Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Scott Flanigan

#TeamRacing - It was a tough week in Michigan for Dan Gill, Richard Roberts and Scott Flanigan at the 10th annual Detroit Cup, which concluded yesterday (Sunday 27 August).

But the TCD team racing trio managed to stay above the bottom of the final standings, scoring a win against the Australian contingent headed by Will Boulden that took the petit final to secure third place.

Defending champions Harry Price, Murray Jones and Cameron Seagreen of DownUnder Racing had little trouble defending their title despite conditions that ranged from light and flunky to moderate over the four days of competition.

Australian Price is now the only two-time winner of the Detroit Cup, solidifying his team’s six position in the world match race rankings.

Published in Team Racing

#TeamRacing - Afloat’s Sailor of the Month for March is competing with his Trinity College teammates at the Detroit Cup in the USA this week.

Richard Roberts joins fellow TCD helmsmen Scott Flanigan and Dan Gill on the Plain Sailing team at the 10th anniversary of the Bayview Yacht Club team racing event, which starts tomorrow (Thursday 24 August) with the round robin portion.

Eight skippers and crews representing five nations will take part in the four-day competition that marks the second stage of the USA Grand Slam series, as Scuttlebutt Sailing News reports.

The fleet includes defending champion Harry Price and his DownUnder Racing team from Sydney, Australia, alongside Murray Jones and Cameron Seagreen – currently ranked sixth in the world team racing stakes.

Published in Team Racing

#wmrt – Held between the 10-14th of June in a wide range of conditions on the Solent. Day One saw probably the most consistent breeze, with day two and four cut short due to a lack of wind and day three experiencing too much.

Despite this, the race committee completed a full round robin along with semi finals and full decider matches for the top 6 teams.

This years Grade 2 regatta had the added bonus of being part of the World Match Racing Tour, with points awarded to the top 6 teams towards the overall world championship series.

Several Irish competitors were involved including Philip Bendon's team, who had a tough week.

The two regular Irish crew members aboard Mark Lees's GBR Match Racing- Howth's Scott Flanigan and Shane Diviney were joined this week by fellow club mate Eamonn Bourke in an almost all Irish team!

After a slow start to the event, Lees's team sailed an almost flawless day two and three losing only to Ian Williams (Team GAC Pindar) to finish the round robin tied for 3rd place. This form was continued in the semi final against Williams were they lost 3-2, having taken it to the full 5 matches following the only defeats experienced by the 5 time and reigning World Champion.

Williams went on to win the final 2-0 against the promising Redline Racing team from Perth skippered by Matthew Jerwood.

Another Top 4 finish at the Royal Southern continues a string of good results for the GBR match racing team having also placed 2nd at last weeks Grade two in Helsinki, as they build towards a tour card spot on the World Match Racing Tour. They currently lie 10th on the overall standings, with Jerwood's team the current leaders.

Published in Match Racing

#wmrt – The World Match Racing Tour sees a new expanded schedule for the 2015/16 Season. The tour now consists of two levels of competition. Along with the usual 7 World Championship events the tour now includes a number of smaller competitions which are scored at half points but count towards the overall World Match Racing Tour Standings. Howth sailors Shane Diviney and Scott Flanigan have been competing in the first three regattas of the 2015/16 World Match Racing Tour season. It's another Irish dimension the tour that already sees Cork Match Racer Philip Bendon contest World Match Racing Tour on the Hamble.
Having narrowly missed out on selection for a tour card Diviney and the 36 Below Racing Team, with skipper Chris Steele of New Zealand headed to Long Beach California to compete in the Ficker Cup in early May. The event was a qualifier for the prestigious Congressional Cup to be held the following week. With the top two teams from the Ficker Cup qualifying for the Congressional Cup the objective was clear. The eight teams completed a double round robin in the fleet of evenly matched Catalina 37's. After two days of racing 36 Below Racing came out on top of the qualifying series only losing 2 of their 14 matches. They went on to win their semi-final 2-0. With a berth in the Final awaiting the team were relieved to be assured at least a top two finish and an entry to the Congressional Cup. The final saw the team come up against the local favourite Dustin Durant and his Long Beach Match Racing Team. Their experience in the Catalina 37's was not enough to overcome Steele and his 36 Below Racing team and they went on the win the finals 2-0 and take the Ficker Cup.
The Congressional Cup saw a big step up in the level of competition with most of the World's Top Match racers in attendance, including current World champion Ian Williams and defending Congressional Cup champion, Taylor Canfield. Racing was held just off the end of Long Beach Pier which attracted a big crowd of spectators each day. 36 Below Racing had a strong start to the regatta winning 4 from 5 on the first day of racing. They went on the finish the round robin in 6th position with a record of 6-5 which guaranteed them a spot in the quarter finals. The team came up against fellow Kiwi Phil Robertson in the quarterfinal. Phil sailed three perfect races to take the series 3-0. Although disappointed not to make the semi-finals the team were pleased with their performance in a competitive field. The event was eventually won by Taylor Canfield who beat Robertson 2-1 in a close final.
The World Match Racing Tour then moved to Langenargen, Germany with Scott Flanigan and Shane Diviney joining Mark Lees and his team from the U.K who received a wild card entry to the event. The regatta is known for its light and shifty race course making it extremely challenging to get the heavy Bavaria 40's around the course. The team made an impressive start to their first World Match Racing Tour event with a strong showing in the round robin with a score of 6-5. This left them in 6th place and gave them a spot in the quarter finals. They came up against the very experienced team of Eric Monin and his crew from Switzerland. Monin's experience prevailed as he did a better job of keeping the boat moving around the very light race track to take the series 3-0 in front of a spectator packed lake front. He went on to take second place at the regatta. The team were satisfied with their showing and finished a very credible 6th place.
It is only the beginning of a very busy season for both teams as they prepare to compete in a number of international regattas over the coming months.

