manoeuvre. All other vessels are requested to leave a wide berth during the operations.

Contact details, relevant coordinates and a map of the work area ca be found in Marine Notice No 16 of 2023, attached below.

Published in Power From the Sea

Marine Notices No 37 of 2021 and No 44 of 2021 advised of the deployment of two wave buoys and one floating LiDAR buoy at the Dublin Array offshore wind farm on the Bray and Kish Banks.

The two wave buoys were recovered from site in June 2022. Now the Department of Transport has now been advised by Partrac Ltd that the floating LiDAR buoy on Bray Bank is scheduled to be recovered in the period between Thursday 5 and Thursday 19 January 2023, subject to weather and operational constraints.

The floating LiDAR buoy at Latitude 53° 10.645’ N, Longitude 005° 55.785' W has a square footprint with an area of 4 sqm and height of around 4m above the water line. It is yellow in colour and has a St Andrew cross on top.

It also contains a yellow light which emits five flashes every 20 seconds and is visible for up to three nautical miles.

The vessel CT Barnston (callsign MUZU5) will recover the buoy and tow it back to Wicklow Harbour for demobilisation. Dublin Port will be contacted in advance regarding the operations with estimated timings. The buoy will be towed some 30m astern of the CT Branston at a maximum speed of 3.5 knots.

During recovery of the floating LiDAR buoy on Bray Bank, the vessel will be restricted in its ability to manoeuvre. All other vessels are requested to leave a wide berth during the recovery and towing operations. Radio transmissions will be conducted with VTS and other seafarers to notify them of the buoy operations.

Contact details can be found in Marine Notice No 85 of 2022, attached below.

Published in Power From the Sea

Marine Notice 37 of 2021 advised of the deployment of one floating lidar buoy and two wave buoys at the Dublin Array offshore wind farm on the Bray and Kish Banks.

The Department of Transport has now been advised by Partrac Ltd that all three Metocean buoys are scheduled to be serviced soon over a period of two days.

Weather permitting, it is expected that the two wave buoys will be recovered and redeployed in the three-week period between tomorrow, Friday 11 February and Friday 4 March.

The floating lidar buoy will be towed from its location on Bray Bank to Wicklow Harbour for routine maintenance overnight and towed back to Bray Bank for redeployment in its current position. This recovery and redeployment will take place in the three-week period between Thursday 24 February 2022 and Friday 18 March.

The AMS Retriever (callsign MEHI8) will recover and redeploy all three buoys. The floating lidar buoy will be towed some 30 metres astern of the AMS Retriever at a maximum speed of 3.5 knots.

During this time, the vessel will be restricted in its ability to manoeuvre. As such, vessels operating within this area are requested to keep their distance, maintaining a safety zone around the deployment vessel, and pass at minimum speed to reduce vessel wash.

Radio transmissions will be conducted with VTS and other seafarers to notify them of the buoy operations.

Coordinates of the buoy locations and contact details can be found in Marine Notice No 10 of 2022, attached below.

Published in News Update

Following the Marine Notice two months ago on the deployment of wave buoys and a floating lidar buoy at the Dublin Array offshore wind farm, a new notice has been issued regarding the lidar buoy’s move to a fixed position.

Partrac Ltd will relocate the floating lidar buoy from its current temporary position at Kish Lighthouse to a new location in Bray Bank some time between this Wednesday 4 August and Tuesday 17 August, weather permitting.

The relocation is expected to take one day. The buoy will then remain in place for 18 months and a further Marine Notice will be issued providing information on the retrieval of the buoy.

The AMS Retriever (callsign MEHI8) will recover the buoy and tow it to its new location. During this work, the vessel will be restricted in its ability to manoeuvre.

As such, all other vessels operating within this area are requested to keep their distance, maintaining a safety zone around the AMS Retriever, and to pass at minimum speed to reduce vessel wash.

Further details including coordinates of the buoy’s new location are included in Marine Notice No 44 of 2021, which can be downloaded below.

Published in News Update

Partrac Ltd intend to deploy three Metocean buoys at the Dublin Array offshore wind farm in a one-day operation some time between this Wednesday 9 and Wednesday 23 June, weather permitting.

One floating lidar buoy and two wave buoys will be deployed by the AMS Retriever (callsign MEHI8) which will be displaying all appropriate lights and shapes.

