Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Foxall

#roundireland – After spending last Friday night in the lee of Mount Snowdon, with 35-50 knot winds and rough seas off the Welsh coast, Team Oman Sail called it a day on their ill-fated record attempt and headed back to France early on Saturday morning.

Steve Fossett's 1993 record lives on but Irish crew man Damian Foxall has promised to return and make another attempt.

If the ultra fast MOD70 trimaran gets the right conditions it is estimated as much as ten hours can be shaved off the 1993 Lakota 44 hour record, thanks to new sailing technology.

For now though, Omansail continues its three week training session (part of a build up to the Round Europe race) back in Lorient, France.

'On Tuesday we are out testing with the new Tri Prince de Bretagne', Foxall told Afloat.ie

The following week three MOD 70's go to the training centre in PLF, Oman Sail will line up with Gitana and hopefully Jean Pierre Dick's new MOD 70 Paprec Virbac.

'We've a good season ahead, a couple of short Breton races, three more training sessions, then the Round Europe with a stopover in Dublin, the Fastnet'

The miles flow easy under the MOD 70 hulls and with Foxall's commitment it look's like Omansail will certainly be back for the Fossett record.

Published in Offshore

#roundirelandrecord – A change in weather forecast has led Kerry sailor Damian Foxall to postpone his bid to beat the Round Ireland speed sailing record for 24 hours. The Oman Sail trimaran craft skippered by Sidney Gavignet is now set to arrive from France on Friday 22nd off the Kish lighthouse on Dublin Bay. The 20-year old record set by Steve Fossett in 1993 stands at 44 hours.

Foxall and his five man crew (who may yet be joined by an Irish sailor) have identified strong easterly winds gusting to over 40 knots to start the record bid. XC weather forecasts strong East South East winds for 72 hours from late on Thursday.

The National Yacht Club in Dun Laoghaire will officiate the World Speed Sailing Record bid under its Irish commissioner Chris Moore.

 

 

Published in Offshore

The MOD 70 Oman Sail, a giant trimaran will attempt to break the non-stop Round Ireland Speed sailing record starting in two days time. As previously reported Ireland's Damian Foxall confirmed to Afloat.ie this morning the bid to beat the 20-year record held by the late Steve Fossett's Lakota will more than likley start off the Kish lighhouse on Dublin Bay. 

The professional crew are out to beat the one day, 20 hour and 42 minute record that has stood since 1993. To do it they must average more than 15.84 knots for the entire 700-mile voyage.

Foxall and a five man crew led by France's Sidney Gavigonet can opt to circumnavigate the country in either direction. The crew expect to encounter 40–knot winds for a time after the start according to the latest forecasts for the Irish Sea on Thursday.

According to the world speed record council (WSSR) there is only one record for whatever direction the multihull takes so she may sail north or southabout around Ireland.

Under WSS rule 20d the the only approved starting/finishing line is: Dun Laoghaire: between the light on the south pier: 53° 18.1' N; 6° 07.6' W and Kish Lighthouse: 53° 18.7' N ; 5° 55.5' W

The course must enclose the whole of Ireland and the following islands or rocks:Rathlin Is, Tor Rocks and Gulf Is, Tory Is, Eagle Is, Tearaght Is, Great Skellig, Fastnet Rock, Coningbeg Rock, Tuskar Rock.

 

Published in Offshore

#VOR – One of Ireland's most famous and most fearless ocean sailors, Kerry born Damian Foxall, is edging ever closer to realising the dream of a lifetime in what would be a moment of national triumph when the Volvo Ocean Race ends on Galway Bay.

Foxall is watch-leader on the battling French boat 'Groupama', overall leader and current favourite to win the gruelling 39,000-mile round the world race. He has played what has been spoken of as "an inspiring role" in the boat's success so far in the race.

"The Irish Examiner" described Damian Foxall, who now lives in France, as "unquestionably Ireland's finest ocean racing sailor whose name is whispered with awe among sailing's elite. He has also been called Ireland's "most capped" sailor having won a string of the world's most famous sailing races.

Now as the 2011-2012 Volvo Ocean Race enters its final decisive phase – the six boat fleet will power its way into Galway Bay in the early hours of Tuesday morning - Foxall is poised to win sailing glory and to hear the roar of the crowd and the ringing rounds of applause in his ears.

