Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Dublin

The Grand Canal Marina in the inner dock of the Grand Canal Basin has a landmark 'Box in the Docks' building familiar to many Dubliners. The 50-berth facility opened in 2004 and has become an asset for boaters in the city centre especially during festivals such as the recent Tall Ships visits, permitting boating access and overnight stays (albeit via a sealock) in Dublin city.

Published in Irish Marinas

#dublinbarge – After one hour personal instruction on how to drive, moor and navigate a barge through a lock, you can drive your very own barge in Dublin city centre.

The barge 'Scéal Eile' is a new and exciting form of accommodation offered at Grand Canal Dock, Dublin 2.

Dublin Barge Hire is Dublin city centre's first self-catering cruising barge.

Not only is this an exclusive and unique place to stay, the barge is a form of transport as well.

Guests will have access to the secure and serviced Marina in Grand canal Dock and from here you can navigate through seven locks up to Portobello.

It is a four hour round trip along an historic stretch of canal, originally opened in 1796.

The barge has a capacity of 4 adults and 2 children. For two nights based on two people sharing the package is priced at €300.

'Scéal Eile', a 50 x 10 foot (15 x 3.1 m) barge was built in 2006 to a high specification according to its owners. They say the barge has a warm inviting interior and a comfortable living space that makes this self-catering barge an environment for a holiday break.

It contains a multi-fuel stove with a back boiler which makes a stay on the barge during winter a cosy experience.

More on www.dublinbargehire.com

Published in Inland Waterways

# ROWING: Neptune Rowing Club will hold their 31st annual regatta on Saturday  over a 1200 m course at Islandbridge. This is the first regatta of the season in the Irish rowing calendar, and it has attracted a big entry, with 204 races. Because of the large entry there will be 26 preliminary races held on the Friday evening between 6 and 7.30 pm.

 Racing on Saturday is scheculed from 8.30 am to 6.24 pm, with a race every three minutes throughout the day. The feature race will be the men's senior eights at 5.51 pm, which is a straight final between a Neptune/Commercial composite crew and a visiting English crew from Broxbourne Rowing Club with Irishman Albert Maher on board. Broxbourne will also compete in the men's intermediate eights and Albert Maher will compete in the senior sculls.

The women's senior single sculls is a straight final between Sarah Dolan and Eimear Lambe, both from Commercial. The men's novice single sculls has attracted an entry of 37 scullers, with 31 entrants from Dublin University!

Other visiting crews to the regatta are Portora, Bann and Belfast Rowing Clubs from Northern Ireland, as well as a good representation from all over Leinster. There will also be crews from Waterford Boat Club and Fossa from Munster and Sligo R.C. from Connaught.

Published in Rowing

# ROWING: UCD produced an exact repeat of last year in the Colours Races on the Liffey today by winning the senior men’s and women’s events and also taking the novice men’s race. Trinity again won the women’s novice eights race with a dominant performance.

The senior men’s race was won in the first 20 metres: UCD’s big crew gained a crucial advantage and exploited it so competently that they had the race in the bag by the Four Courts. The win gave Dave Neale a record sixth Gannon Cup crown.

The UCD senior women also started well and established a good lead, but Trinity nipped away at them down the course and lost by only a half length.

The men’s novice eight race ended before the line, as Trinity crashed into the wall after Watling Street Bridge due to a snapped steering line. UCD had taken the furthest south arch in Winetavern Street bridge, prompting a Trinity objection, but the race umpire said that he had told the crew to avoid the marked centre lane due to a possible hindrance there.

Colours Races 2013

Men – Eight, Senior (Gannon Cup): UCD (L McCarthy, M Bailey, P Moore, A Sheehan, D Neale, J Nihotte, G Duane, P Grogan; cox: K Joyce) bt Trinity 4l

Eight, Novice (Dan Quinn Shield): UCD bt Trinity not rowed out

Women – Eight, Senior (Corcoran Cup) UCD (A O’Riordan, K Joy, O Finnegan, S Bennett, C Ni Reachtagain, G Collins, A Gilligan, B Lait; cox C McGowan) bt Trinity ½ l

Eight, Novice (Sally Moorhead Trophy): Trinity bt UCD easily.

Published in Rowing

#Missing - A body recovered from the sea off north Co Dublin yesterday may be that of a man who went missing from Rush at Christmas.

The Irish Independent reports that a post-mortem is being carried out on the body to confirm if it is that of 24-year-old Paul Byrne, who was last seen in the early hours of Christmas Day.