The floating lidar buoy has a square footprint with an area of 4m2 and a height of some 4m above the water line. It is yellow in colour and has a St Andrew’s cross on top.

The wave buoys are spherical in shape with a diameter of around 1.1m. When deployed, the wave buoys appear clear with a yellow hull.

Both the floating lidar buoy and the wave buoys have a yellow light which emits five flashes every 20 seconds. The light is visible for up to three nautical miles.

The floating lidar buoy will be deployed for a period of four to eight weeks. It will then be moved to a permanent position in the south end of Dublin Array where it will be deployed for 18 months. The wave buoys will be deployed for a period of 12 months.

The floating lidar buoy will be towed approximately 30m astern of the AMS Retriever at a maximum speed of four knots.

As such, the vessel will be restricted in its ability to manoeuvre so all other boats operating in proximity are requested to keep their distance, maintaining a safety zone around the deployment vessel and pass at minimum speed to reduce vessel wash.

Details of the buoy locations are included in Marine Notice No 37 of 2021 which can be downloaded below.

Published in News Update

Mariners have been given notice of a series of geophysical surveys for the Dublin Array Wind Farm taking place between next week and early May.

The Dublin Array is a project on the Kish and Bray banks some 10 km off the east coast of Ireland, immediately south of Dublin.

As previously reported on Afloat.ie, the proposed Irish-German venture could see as many as 100 wind turbines generate power for more than half a million homes.

Fugro GB Marine Limited has been contracted for the geophysical surveys to characterise the offshore array and export cable search area, including exploring possible landfall options at Shanganagh Park and Poolbeg.

Operations across a total of four vessels are expected to begin next Tuesday 9 February and continue until Tuesday 11 May.

Details of the surveys and their coordinates are included in Fugro’s notice to mariners, which can be downloaded below.

Published in Dublin Bay

A €1.5 billion offshore wind farm stretching from Booterstown to Greystones could generate enough electricity to power 600,000 homes.

The Irish Times reports on proposals by an Irish-German partnership for the ‘Dublin Array’ offshore energy venture that could see as many as 100 wind turbines installed over 2,440 hectares, partly in Dublin Bay.

Saorgus and Innogy are now seeing a foreshore licence to conduct surveys in the intended locations of the Kish Bank and Bray Bank.

Pledges have been made to work with shipping companies, fishing interests, sailing clubs and other water users during this process, as the venture promises a “meaningful approach to supporting local communities”.

It is also hoped that the project would benefit from new Government supports guaranteeing revenue for renewable energy generators, a scheme which is currently under EU scrutiny.

The Irish Times has much more on the story HERE.

Published in Dublin Bay
Page 1 of 2

Irish Olympic Sailing Team

Ireland has a proud representation in sailing at the Olympics dating back to 1948. Today there is a modern governing structure surrounding the selection of sailors the Olympic Regatta

Irish Olympic Sailing FAQs

Ireland’s representation in sailing at the Olympics dates back to 1948, when a team consisting of Jimmy Mooney (Firefly), Alf Delany and Hugh Allen (Swallow) competed in that year’s Summer Games in London (sailing off Torquay). Except for the 1968 Olympics in Mexico City, Ireland has sent at least one sailor to every Summer Games since then.

