Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Rib

#rib – The first ever Dublin Bay RIB raid to Wicklow  has been hailed a great success with plans afoot for more Raids writes Ronan Beirne.

Proceedings commenced on Sunday with a RNLI jife jacket check by the RNLI at the National Yacht Club in Dun Laoghaire.

After a course and safety briefing at 11.30 we set off - seven ribs and a Benneteau motor vessel.

With the ebb and c 20 knots of wind we set off on a course outside the Dublin Bay racing marks and outside the Muglins. A bit of a chop off Bray Head.

Greystones Marina allocated a handy berth for us near the steps. While the Greystones Gourmet event was happening in the main street most settled for ice cream and chips on the sea front. One rib came up from Wicklow to join the raid.

Set off for Dun Laoghaire before three and through Dalkey Sound and to Dun Laoghaire Harbour where we were met by the Lifeboat who escorted us back in for prize giving.

nycribraiders2

The National Yacht Club Ribbers return to base in Dun Laoghaire after a 12-mile run to Greystones. Photo: Michael Chester. More photos below.

Jimmy Kinahan's crew on the Zodiac won a big RNLI flag for the best dressed" Muglins Pirates".

Liam Shanahan's Red Bay a Lifeboat pennant for the rib with the most flags.

Sorcha Prouvier on the Antares the best dressed "scarey" pirate.

A great day was enjoyed by all and over €200 in the box for the Lifeboat.

Plans now in place for another Rib Raid adventure.

Published in RIBs
Tagged under

#RIB – The National Yacht Club is running Dublin Bay's first Rib Raid from Dun Laoghaire on the south side of the bay to the new harbour in Greystones in Co. Wicklow on Sunday 5th May.

The raid is in aid of the RNLI and it is open to all ribs & small motorcraft.

The plans are for the RIb fleet to assemble in the pool at the National Yacht Club at 10.00. There is a costume theme of Pirates of the Muglins plus a voluntary RNLI safety check and briefing.

There will be an 11.30 departure from Dun Laoghaire and plan for lunch at Greystones – ashore or onboard before heading home and a BBQ at National Yacht Club.

There are prizes for the best dressed pirates, a navigation challenge.

Published in RIBs
Tagged under

#MCIB - A man who lost his arm when he fell overboard from his boat in Cork Harbour last summer could have avoided the accident if he had followed essential safety precautions, according to the official report into the incident. The full report is available to download below as a PDF document.

Owen Corkery of Carrigaline was the subject of a 'miracle rescue' on 9 June 2012 when he was thrown overboard from his RIB, which subsequently struck him several times after he entered the water near Haulbowline Island, causing serious injuries to his head, back and left arm.

As previously reported on Afloat.ie, the RNLI said Corkery was "incredibly lucky to have been spotted from the shore" by a man now known to be Paul Bryans, who had been looking through a telescope at Fort Camden in Crosshaven approximately a mile away from the site of the incident.

Bryans and colleague Dick Gibson immediately raised the alarm with the emergency services and Crosshaven RNLI respectively, and rescue crews were dispatched within minutes.

While the lifeboat volunteers took control of the wayward RIB, Corkery was quickly retrieved from the water by the crew of the Cork Harbour Pilot boat Sonia. They found him incoherent and bleeding heavily, and also noted that while he was wearing a working personal flotation device (PFD), he was not wearing warm clothes or shoes.

Corkery was transferred via ambulance to Cork University Hospital, where his left arm was later amputated just above the elbow due to the severity of his injuries.

According to the official report into the incident by the Marine Casualty Investigation Board (MCIB), the RIB was found to be undamaged but had no CE or other approval mark.

The kill cord on the boat's motor was also found to be malfunctioning, as the engine could be started whether or not it was attached, and did not shut off when removed.

The report states that Corkery - an experienced powerboat user who had not completed any recognised handling course - has since explained he was aware of the kill cord malfunction but continued to use the vessel.

He confirmed in the same interview with investigators that he was standing beside the helm of the RIB at the time of the incident, a position that "would have made him considerably more likely to be thrown from the vessel".

Investigators also found it likely that Corkery's lack of shoes would also have reduced his grip while standing on the floor of the RIB.

In its conclusions, the MCIB report - which is available to download below - emphasises that the kill cord is an "essential part of safety equipment for all open motorboats" that should always be used and checked regularly, and that the helm of any high-speed watercraft should always remain seated, even at low speeds.

It also recommends that all pleasure craft owners should complete a recognised powerboat handling course.

Published in MCIB

#MarineWildlife - Recent hijinks by a group of Irish surfers in 'shark-infested waters' off Donegal have been making the rounds online - but they're not all what they seem.

IrishCentral reports on the video, apparently posted by surfers from Rossnowlagh, which shows the group on a RIB pushing one of their own overboard into the path of an oncoming shark.

Yet despite their reactions, they were never in any danger, as the shark was one of Ireland's harmless giants - a basking shark - who clearly attempts to dodge the dinghy as it approaches.

Indeed, the shark may even have been in more danger from the surfers than they were from it, as the marine species is designated as protected under EU law, which makes it illegal to disturb or harass them.

As reported on Afloat.ie earlier this year, the UK's Shark Trust has published a code of conduct for anyone encountering basking sharks in British or Irish waters - and pushing someone overboard on top of one is definitely absent from the list.

Published in Marine Wildlife

#BOAT THEFT - A boat owned by the Garda Sub-Aqua Club worth €25,000 was last week stolen in broad daylight, as the Evening Herald reports.