Fishermen in the Irish Sea made the grim discovery in their nets yesterday and brought the body to Skerries harbour after 8pm.

The Irish Independent has more on the story HERE.

Published in News Update

#CoastalRowing - The East Coast Rowing Council has announced its list of coastal rowing regatta fixtures in Dublin, Wicklow and Wexford for the 2013 season.

Commencing with the Greystones Regatta on 26 May, the schedule also includes events in Arklow (2 June) and Dalkey (9 June), the Stella Maria Regatta in Ringsend on 16 June and the Bray Regatta on 30 June.

July will see two events, the St Patrick's Regatta in Dublin's Docklands on 14 July and St Michael's Regatta off Monkstown and Dun Laoghaire on 28 July, while the Wicklow Regatta will mark the end of 2013's summer events on 5 August.

Locations of the various regattas and suggested viewing points are available HERE.

Published in Coastal Rowing

#Coastguard - Howth Coast Guard responded to 53 calls throughout 2012, with its 25 volunteers clocking up more than 4,000 man hours.

In its review of the year, the north Dublin unit of the Irish Coast Guard noted that while its safety boat Grainne was dispatched to fewer calls on the water, there was an increased number of cliff and beach incidents to attend to, particularly in the Clontarf and Dollymount areas.

Howth also became one of the first search and rescue teams in the State to avail of the Irish Coast Guard's new side scan sonar.

As previously reported on Afloat.ie, the coastguard saved 161 lives throughout a busy 2012 that saw the network respond to almost 2,000 call-outs nationwide.

And 2013 so far has been off to a busy start, marked by a dramatic cliffside rescue in Donegal on New Year's Day.

Published in Coastguard

#ISAF - In just a few hours the International Sailing Federation (ISAF) and Rolex will announce the 2012 ISAF Rolex World Sailors of the Year in Dublin.

The award ceremony will take place during a dinner hosted at the historic Mansion House in the heart of the capital, and will be attended by many of the world’s top sailors and delegates to the ISAF Annual Conference taking place in Dun Laoghaire.

This year's winners as always are selected by the ISAF Member National Authorities (MNAs), the national governing bodies for sailing around the world, who have been invited to vote for one male and one female nominee they believe most deserves the award for their efforts during the nomination period.

This year there are five male and four female nominees who have been shortlisted for the ISAF Rolex World Sailor of the Year Awards based on their achievements during the qualifying period of 1 September 2011 to 31 August 2012.

HM King Constantine, ISAF President of Honour, will announce the winners, each of whom will be presented with the prestigious ISAF Rolex World Sailor of the Year trophy and a distinctive Rolex timepiece.

The 2012 nominees are:

Male

  • Ben Ainslie (GBR) - Finn - London 2012 Olympic Gold Medallist & 2012 World Champion
  • Mathew Belcher & Malcolm Page (AUS) - Men's 470 - London 2012 Olympic Gold Medallists, 2011 and 2012 World Champions & 2011-2012 ISAF Sailing World Cup Champions
  • Nathan Outteridge and Iain Jensen (AUS) - 49er - London 2012 Olympic Gold Medallists & 2011 and 2012 World Champions
  • Loïck Peyron (FRA) - Outright Around the World Record
  • Tom Slingsby (AUS) - Laser - London 2012 Olympic Gold Medallist & 2011 and 2012 World Champion

 

Female

  • Támara Echegoyen, Ángela Pumariega and Sofía Toro (ESP) - Women's Match Racing - London 2012 Olympic Gold Medallists
  • Helena Lucas (GBR) - 2.4mR - London 2012 Paralympic Gold Medallist & 2011-12 ISAF Sailing World Cup Champion
  • Saskia Sills (GBR) - RS:X - ISAF Youth Sailing World Champion & European Youth Champion
  • Lijia Xu (CHN) - Laser Radial - London 2012 Olympic Gold Medallist

 

Find out more HERE about the nominated sailors and their achievements.

Published in World Sailing

# CANOEING: Two K2 boats with a very marked combination of experience and youth led the way home at the Liffey Descent today. Deaglan O Drisceoil (47) and Tom Brennan (20) won in a fine time of one hour 47 minutes and 54 seconds, while the father-and-son combination of Malcolm Banks (50) and Liam Banks (20) followed them in. The K2 of Peter Egan and British international paddler Jon Simmons were third, although they suffered a capsize at Straffan weir, where there were a series of chaotic collisions.