Published in Howth YC

#matchrace – London Olympic sailor Scott Flanigan of Howth Yacht Club was sailing with the Great British Match Racing Team again at the weekend and won the Scarlino Grade 3 match race event, beating world number 17 Tomislav Basic in the final race to take the event.

The win will see the team boosted into the Top 20 in the world rankings for the first time.

Flanigan is sailing with Mark Lees, Matt Haslam and James Hemmingway for the remainder of the season as they target a place on the World Match racing tour for the 2016/17 season.

The event took place in Club Nautico Scarlino, Italy and marked the start of the European match racing circuit. There was 9 teams from 5 nations competing.

A full round robin was completed in extremely wet and variable conditions over two days. Mark Lees' team won 7 of their 8 races, only dropping a race when their spinnaker halyard snapped. The final race against top seed Tomislav Basic from Croatia was the decider, with the GBR match racing team leaving their best sailing till last.

Cork's Philip Bendon was also competing in Antibes, France in another Grade 3 where he finished fourth.

Both teams will be vying for European places at the Nations Cup qualifier in Howth in early May, with the Grand Finals being held in Russia in July.

Team positions:

Mark Lees : Helm
Scott Flanigan: Mainsheet trimmer & tactician
Matt Haslam: Trimmer
James Hemmingway: Bowman

Published in Match Racing

#croatiasailing – Malahide reader Scott Flanigan, the 2012 Olympic sailing team member, has written to advise of an opportunity for young sailors who would like to work as a skipper in Croatia this summer.

The 'Yacht Week' is a sailing event in Croatia, Greece and Italy that brings young people from all over the world to sail together in flotillas of 50 boats. The guests are 20-30 years old and every week is a mix of sailing, concerts, dinners and parties.

'It was something I took part in over the New Year Break in the Caribbean' and I think it is a great opportunity for Irish sailors'  Flanigan told Afloat.ie

The 'Yacht Week' is currently recruiting skippers for the summer to work professionally on 40-55ft sail yachts. All expenses during the week are paid for as well as a minimum salary of €350/week (plus tips!) says Flanigan. They offer up to 12 weeks of work during the season.

Requirements are to hold a basic navigational certificate (Level 4 or Day skipper are sufficient) and a VHF license. You also need to be an experienced sailor. Keelboat experience is not necessary since you will learn all you need to become a skipper during a weeks skipper course in Croatia.

Please contact [email protected] for more information using the reference code: IRL1.

Also check out www.theyachtweek.com and www.skipperacademy.com

Published in Jobs

#WORRALL THOMPSON - Celebrity chef Anthony Worrall Thompson - in Dublin at the weekend for a fundraiser for Olympic hopefuls Ger Owens and Scott Flanigan - has credited his Irish wife with being the "rock" that kept him going through his recent shoplifing controversy.

"She is absolutely amazing," he told the Irish Independent of his Dublin-born wife Jacinta Shiel. "We met nearly 20 years ago. She's gorgeous, she's got a great heart and she's my rock."

Worrall Thompson was at Malahide Rugby Club on Saturday to judge a celebrity chef night in aid of the Olympic 470 duo's bid for a spot at the 2012 games, as previously reported on Afloat.ie.

He kept his promise to attend the event following last Monday's public apology for his "stupid and irresponsible actions" after he was caught shoplifting cheese and wine from a Tesco store.

Worrall Thompson also donated his appearance fee from RTÉ's Saturday Night Show to Owens and Flanigan, who require sponsorship to supplement their support their funding from the Irish Saling Association.

Published in Olympics 2012

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020