Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Tug

Any ship coming into Dublin Port in today’s gales after crossing the Irish Sea will have felt mighty glad to get into the shelter of the port. But for P & O’s European Endeavour late this morning, there was the additional tricky matter of getting turned in the river without taking out the Poolbeg Y & BC marina, and then going astern into her berth in the Alexandra Basin writes W M Nixon.

Fortunately the renowned Dublin Port push-me-pull-you tug Shackleton (one of the pair with her sister-ship Beaufort) was on hand to show what she can do when a real heave in any direction is needed, and though it took time, the Endeavour was lined up and slid neatly into place.

tug2
Shackleton sets to her work. The wind freshened markedly as the manoeuvre was under way. Photo: W M Nixon

Many Afloat.ie visitors will be familiar with the “Ballet of the Tugs” performed by Shackleton and Beaufort during the Dublin Riverfests. But as this morning’s task showed, while the tugs may well be game to perform as an all-singing all-dancing act, when there’s work to be done they’re more than able for it, as this sequence shows. The photos as usual fail to capture a sense of the real strength of the breeze – Dublin Airport was recording 40 knots with 50 knot gusts, and it got fresher after that, a real winter gale. But when summer comes, doubtless we’ll see the ballet again, and we sign off with a pic of that.

tug3

tug4

tug5

tug6

Summertime in Dublin. The hard-working Shackleton takes time out for a spot of Strictly with her sister-ship Beaufort. Photo: W M Nixon

Published in Dublin Port
Tagged under

#INLAND WATERWAYS - Waterways Ireland has taken delivery of its third tug boat from Mooney Boats of Killybegs.

Designed by Marine Design International, the Inish Fendra is an 11.2-metre LOA steel-built tug which has been specifically tailored for operation on the Shannon-Erne waterway system.

Its design bears many similarities to the Inis Muillin, which was delivered by Mooney Boats in 2010.

inisfendramooney

The new tug, Inisfendra built by Mooney Boats of Donegal

According to Maritime Journal, the design process "involved significant input from the vessel operators and managers combined with the latest technology and ideas from the designers and builders to improve on efficiency" and safety.

A key feature of the Inish Fendra is its 3,500-litre ballast tank and pumping system, which is operated by the push of a button and can reduce the vessel's air draft by 0.2m.

Maritime Journal has much more on the Inish Fendra HERE.

Published in Inland Waterways

As the Russian 'A' class Mir passed the LE Aoife off Dunmore East in mid-morning, the largest tall ship of the festival headed the start of the Parade of Sail, writes Jehan Ashmore.

Crowds left their cars in fields outside Dunmore East and descended into the harbour and surrounding headlands to witness the highlight of the four-day festival. Adding to the scene were the numerous leisure-craft, yachts and intrepid kayakers that gathered to greet the procession which took some two hours to pass the fishing harbour.

No sooner had the fully-rigged ship Mir had slipped beyond the anchored naval vessel that the gaff schooner Johanna Lucretia, under full sail came closer into view. She was closely followed by the Ocean Youth Trust Scotland's Bermudan cutter Alba Explorer.

Mir

The Russian 'A' class Mir passing the LE Aoife off Dunmore East. Photo: Jehan Ashmore

Of all the 45 tallships participating the Columbian Navy's barque ARC Gloria presented the most colourful entrant. She proudly flew a large horizontal tricolor of yellow, blue and red representing the South American nation.

When it came to the turn of the Europa to pass the LE Aoife, the tug Bargarth gave a wonderful send-off with the traditional display of water jets shooting sky-high, nearly reaching the top of the three-masted barque.

Marking the tail-end of the parade was the Jubilee Sailing Trust's Lord Nelson, another barque that departed the estuary with the Hook Head Lighthouse forming a majestic backdrop.

At this stage several of the large tallships could be seen on the far horizon in preperation to the start of the first race leg of this years Tall Ships Races....next port of call Greenock!

More Tall Ships Photos

Dublin Hosts Tall Ships in 2012

View Waterford's Parade of Sail Photo Gallery Here

Published in Tall Ships

Lord Mayor of Dublin and Admiral of Dublin Port, Gerry Breen, performed the 523 year-old "Casting of the Spear" ceremony in Dublin Bay on midsummer's day, writes Jehan Ashmore.

