Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Peter Lawless

Disappointment is always hard to take, but Peter Lawless is determined, even though he has, this time, failed in his ambition to become the first Irishman to sail around the world non-stop.

The Kerry solo sailor left Kilrush Marina in Clare with high hopes in August, estimating that he would be, he told me, about eight months at sea alone aboard his yacht, Waxwing, a Rival 41, which he had "upgraded for the challenge".

"She is perfect for this circumnavigation," he said but told me that the two things he feared most were mast or rudder trouble.

West of Portugal, one of those happened.

Waxwing departs Kilrush Marina on the Shannon Estuary in AugustWaxwing departs Kilrush Marina on the Shannon Estuary in August

He had a problem when something hit the rudder, and the result of that was the end of his voyage.

He has decided not to continue his voyage.

Sailing along on Waxwing in the Shannon Estuary

"Very disappointed but determined," he told me from Teneriffe, where he was making repairs. But there was a lot to be considered, particularly with the timing of the voyage and the weather. This weekend he decided that the voyage couldn't continue.

It was not an easy decision, but he says he made it for safety reasons. He will be returning home, but next year is to be considered, as you can hear on this week's Podcast.

• Lawless has left for Tenerife and is now en route to Portugal. He expects to arrive there next week.

Published in Tom MacSweeney
Tagged under

Limerick solo sailor Peter Lawless has had further setbacks to his hopes of being the first Irishman to sail round the world non-stop and alone, as he has experienced renewed difficulties with his steering gear and rudder, which necessitated putting into port in Tenerife in the Canaries today with his Rival 41 Waxwing.

However, although he is frustrated in the hope of doing the non-stop from an Irish port, if he can get the necessary repairs made good, it is still possible for him to achieve an Irish “first” with start and finish in Tenerife, and he is determined to continue south when the work has been completed to full seaworthiness requirements.

Tracker chart here

Published in Solo Sailing
Tagged under

After a three day, no-shore-contact stopover at anchor off Portimao in southern Portugal to sort rudder and electronics problems, Limerick’s Peter Lawless (52) is southward bound again in his Rival 41 Waxwing in his bid to be the first Irishman t sail solo round the world non-stop. Under the accepted rules of such contests, challengers are permitted to anchor in some convenient roadstead, but are not allowed to avail of any shoreside assistance whatsoever.

The problem with the steering was completely solvable, but it took time as it involved the clearing of lockers. However, the masthead units came adrift because of a broken bracket, and they are now operating from a new location at the cockpit. After the frustrations of endless headwinds once the Bay of Biscay had been crossed, the weather has now settled down, and currently there are fair winds the whole way to the Cape Verde Islands.

Track chart here

Published in Solo Sailing

Solo sailor Peter Lawless (52) of the noted Limerick voyaging family has met with mixed fortunes in Week One of his challenge to be the first Irishman to sail non-stop single-handed round the world south of the five great capes. Having taken his departure from Kilrush in the Shannon Estuary on Friday, August 21st with his Rival 41 Waxwing, he had to contend with winds from forward of the beam - sometimes quite strong - for a while, but then he benefitted for a few days from the northeasters which were making things tough for the Figaro fleet slugging their way from the Spanish coast back up to Brittany.

A special feature of his project is that although he has electronic equipment, he is navigating by sextant and paper chart in the classic style. On his way south, though, he particularly noted the high level of shipping on the Transatlantic route westward of the English Channel, and much appreciated the protection provided by the AIS system. But a problem arose when the masthead aerial serving it came partially adrift, and he had a painfully bruising time at the masthead bringing it safely down to deck level for temporary deployment from the cockpit.

The fact that the high-pressure area which normally sits in summer over the Azores has in recent days been settled over Ireland has interfered with the normal wind pattens between northwest Spain and the Azores, and he has been forced onto a more westerly course instead of being helped by the northerlies which usually blow off the coasts of northwest Spain and Portugal.

Waxwing is a well-proven veteran of world voyaging. Twenty years ago, Peter and Susan Gray of Dun Laoghaire were in the midst of a classic global circulation with this rugged little ship, in a venture which took them to many islands. This latest challenge by Peter Lawless is something completely different - more details here

Peter Lawless is facing an eight months solo sailing challengePeter Lawless is facing an eight months solo sailing challenge

Listen to Peter Lawless's recent podcast with Afloat's Tom MacSweeney here

Published in Solo Sailing

Peter Lawless hasn't time for anxiety as he makes final preparations for his solo sail around the world.

He has set Saturday, August 21, for his departure from Kilrush Marina in the Shannon Estuary.

Amongst those giving support to Peter is Cork-based artist Siobhan Fleming who says she was fascinated by his story of how he grew up sailing and describes herself as "artist not in residence" on his journey. She plans to create a series of art pieces in response to Peter's experiences, which he will be detailing via satellite phone and internet for supporters following his voyage.

