Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Robin Knox Johnston

#solosailor – Today marks the 46th anniversary of Sir Robin Knox-Johnston's departure from Falmouth UK back in 1968 to become the first person to sail singlehanded non-stop around the world. Of the 9 starters in that Sunday Times Golden Globe Race, Robin and his 32ft ketch rigged yacht Suhaili were the sole finishers.

Six weeks after announcing a second Golden Globe race to mark the 50th anniversary of that remarkable feat, the race organisers have received 50 serious expressions of interest from sailors in17 countries – Australia, Austria, Bermuda, Brazil, Britain, Canada, France, Germany, India, Italy, New Zealand, Norway, South Africa, Spain, Sweden, USA and Russia.

"The response has been remarkable" says Don McIntyre, adding. "The concept for a retro race in long-keeled monohulls like Suhaili and sailing round the world with nothing more than the equipment that was available to Robin 5 decades ago, has obviously hit a chord with many people."

McIntyre has received a further 150 letters from people asking for more information. The Race is limited to 30 competitors and the first names will be published on August 1st. Entries close on 31st December 2015.

The 2018 Golden Globe Race is very simple. Depart Falmouth, England on 14th June 2018, sail solo, non-stop around the world via the five Great Capes and return to Falmouth. Entrants are restricted to using the same type of yachts and equipment that were available to Sir Robin in that first race. That means sailing without modern technology or benefit of satellite based navigation aids. Competitors must sail in production boats between 32ft and 36ft overall (9.75 – 10.97m) designed prior to 1988 with a traditional full-length keel with rudder attached to their trailing edge, similar in concept to Knox-Johnston's Suhaili.

Pre-Notice of Race
The Pre-Notice of Race has now been published and lists the 32-36ft long-keeled production boats approved for the race with the addition of Suhaili replicas known as 'ERIC' designs built in wood, steel or fibreglass. The course has also been amended to include additional 'gates' in the Canary Islands, Cape Verde Islands and Falkland Islands for competitors to drop off film, and a southern boundary of 47°S in the Southern Ocean has been set after Kerguelen Island to keep the fleet clear of icebergs.

In addition, prior to the Race, entrants are now required to sail for one day under jury rig made up of two spinnaker poles and an emergency rudder system, and carry all this equipment during the race.

While no digital or satellite technology is allowed, for safety reasons, competitors will be issued with a satellite phone, and tracking system through which they can send two 100 character text messages a day directly to the race organisers. All other communications have to be made via HF radio, just as Sir Robin Knox-Johnston used during the 1968/9 Sunday Times Golden Globe Race.

For further information go to www.goldengloberace.com

Published in Golden Globe Race

#routedurhum – It has been a dramatic night with 15 incidents across the classes, including a collision between an Ultime trimaran and a cargo ship, the air rescue of a sailor after his boat lost its keel and overturned, and a Multi50 sailor who is awaiting help after his float broke off.

Thomas Coville saw his hopes of winning the Route Du Rhum vanish during the first night of the trans-Atlantic race when he damaged his yacht in a collision with a cargo ship.

Competing in the Ultimate class, the skipper of Sodebo Ultime escaped uninjured but damaged the starboard float on his boat.

Coville, who won the 3,542-nautical mile (6,560-kilometer) leg between Saint-Malo and the French Caribbean island of Guadeloupe in 1998 in the monohull class, was among the favorites for this year's race.

Another French skipper, François Angoulvant, had to be rescued after his Class 40 Team Sabrosa lost its keel. Angoulvant was airlifted to Brest where he is in good condition, according to race organisers.

Loick Peyron was leading the field early Monday aboard Banque Populaire VII.

Clipper Race chairman and founder, Sir Robin Knox-Johnston, has sent his first blog since he started Transatlantic solo race, the Route du Rhum - Destination Guadeloupe yesterday at 1400 CET from Saint-Malo, France.

With winds of 30 knots plus and large seas reported overnight, Sir Robin sent this report from his Open 60, Grey Power, this morning.

A grey sea, overcast, light drizzle and a West South Wester'ly Force 5 greeted me at dawn this morning. I am currently 40 miles from Ushant and debating whether to take the inner side of the Traffic Separation zone. Currently making 6-7 knots. Could do more if I put up more sail but we'll stay like this for the time being, as the wind is still 20 plus knots and gusting higher, just had one of 29 knots and the sea very lumpy.

It's a long race, and no point in breaking things at the beginning. I made a very cautious start. My Clipper Race colleague Simon Johnston was with me until half an hour before when my Rhum class competitor Bob Escoffier sent his rib to take him ashore. He has been invaluable, as was fellow colleague Alex Dower.

I soon found myself surrounded by 40's most of yesterday evening, pushing hard. Those boats are quick, but when the forecast squalls of 40 knots arrived I would not have wanted to be in one. Fortunately I had decided to settle in on the first night, so already had 3 reefs in the main and the storm jib set, but the boat was still pushed hard over and even with the mainsail pushed right down its track, was crashing into the waves.

I saw a couple of Automatic Identification Scheme targets turn round, I think they were in the race, but it was a gear breaking situation if you did not think of the boat and try to get her comfortable. We came through without damage, except for the staysail sheets becoming amorous, and it took a dark, cold wet hour on the foredeck, often under water, sorting out the resulting snakes' honeymoon.

Now typing this on a jumping boat is far from easy, as the computer often skips a letter or inserts one you did not ask for.

I am wondering how the big multis are fairing and if everyone is alright. There was some mention on Channel 16 last night but it was in fast spoken French.

C'est tout pour le moment.

RKJ

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.