Smooth criminals removed the Tornado RIB from its mooring at Coal Harbour in Dun Laoghaire and loaded onto a trailer on Friday afternoon.

The "brazen" theft went unnoticed till gardaí arrived at the mooring later that evening.

The top-of-the-range boat, used by the sub-aqua club for diving training, is fitted with VHF radios and specialist GPS equipment.

A source told the Herald that the thieves "were very calm and professional in how they removed the boat and left without being in any kind of panic."

The Evening Herald has more on the story HERE.

Published in News Update

#rnli – The annual family fun day was held on Ballycotton pier to raise funds for Ballycotton lifeboat yesterday on bank holiday Sunday afternoon. At 12:30 the lifeboat station received a call from a rib with engine failure east of Ballycotton lighthouse and requesting assistance. The lifeboat crew abandoned their posts on Ballycotton pier and proceeded to the all weather lifeboat moored in the harbour. The Ballycotton lifeboat, Austin Lidbury, proceeded east of the lighthouse and reached the rib with four persons on board. The pleasure craft was taken under tow to Ballycotton harbour, where they were closely observed by visitors on the pier attending the fundraising activities.

The afternoon was a hit with the many visitors being able to observe a live rescue. Among the afternoon's activities was "Rock the Boat" which took place at 3:00pm, with in excess of 100 people taking part to fulfil a condition of a sponsor who offered €100 if 100 people or more took part. A short video clip of this is available to view on the Ballycotton Lifeboat website www.ballycottonlifeboat.org. At 3:45pm the Waterford based Coast Guard helicopter did a fly-by over the pier. Conditions were not suitable to demonstrate a lift of a person from the Ballycotton lifeboat which was going through manoeuvres in Ballycotton Bay.

At 5pm the visitors moved from the pier to the village to continue the fundraising activities with a wet t-shirt competition in the Blackbird. The event rounded up a weekend of fundraising events for the Ballycotton RNLI lifeboat, which included a football competition on Thursday evening, a table quiz in the Schooner Bar on Friday and a family treasure hunt and Pitch "n" Putt competition on bank holiday Saturday. The organisers and volunteer crew appreciated the support they received during the long weekend of fundraising events from both sponsors and supporters.

Published in RNLI Lifeboats
Tagged under

#RIB – Do you want to get a front seat to watch the V70's in Galway? Do you have a Rigid Inlatable Boat (RIB) and want to launch in the City and be sure of a berth for it in the docks? Well, there's only one way to be certain of all these and that's to volunteer yourself and your RIB as a Marshall boat. RIBs must be 5.5 metres in length or bigger and volunteers would need to be available for Thursday 4th to Saturday 7th July.

Contact the On Water Manager at Let's Do It Global email [email protected] or telephone the Volvo Race Office 091539995. Or visit the website and fill in volunteer form and include your RIB details. 

Published in Ocean Race
Tagged under

#RIBs – One of Ireland's largest Rib and Inflatable Boat Service Centres is on the move.

With almost 20 years experience Inland Inflatable Service run by Ronan and Sinead Keys is moving to a new purpose built 8000 sq foot Rib Repair Centre in Collooney, Co Sligo.

The firm also stocks a large selection of new and used Yamaha and Honda outboard engines.

Published in RIBs
Tagged under

#MCIB - The Marine Casualty Investigation Board (MCIB) has called for better safety awareness among leisure boat users in its report into the deaths of two men off Helvick Head in Co Waterford in May 2010.

John O'Brien and Pat Esmonde were lost overboard from their small RIB on 23 May 2010, and their remains were recovered two days later. Post-mortems confirmed that both died by drowning.

The report does not conclude exactly how the incident occurred. But accounts from eyewitnesses who sighted the men in the minutes before state that neither was wearing a lifejacket, despite the legal requirement to do so - and despite O'Brien having no seafaring experience and Esmonde being unable to swim, as confirmed by their families.

The MCIB also noted that while there were two lifejackets aboard the vessel, they were for emergencies and not suitable for constant wear as per the requirements for the vessel class.

Other safety issues highlighted include the kill-cord on the engine, which was not being used, and the fact that the initial distress call was made by mobile phone and not VHF radio.

Though neither had any bearing on this specific incident, the MCIB warned in particular that mobile phone calls are closed in nature, whereas VHF distress calls can be heard and answered by any vessel in the vicinity.

The board recommends that the Minister for Transport "undertakes a highly visible information poster campaign on piers and launching areas relating to lifejackets, VHF radio and emergency contact details" and also reminds boaters of their legal obligations.

The full report is available to download as a PDF from the MCIB website HERE.

Published in MCIB

#RIBS–Antrim's Red Bay Boats are building a 16-metre RIB and the new model to the Red Bay range will have a number of commercial applications. The Northern Ireland boat firm is operating at full capacity with commercial orders this month, a tonic for these times, and the firm headed by Tom McLaughlin, will be exhibiting a full range at the UK Seaworks Boat Show in late May.

With the hull mold of the the new 16-metre craft completed, the first Redbay Stormforce 1650 is underway! The boat is going to be built as a Pilot Boat and will be used for demo's and will be on display at the upcoming boat shows.

pilotboatrib

The impressive 16m design is now under construction at Cushendall in County Antrim

The photos below show the first hull being laid with fibreglass. Beside the hull mold is the plug for the deck mold and the cabin mold which are still being made.

16mribconstruction

16mribcabin

Power for the monster hull is coming from twin Volvo Penta D9 500hp engines coupled to ZF gearboxes with shafts and rudders. It is clearly a boat that will interest port companies in this country and around the world.

Published in RIBs
Page 8 of 10

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020