Mickie Brennan of Thomastown Paddlers was an impressive winner in the K1 class, taking this title for the first time. Kevin Pierce of Wildwater Kayak Club was second, with Brennan’s clubmate Anthony Forristal third.

The good conditions made for a satisfactory day out at the new venue of Garda Boat Club. The prizes were presented by Kieran Mulvey and John Treacy of the Irish Sports Council.

Liffey Descent, Straffan to Islandbridge, Saturday (Selected Results)

K1 – Senior Men: 1 M Brennan (Thomastown Paddlers) 1:54.33, 2 K Pierce (Wildwater KC) 1:55.10, 3 A Forristal (Thomastown Paddlers) 1:59.11. Senior Women: A Smith (Wildwater KC) 2:18.35. Masters: 1 G Mawer (Salmon Leap) 1:55.09

K2 – Senior: 1 D O Drisceoil, T Brennan (Salmon Leap) 1:47.54, 2 M Banks, L Banks 1:48.10, 3 P Egan, J Simmons 1:48.49. Mixed: 1 J Egan, B Farrell (Salmon Leap) 1:56.07. Junior: 1 B O Casaide, R Brady (Salmon Leap) 2:11.40. Masters: A Seaford, J Treadgoud (Reading) 2:06.34. Veteran: 1 T Dillon, P Moroney (Wildwater KC) 2:04.04.

Touring Kayak Double: 1 P Scott, M Cooper 2:06.17, 2 S Martin, A Martin (Richmond) 2:06.49, 3 G Collins, B Gallagher (Salmon Leap) 2:12.07.

Wildwater – Senior Men: 1 A Hamel 2:04.16, 2 I Mac Giolla (Salmon Leap) 2:05.07, 3 J Gallagher (Galway KC) 2:13.57.

Canadian Triple: 1 S Doyle, M McGrath, D Doyle (Tullow) 2:53.31, 2 D Carroll, L Griffin, C Cullen 3:01.47, 3 C Slevin, N Slevin, M Slevin (32nd Limerick Scouts) 3:03.52.

Canadian Double: 1 B McNulty, D Bradburn (Chester) 2:39.36, 2 A Magrath, P Tennant (Paddleplus) 2:35.10, 3 N Canavan, T Marron (Mid Antrim) 2:38.47.

Canadian Single (ICF): 1 A Hales (Czech Canoe Team) 2:04.33, 2 D Jirka (Czech) 2:05.01, 3 M Novak (Czech) 2:05.40. Canadian Single: 1 C Smith 2:54.08, 2 K McCabe (Lisburn City) 3:16.47, 3 A Redmond 3:24.20.

General Purpose – Senior Men: 1 S Hendrick (Ribbontail Paddlers) 2:21.33, 2 D Horkan (Moy) 2:21.48, 3 M Redmond (Wildwater KC) 2:26.28. Senior Women: 1 H Clarke 2:32.56, 2 J Kilbride 2:39.39, 3 E Kelly (Castleknock College) 2:40.19. Junior: R Mac Ghiolla Rua (Celbridge) 2:28.59, 2 P Deering (ICU) 2:29.47, 3 G Doolan (Celbridge Paddlers) 2:36.41. Junior Women: C Nic Ghiolla Rua (Celbridge) 2:56.26. Masters: R Vincent (Saor Valley) 2:17.05, 2 J Keegan 2:23.33, 3 N Butler (DBSC) 2:25.30.

Published in Liffey Descent

#ROYAL CANAL - The Royal Canal towpath is an "obvious candidate" for a stretch of the new cross-country cycle route from Dublin to Galway proposed by the Minister or Transport.

The Irish Times reports that Minister Leo Varadkar has instructed the National Transport Authority (NTA) to examine possible routes for the project, which would involve development of the present towpath along the waterway from Mullingar to Maynooth.

The NTA is already funding preparatory work with a view to upgrading the canal path as a premium quality Greenway Route for cyclists and pedestrians in the Fingal area from Ashtown to Westmanstown - and will now look at the feasibility of extending this project through Leixlip to Maynooth.

“A national off-road cycle trail would be a first for Ireland and would be a great tourism asset," said the minister, who added that the scheme has "the potential to bring in at least €15 million per annum, much of that going straight into local businesses along the route.”

Published in Inland Waterways
Page 3 of 12

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020