The 'casting' for yesterdays' re-enactment by the Lord Mayor took place onboard the Dublin port Company tug Shackleton.

From the deck of the Spanish built 50-tonne bollard pull tractor-tug, a spear was launched into the sky and fell deep into the cold water's of Dublin Bay. The ceremony once again marked the position of the city boundaries eastwards.

The medieval tradition of 'Casting of the Spear' dates back to 1488 when the then Lord Mayor, Thomas Mayler, set out on his horse to ride the city's boundaries.

According to historical records he rode out onto the strand as far as a man might ride and from there he cast a spear into the sea. At that time, casting the spear demonstrated the extent of the city boundaries eastwards.

The tradition marks one of many significant moments in Dublin Port's long history since its establishment as a trading post some 1,200 years ago.

Published in Dublin Port
The Irish flagged general cargo-ship Arklow Raider which went aground when departing Drogheda Port on Tuesday, remains stuck on a sandbank tonight, writes Jehan Ashmore.
In strong south-east gales the 90-metre vessel with a cargo of cement bound for Swansea, ran aground off the port's north breakwater. There were plans to tow the 2,999 gross tonnes vessel this morning but no large tugs were available to assist. It is expected that a tug will arrive at the scene tomorrow.
Meanwhile the crew of the Arklow Raider remain onboard the vessel which is in no danger. The dry-bulk cargo ship vessel is owned by Arklow Shipping Ltd and is one of nine 'R' class sisters built by the Dutch shipbuilders Barkmeijer Stroobos B.V.

The Drogheda Port Company's patrol launch, Boyne Protector has been monitoring the situation as the Arklow Raider lies close to the entrance of the Co. Louth port.

Published in Ports & Shipping

ESB’s 2040 strategy Driven to Make a Difference: Net Zero by 2040 sets out a clear roadmap for ESB to achieve net zero emissions by 2040. 

ESB will develop and connect renewable energy to decarbonise the electricity system by 2040. ESB will invest in the development of new renewable generation, including onshore and offshore wind and solar, and will significantly increase the amount of renewable generation connected to our electricity networks.

ESB will:

  • Deliver more than a fivefold increase in our renewable generation portfolio to 5,000MW.
  • Reduce carbon intensity of generation fleet from 414 to 140gCO2/kWh by 2030.
  • Decarbonise 63% of our generation output by 2030 and 100% by 2040 (up from c20% now).

Offshore wind

ESB know the importance of offshore wind in tackling climate change and delivering net zero. Ireland has a unique capability given its prime location to take advantage of the potential of offshore wind. ESB are working hard to develop offshore wind projects for the benefit of everyone across society in Ireland and the UK. This includes ongoing engagement with marine users and local communities so ESB can deliver these significant projects.

Offshore wind will play a major role globally in our fight against climate change. It will help to replace energy generated by burning fossil fuels with that from a clean, safe and secure renewable energy source. Ireland’s geographic location on the exposed edge of the Atlantic presents us with a significant opportunity to generate electricity from wind – both offshore and onshore.

Power from onshore wind farms currently provide over one-third of Ireland’s electricity needs. But, whilst its marine area is many times the size of its landmass, Ireland’s offshore wind potential is only starting to be realised. ESB have a coastline stretching over 3,000km but only one operational offshore wind farm – Arklow Bank, with a capacity of 25 MW. In contrast, Belgium’s coastline is only 63km long, but it has already developed more than 2,000 MW of offshore wind. In Great Britain, with a coastline four times the length of ours, offshore wind generation now equates to over 440 Arklow Banks, with an installed capacity of 11,0000 MW as of late 2021.

The Irish Government's target to install 5,000 MW of offshore wind capacity in our maritime area by 2030 is set out in the Climate Action Plan 2021. It also has the objective to source 80% of Ireland’s electricity needs from renewables by the same year. In line with this, ESB is applying its professional and proven engineering expertise to the challenges set within the Climate Action Plan.

ESB are committed to playing a strong role in developing Ireland’s offshore wind potential for the benefit of the people of Ireland. This will be done in consultation with marine users and local communities, and with due care for the marine environment.