The last time Damian heard that roar, mingled with the strains of  the beguiling "The Galway Girl", was in 2009 when the "Green Dragon", on which he was watch leader, arrived in the city to a rapturous 3am stop over reception. It was a reception the like of which has never been seen before in the race history. The Green Dragon, the Chinese-Irish entry, took a podium 3rd place that night after racing across the Atlantic from Boston.

Three years later, Foxall's boat  "Groupama", skippered by the legendary French sailor Franck Cammas is tightening its grip on what has been one of the toughest Volvo Ocean Races and is moving every closer to overall victory.

"Camas already has "one hand on the trophy" race commentators in Lorient said after "Groupama" snatched a vital hometown victory in the in-port race on Saturday increasing its lead on its nearest rival, the US entry, Puma to 25 points. "Groupama" now has 225 points ; Puma 200; Camper (Spain/New Zealand) 196 and . Telefonica (Spain) 194 .

The final 450 mile leg of the race from Lorient to Galway, which is now under way, carries 30 points and an in port race in Galway a further 6. The final sprint to Galway could, according to race analysts, be one of the toughest and hardest fought yet.

For Foxall, this will be his eighth race around the world and the fourth time he has taken part in the Volvo Ocean Race. He admits he is nervous about winning in front of a home crowd.  Speaking in Lorient he said "It's our race to lose and anything but overall victory would be a disaster for us," the Derrynane native said.  "It is totally possible to lose the race from here."

"Our job now is very different to the first three-quarters of the race when we sailed all out," cautions Foxall.  "Now we have to be very aware of risk management, we have to keep our noses clean and resist pressure from Ken Read on Puma, our nearest threat."  A basic failure of critical equipment causing Groupama to finish last into Galway could be enough to give the advantage to Read.

Nevertheless, the prospect of a repeat of the 2009 race stop-over is causing great anticipation in the race fleet.  "It's going to be big.  Throughout the race, the sailors and shore-teams who were in Galway last time have all been talking about their incredible experience there.  We're all aware of the extraordinary effort being made in Ireland this time so we're looking forward to it."

Other crew looking forward to a special welcome in Galway include Cork  sailor Justin Slattery  who is bowman  on " Abu Dhabi Ocean Racing". It's skipper Ian Walker was skipper of Ireland's Green Dragon in 2008-2009 . He too has fond memories of the celebrations and the atmosphere in Galway docks for the dramatic night-time arrival of the fleet in the 2008-09  race. Justin Slattery who was bowman on the 2006-2006 Volvo Ocean Race winner ABN-AMRO One, and Damian Foxall both recall that they had never seen such race finish receptions.

Writing about that night in his book  "Ocean Fever",  Foxall recalled "It was 3am in the morning and the crew expected to be greeted by a few die hard supporters but in fact it was more like All Ireland final day."

"Out of the darkness, a RIB pulled up beside us, her crew dressed for offshore conditions and all cheering madly. Nice welcome, we thought. But as we crossed the bay, the fleet around us grew and by the time we were getting closer to the port where the channel narrows, the fleet was huge: you could have walked from one boat to another and in the middle of the night. And we were still trying to race." 

There was more to come. In the dim moonlight, as the fleet crept towards Galway docks, the Green Dragon crew could just make out the enormous crowd lining every spare bit of space on the docks. 

"We could see the sheer scale of 9,000 people gathered at three o'clock in the morning. We never expected this."

Foxall has won some of the world's top races including  the 2007/2008  Barcelona World Race sailing with co-skipper Jean Pierre Dick on the Open 60 Paprec-Virbac.

He completed a world record circumnavigation in early 2004 with  Steve Fossett on the G-Class catamaran Cheyenne. He was named Sailor of the Month by Afloat Magazine in March 2004.

Published in Ocean Race

#vor – Forget the soccer disappointment! Ireland is to the fore in world sailing again writes Tom MacSweeney. France's Groupama completed a heroic comeback victory on Leg 8 of the Volvo Ocean Race today strengthening their grip on the overall standings and realising a dream homecoming to the port of Lorient. Kerryman Damian Foxall is aboard and a podium finish for an Irishman in Galway beckons.