  • 1948 – London (Torquay) — Firefly: Jimmy Mooney; Swallow: Alf Delany, Hugh Allen
  • 1952 – Helsinki — Finn: Alf Delany * 1956 – Melbourne — Finn: J Somers Payne
  • 1960 – Rome — Flying Dutchman: Johnny Hooper, Peter Gray; Dragon: Jimmy Mooney, David Ryder, Robin Benson; Finn: J Somers Payne
  • 1964 – Tokyo — Dragon: Eddie Kelliher, Harry Maguire, Rob Dalton; Finn: Johnny Hooper 
  • 1972 – Munich (Kiel) — Tempest: David Wilkins, Sean Whitaker; Dragon: Robin Hennessy, Harry Byrne, Owen Delany; Finn: Kevin McLaverty; Flying Dutchman: Harold Cudmore, Richard O’Shea
  • 1976 – Montreal (Kingston) — 470: Robert Dix, Peter Dix; Flying Dutchman: Barry O’Neill, Jamie Wilkinson; Tempest: David Wilkins, Derek Jago
  • 1980 – Moscow (Tallinn) — Flying Dutchman: David Wilkins, Jamie Wilkinson (Silver medalists) * 1984 – Los Angeles — Finn: Bill O’Hara
  • 1988 – Seoul (Pusan) — Finn: Bill O’Hara; Flying Dutchman: David Wilkins, Peter Kennedy; 470 (Women): Cathy MacAleavy, Aisling Byrne
  • 1992 – Barcelona — Europe: Denise Lyttle; Flying Dutchman: David Wilkins, Peter Kennedy; Star: Mark Mansfield, Tom McWilliam
  • 1996 – Atlanta (Savannah) — Laser: Mark Lyttle; Europe: Aisling Bowman (Byrne); Finn: John Driscoll; Star: Mark Mansfield, David Burrows; 470 (Women): Denise Lyttle, Louise Cole; Soling: Marshall King, Dan O’Grady, Garrett Connolly
  • 2000 – Sydney — Europe: Maria Coleman; Finn: David Burrows; Star: Mark Mansfield, David O'Brien
  • 2004 – Athens — Europe: Maria Coleman; Finn: David Burrows; Star: Mark Mansfield, Killian Collins; 49er: Tom Fitzpatrick, Fraser Brown; 470: Gerald Owens, Ross Killian; Laser: Rory Fitzpatrick
  • 2008 – Beijing (Qingdao) — Star: Peter O’Leary, Stephen Milne; Finn: Tim Goodbody; Laser Radial: Ciara Peelo; 470: Gerald Owens, Phil Lawton
  • 2012 – London (Weymouth) — Star: Peter O’Leary, David Burrows; 49er: Ryan Seaton, Matt McGovern; Laser Radial: Annalise Murphy; Laser: James Espey; 470: Gerald Owens, Scott Flanigan
  • 2016 – Rio — Laser Radial (Women): Annalise Murphy (Silver medalist); 49er: Ryan Seaton, Matt McGovern; 49erFX: Andrea Brewster, Saskia Tidey; Laser: Finn Lynch; Paralympic Sonar: John Twomey, Ian Costello & Austin O’Carroll

Ireland has won two Olympics medals in sailing events, both silver: David Wilkins, Jamie Wilkinson in the Flying Dutchman at Moscow 1980, and Annalise Murphy in the Laser Radial at Rio 2016.

The current team, as of December 2020, consists of Laser sailors Finn Lynch, Liam Glynn and Ewan McMahon, 49er pairs Ryan Seaton and Seafra Guilfoyle, and Sean Waddilove and Robert Dickson, as well as Laser Radial sailors Annalise Murphy and Aoife Hopkins.

Irish Sailing is the National Governing Body for sailing in Ireland.

Irish Sailing’s Performance division is responsible for selecting and nurturing Olympic contenders as part of its Performance Pathway.

The Performance Pathway is Irish Sailing’s Olympic talent pipeline. The Performance Pathway counts over 70 sailors from 11 years up in its programme.The Performance Pathway is made up of Junior, Youth, Academy, Development and Olympic squads. It provides young, talented and ambitious Irish sailors with opportunities to move up through the ranks from an early age. With up to 100 young athletes training with the Irish Sailing Performance Pathway, every aspect of their performance is planned and closely monitored while strong relationships are simultaneously built with the sailors and their families

Rory Fitzpatrick is the head coach of Irish Sailing Performance. He is a graduate of University College Dublin and was an Athens 2004 Olympian in the Laser class.

The Performance Director of Irish Sailing is James O’Callaghan. Since 2006 James has been responsible for the development and delivery of athlete-focused, coach-led, performance-measured programmes across the Irish Sailing Performance Pathway. A Business & Economics graduate of Trinity College Dublin, he is a Level 3 Qualified Coach and Level 2 Coach Tutor. He has coached at five Olympic Games and numerous European and World Championship events across multiple Olympic classes. He is also a member of the Irish Sailing Foundation board.

Annalise Murphy is by far and away the biggest Irish sailing star. Her fourth in London 2012 when she came so agonisingly close to a bronze medal followed by her superb silver medal performance four years later at Rio won the hearts of Ireland. Murphy is aiming to go one better in Tokyo 2021. 

Under head coach Rory Fitzpatrick, the coaching staff consists of Laser Radial Academy coach Sean Evans, Olympic Laser coach Vasilij Zbogar and 49er team coach Matt McGovern.

