Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Atlantic Marine Energy Test Site

The Department of Transport has been advised by Sustainable Energy Authority Ireland (SEAI) that the Marine Institute will undertake site investigation survey works at the Atlantic Marine Energy Test Site (AMETS) in Co Mayo.

The survey is expected to be completed over a 10-day period from Sunday 17 September, subject to weather and operational constraints.

Geophysical and geotechnical survey work and benthic sampling will be carried out at Test Area A, 16km from Belderra Strand, and Test Area B, 6km from Belderra Strand on the Erris Peninsula. Benthic sampling will be carried out along the proposed cable corridor at AMETS.

The survey vessel RV Celtic Explorer (callsign EIGB) will carry out the site investigation works. Throughout operations, the vessel will be displaying appropriate lights and shapes, and will also be restricted in its ability to manoeuvre.

Other vessels operating in the AMETS area are requested to give the survey vessel a wide berth during survey operations. Mariners are also advised to keep continuous watch on VHF Channel 16 when navigating the survey area at AMETS.

Coordinates and a map of the survey areas as well as contact details can be found in Marine Notice No 55 of 2023, attached below.

Published in Power From the Sea

MERC Environmental Consultants Ltd and the Marine Institute are undertaking site investigation survey works at the Atlantic Marine Energy Test Site in Co Mayo.

The surveys are expected to be completed over a three-day period during the nearest available weather window which opened last Thursday 2 March, subject to weather and operational constraints.

Survey works include a benthic survey as well as geotechnical and geophysical surveys.

The survey campaign will be undertaken within the proposed Atlantic Marine Energy Test Site, consisting of two separate areas. Test Site A is 16km from Belderra Strand, and Test Site B is 6km from Belderra Strand on the Erris Peninsula.

The benthic survey work will be conducted by the Dúlra na Mara (callsign EIFS6) a shallow draft survey vessel. Meanwhile the survey vessel RV Celtic Explorer (callsign EIGB) will carry out geophysical and geotechnical site investigation works offshore at Test Site A and Test Site B and along the proposed cable corridor.

During operations the work vessels will be restricted in their ability to manoeuvre. All other vessels are requested to leave a wide berth during the deployment operations.

The survey operations will be conducted during daylight hours only. Mariners are advised to keep continuous watch on VHF Channel 16 when navigating the survey area at the Atlantic Marine Energy Test Site.

For maps, coordinates, safety information and contact details, see Marine Notice No 10 of 2023 attached below.

Published in Power From the Sea

Marine Institute Research Vessel Tom Crean

Ireland’s new marine research vessel will be named the RV Tom Crean after the renowned County Kerry seaman and explorer who undertook three major groundbreaking expeditions to the Antarctic in the early years of the 20th Century which sought to increase scientific knowledge and to explore unreached areas of the world, at that time.

Ireland's new multi-purpose marine research vessel RV Tom Crean, was delivered in July 2022 and will be used by the Marine Institute and other State agencies and universities to undertake fisheries research, oceanographic and environmental research, seabed mapping surveys; as well as maintaining and deploying weather buoys, observational infrastructure and Remotely Operated Vehicles.

The RV Tom Crean will also enable the Marine Institute to continue to lead and support high-quality scientific surveys that contribute to Ireland's position as a leader in marine science. The research vessel is a modern, multipurpose, silent vessel (designed to meet the stringent criteria of the ICES 209 noise standard for fisheries research), capable of operating in the Irish Exclusive Economic Zone (EEZ). The Tom Crean is able to go to sea for at least 21 days at a time and is designed to operate in harsh sea conditions.

RV Tom Crean Specification Overview

  • Length Overall: 52.8 m
  • Beam 14m
  • Draft 5.2M 

Power

  • Main Propulsion Motor 2000 kw
  • Bow Thruster 780 kw
  • Tunnel thruster 400 kw

Other

  • Endurance  21 Days
  • Range of 8,000 nautical miles
  • DP1 Dynamic Positioning
  • Capacity for 3 x 20ft Containers

Irish Marine Research activities

The new state-of-the-art multi-purpose marine research vessel will carry out a wide range of marine research activities, including vital fisheries, climate change-related research, seabed mapping and oceanography.

The new 52.8-metre modern research vessel, which will replace the 31-metre RV Celtic Voyager, has been commissioned with funding provided by the Department of Agriculture, Food and the Marine approved by the Government of Ireland.

According to Aodhán FitzGerald, Research Vessel Manager of the MI, the RV Tom Crean will feature an articulated boom crane aft (6t@ 10m, 3T@ 15m), located on the aft-gantry. This will be largely used for loading science equipment and net and equipment handling offshore.

Mounted at the stern is a 10T A-frame aft which can articulate through 170 degrees which are for deploying and recovering large science equipment such as a remotely operated vehicle (ROV’s), towed sleds and for fishing operations.

In addition the fitting of an 8 Ton starboard side T Frame for deploying grabs and corers to 4000m which is the same depth applicable to when the vessel is heaving but is compensated by a CTD system consisting of a winch and frame during such operations.

The vessel will have the regulation MOB boat on a dedicated davit and the facility to carry a 6.5m Rigid Inflatable tender on the port side.

Also at the aft deck is where the 'Holland 1' Work class ROV and the University of Limericks 'Etain' sub-Atlantic ROV will be positioned. In addition up to 3 x 20’ (TEU) containers can be carried.

The newbuild has been engineered to endure increasing harsher conditions and the punishing weather systems encountered in the North-East Atlantic where deployments of RV Tom Crean on surveys spent up to 21 days duration.

In addition, RV Tom Crean will be able to operate in an ultra silent-mode, which is crucial to meet the stringent criteria of the ICES 209 noise standard for fisheries research purposes.

The classification of the newbuild as been appointed to Lloyds and below is a list of the main capabilities and duties to be tasked by RV Tom Crean:

  • Oceanographic surveys, incl. CTD water sampling
  • Fishery research operations
  • Acoustic research operations
  • Environmental research and sampling operation incl. coring
  • ROV and AUV/ASV Surveys
  • Buoy/Mooring operations