The first piece, titled "And That Is Why We Go" reflects the journey into the unknown that Peter is taking.

This is the prize of a draw on Peter's website (peterlawlesssolocircumnavigation.com) that will be made on the evening before he leaves, Friday, August 20.

I last talked to 53-year-old Peter in June. He comes from a family of sailors, son of the late Pat Lawless from Limerick. The Golden Globe Race has been focused on by his brother, Pat.

Lawless estimates the trip will take approximately eight months nonstop. His yacht Waxwing is a Rival 41, she is a standard production offshore cruising yacht that he has upgraded for the challenge.Lawless estimates the trip will take approximately eight months nonstop. His yacht Waxwing is a Rival 41, she is a standard production offshore cruising yacht that he has upgraded for the challenge

At that stage, Peter worked hard to prepare his 41ft. yacht Waxwing for the voyage, which he is expecting to take about eight months. He is hoping to become the first Irishman to sail non-stop around the world and, since our last chat, has been putting in long days of preparation, determined to get everything right before leaving, which, he says, " will make life at sea that bit easier."

Lawless at Kilrush Marina in the Shannon EstuaryLawless at Kilrush Marina in the Shannon Estuary

He is my Podcast guest this week.

Published in Tom MacSweeney
Tagged under

The Irish Whale and Dolphin Group (IWDG) is backing Limerick sailor Peter Lawlesspending solo, non-stop round-the-world voyage on his Rival 41 yacht Waxwing.

While the charity has sponsored the yacht’s passive self-steering equipment, in return Peter — son of the late solo circumnavigator Pat Lawless — will be testing out the IWDG’s new reporting app for marine wildlife sightings.

As previously reported on Afloat.ie, sightings and strandings can be reported on the new app by scientists, researchers, boat operators, wildlife enthusiasts and whale-watchers alike.

And Peter — who sets off from Kilrush on 21 August — aims to take the app into the unknown, potentially recoding sightings and even video updated from parts of the ocean that may have never been visited before.

The IWDG’s chief Simon Berrow recently caught up with Peter on Waxwing as he makes his final preparations for his remarkable unassisted voyage:

Published in Solo Sailing

A second son of the late solo circumnavigator Pat Lawless from Limerick has announced plans to follow in his father's wake and sail solo around the world.

Peter and his brother Pat, both based in County Kerry, are embarking on separate solo circumnavigation over the next two years emulating the world-girdling exploits of their father in 1997.

It's a feat that could see the siblings achieve the feat of being the first Irish sailors to complete a solo non-stop circumnavigations of the world.

Peter Lawless - solo voyage

Peter (52) will begin an eight-month voyage in August 2021, such timing that will mean he will be should be home before his older brother Pat departs for France and the start of the 2022 Golden Globe Race in September 2022.

In August Peter, who lives in Annascaul near Dingle, plans to sail solo, non-stop, unassisted around the world from Ireland back to Ireland via the five great capes, using a sextant and paper charts as his primary navigation tools.

Peter estimates the trip will take him approximately eight month's non-stop in the Rival 41, Waxwing, a standard production offshore cruising yacht that upgraded for the challenge. Check out his video below.

Peter Lawless on his Rival 41, WaxwingPeter Lawless on his Rival 41, Waxwing

As regular Afloat readers will recall, this will be the second circumnavigation for Waxwing. It was the boat used by Peter and Susan Gray two sailing adventurers of the Royal St George Yacht Club in Dun Laoghaire who completed an eight-year trip around the world in the yacht in 2003.

Pat Lawless - Golden Globe 2022 Race entrant

As Afloat previously reported, Pat (66), from Ballyferriter, will be following Dublin sailor Gregor McGuckin, a competitor in the 2018 Golden Globe race, when he crosses the line of the 2022 race.

He aims to finish what McGuckin started in the 50th anniversary of the Golden Globe Race and become the first Irishman to complete a non-stop, unassisted solo circumnavigation of the world. 

Pat revealed the depths of his ambition when he told Afloat over the Christmas "I would not sail solo nonstop around the World, unless it was a race, that I had a fair hope of winning".

He says he is 'delighted' with his Saltram Saga 36, a 'safe and fast' boat, currently on the hard in Dingle Harbour, County Kerry.

Saltram Saga 36Pat Lawless's Saltram Saga 36 is craned out at Dingle Harbour in County Kerry. A lot of work done has been done to prepare the boat for the 20202 Golden Globe Race, but there is plenty left to do, says the Kerry skipper

Over the last six decades, Pat has amassed around 150,000km on the water between sailing and fishing. In the build-up to the GGR, Lawless is planning a voyage to Iceland this summer. 

"I will sail to the island of Jan Mayen in the Arctic next year, Going around Iceland on the way. Been over 25 years since I sailed there" he told Afloat.

"Hopefully, if COVID-19 permits I will sail around Ireland also, stopping in many ports," he adds.

Published in Solo Sailing

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020