The Irish Government provides funding to Irish Sailing. These funds are exclusively for the benefit of the Performance Pathway. However, this falls short of the amount required to fund the Performance Pathway in order to allow Ireland compete at the highest level. As a result the Performance Pathway programme currently receives around €850,000 per annum from Sport Ireland and €150,000 from sponsorship. A further €2 million per annum is needed to have a major impact at the highest level. The Irish Sailing Foundation was established to bridge the financial gap through securing philanthropic donations, corporate giving and sponsorship.

The vision of the Irish Sailing Foundation is to generate the required financial resources for Ireland to scale-up and execute its world-class sailing programme. Irish Sailing works tirelessly to promote sailing in Ireland and abroad and has been successful in securing funding of 1 million euro from Sport Ireland. However, to compete on a par with other nations, a further €2 million is required annually to realise the ambitions of our talented sailors. For this reason, the Irish Sailing Foundation was formed to seek philanthropic donations. Led by a Board of Directors and Head of Development Kathryn Grace, the foundation lads a campaign to bridge the financial gap to provide the Performance Pathway with the funds necessary to increase coaching hours, upgrade equipment and provide world class sport science support to a greater number of high-potential Irish sailors.

The Senior and Academy teams of the Performance Pathway are supported with the provision of a coach, vehicle, coach boat and boats. Even with this level of subsidy there is still a large financial burden on individual families due to travel costs, entry fees and accommodation. There are often compromises made on the amount of days a coach can be hired for and on many occasions it is necessary to opt out of major competitions outside Europe due to cost. Money raised by the Irish Sailing Foundation will go towards increased quality coaching time, world-class equipment, and subsiding entry fees and travel-related costs. It also goes towards broadening the base of talented sailors that can consider campaigning by removing financial hurdles, and the Performance HQ in Dublin to increase efficiency and reduce logistical issues.

The ethos of the Performance Pathway is progression. At each stage international performance benchmarks are utilised to ensure the sailors are meeting expectations set. The size of a sailor will generally dictate which boat they sail. The classes selected on the pathway have been identified as the best feeder classes for progression. Currently the Irish Sailing Performance Pathway consists of the following groups: * Pathway (U15) Optimist and Topper * Youth Academy (U19) Laser 4.7, Laser Radial and 420 * Development Academy (U23) Laser, Laser Radial, 49er, 49erFX * Team IRL (direct-funded athletes) Laser, Laser Radial, 49er, 49erFX

The Irish Sailing performance director produces a detailed annual budget for the programme which is presented to Sport Ireland, Irish Sailing and the Foundation for detailed discussion and analysis of the programme, where each item of expenditure is reviewed and approved. Each year, the performance director drafts a Performance Plan and Budget designed to meet the objectives of Irish Performance Sailing based on an annual review of the Pathway Programmes from Junior to Olympic level. The plan is then presented to the Olympic Steering Group (OSG) where it is independently assessed and the budget is agreed. The OSG closely monitors the delivery of the plan ensuring it meets the agreed strategy, is within budget and in line with operational plans. The performance director communicates on an ongoing basis with the OSG throughout the year, reporting formally on a quarterly basis.

Due to the specialised nature of Performance Sport, Irish Sailing established an expert sub-committee which is referred to as the Olympic Steering Group (OSG). The OSG is chaired by Patrick Coveney and its objective is centred around winning Olympic medals so it oversees the delivery of the Irish Sailing’s Performance plan.

At Junior level (U15) sailors learn not only to be a sailor but also an athlete. They develop the discipline required to keep a training log while undertaking fitness programmes, attending coaching sessions and travelling to competitions. During the winter Regional Squads take place and then in spring the National Squads are selected for Summer Competitions. As sailors move into Youth level (U19) there is an exhaustive selection matrix used when considering a sailor for entry into the Performance Academy. Completion of club training programmes, attendance at the performance seminars, physical suitability and also progress at Junior and Youth competitions are assessed and reviewed. Once invited in to the Performance Academy, sailors are given a six-month trial before a final decision is made on their selection. Sailors in the Academy are very closely monitored and engage in a very well planned out sailing, training and competition programme. There are also defined international benchmarks which these sailors are required to meet by a certain age. Biannual reviews are conducted transparently with the sailors so they know exactly where they are performing well and they are made aware of where they may need to improve before the next review.

©Afloat 2020