Skipper and sailing legend Franck Cammas and his men were cheered by thousands of fans on the Brittany coast after crossing the finish line at their home port at 13:31:04 local time, with an elapsed time of four days, 23 hours, 31 minutes and four seconds.

When he contracted Damian Foxall to his crew, Camas said of the Irishman: "He is such a great sailor it is better to have him with you than against."

Published in Ocean Race
Tagged under
31st December 2010

Foxall Recalls Barcelona Race

In February 2008 Caherddaniel sailor Damian Foxall with Frenchman Jean-Pierre Dick (FRA) crossed the finish line of the first ever Barcelona World RACE as winners onboard Paprec-Virbac 2. Now the Barcelona Race organisers have released an eve of race interview with Foxall.

The pair set an inaugural course record of 92 days, 9 hours, 49 minutes and 49 seconds over the round the world route, although the first edition of the race began earlier in the year – on November 11, 2007.

Foxall is currently immersed in another round-the-world project, as part of the Groupama team preparing for their entry in the 2011-12 Volvo Ocean Race – his fourth participation in the race. With less than 24 hours to go until the start of the second edition, they asked him to cast his mind back to the Barcelona World RACE start:

What feelings do you have looking back at this pre-start period of the Barcelona World RACE?

"Like any oceanic race it's an accumulation of a huge amount of effort in terms of just getting the project to the startline. The race is quite often just the end part of what is quite a long process by the skippers to realise the boat's potential, along with the shore team and the designer and the sail designers. And to a certain extent for a lot of them they'll have had the resources and time to put a bit of the writing on the wall already, in other words to arrive with the very best boat and the very best possible team they can.

"Of course what happens over the next three months might end up telling a different story but most of the guys will hope they already have done what they can to have the best boat and the best possible outcome in the race."

What is your assessment of the fleet, who are your favourites to win?

"I think Jean Pierre Dick and Loick Peyron on Virbac-Paprec 3 are of course going to be one of the favourites, they've got various successes with the Transat Jacques Vabre together, and each have more and more. I certainly hope for the best and wish good things for them.

"It's actually quite an impressive line up with Michel Desjoyeaux and Foncia, and I'm sure that will be one of the main boats Jean-Pierre and Loick have to contend with. I think Groupe Bel will have a very, very good team as well, though they're possibly less well known to the general public outside of France.

"I'm not sure what stage Alex Thomson is at, but I think that was a very good pairing with Andrew Meikeljohn. I've sailed a lot with Andy and I'm sure whatever happens they would have had a good time.

"Jean-Pierre and I had been working towards doing it again when other projects came up, and I'm pretty sure if it wasn't for the Volvo Ocean Race I'd be there this time. So I'll be rooting for my home team and hope their new boat proves fast and reliable. I know they're both more than capable of delivering the goods."

Were there any favourite moments of the race for you when you'll be thinking about the skippers in this edition?

"The halfway mark is quite an experience. By that stage there's a certain amount of writing on the wall and you're hopefully well into your stride. Halfway round the world you've settled into a rhythm and you know what your boat is capable of, you know what the other boats are capable of and so I think it's a fairly significant moment. When you go through the Cook Strait and you look east into the Southern Ocean and you're halfway round the world that's quite a memorable mark of the course I guess.

"Obviously Cape Horn is a classic. But I think the biggest memory for me was coming back, the last stage into Barcelona and the contrast from three months at sea and coming back to modern life makes quite an impression, and especially so for us, winning the first edition. It's a great landmark for all of us to come back in."

Is there anything you took from the race you'd pass on to the skippers heading out tomorrow?

"It's a huge challenge and most of the skippers who are there have either been there before or have similar experience to myself so I'm not sure I'd pass on anything that the guys don't already know.

"But it's a long way, it's three months at sea, and unlike the Vendée Globe you're going to sea with somebody else, and it's not like the Volvo where you've got a larger group of people. You're going to sea with one other person and that's probably the most important aspect in terms of the race.

"On the one hand it's the biggest attribute you've got, your buddy, your co-skipper. And it's really important to make that relationship work well and to understand what they need, and to maintain a single objective in common that you both agree on and to basically cross the line having achieved that goal. For some it might be winning, for some it might be just finishing the race, but that common objective is probably the single most important thing that the skippers need to agree on before the start."

Published in Offshore
Tagged under

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020