Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: river barrow

Kilkenny Live reports that Graiguenamanagh Canoe Club has lodged plans to construct an accessible floating pontoon and disabled kayak launch at The Quay on the River Barrow.

The application can be viewed on the Kilkenny County Council website and a decision is due in the new year by 24 January 2024.

Published in Kayaking
Tagged under

Athy Community Enterprise Company (CLG) is seeking Expressions of Interest (EOI) from suitably qualified and experienced companies or individuals to operate its successful Athy Boat Tours

The boat tours operate on the River Barrow/Grand Canal from Athy town centre.

For information pack, please contact Brian O’Gorman email at [email protected] with ‘Athy Boat Tours’ in the subject line.

The closing date for receipt of completed applications is 12noon on Friday, 11th November 2022.

Published in Inland Waterways
Tagged under

A teenage boy said he “had no choice but to jump in” and rescue a mother and daughter from drowning in the River Barrow in Carlow at the weekend.

As RTÉ News reports, Miley Doran (17) told how he saw Stacey Foley jump into the water after her 13-year-old daughter Sophie Foley-Smith was caught by a sudden current.

“When I saw them drowning, I had to do the right thing,” he told RTÉ’s News at One today (Wednesday 2 June).

Ann Langton, Stacey’s mother, praised the young man from the Traveller community for his selfless actions and called for him to be honoured with a National Bravery Award.

The Irish Examiner has more on the story HERE.

Published in Rescue
Tagged under

A Co Laois barge hire company is seeking tenders to build a new passenger vessel for use on the inland waterways.

Barrowline Cruisers in Vicarstown wants to commission and fit out a 46ft passenger barge or boat with a capacity of 36 passengers plus crew, and with a galley snack bar and toilets on board.

“The barge will ply the Grand Canal/River Barrow and the waterways of Ireland,” the company states. “It will do passenger trips and private functions. All fittings to be of a high standard.”

The firm estimates a seven-month build time for the project, which is subject to grant funding.

For more details on the tender, which is open for submissions until 5pm on Friday 9 April, see the eTenders website HERE.

Published in Inland Waterways

Inland Fisheries Ireland (IFI) recently secured two separate convictions for illegal netting of salmon on the Barrow and Nore rivers respectively.

At a sitting of Kilkenny District Court on Tuesday 23 February 2021, Richie Lennon of New Ross, Co Wexford was fined €300 together with a €500 contribution towards costs following a prosecution taken by IFI.

Lennon pleaded guilty to the offences of illegal netting, the possession/control of four salmon and the refusal to give the name and address of another person when lawfully demanded.

The breaches of fisheries legislation occurred on 22 July 2020 on the River Barrow near Bauck in Co Carlow.

IFI fisheries officers outlined the facts of the case to the court and how Lennon had been observed in the act of illegal netting on the River Barrow, attempting to capture salmon.

Evidence in relation to the offence was given before Judge Carthy. Following the conviction, details of a previous prosecution against Lennon which had been dealt with at Wexford District Court on 15 April 2014 when the Probation Act had been applied was identified.

Judge Carthy made it clear to Lennon that if he appears in court again on similar offences, she will consider a prison sentence.

‘On the River Barrow and the River Nore, salmon stocks are well below their conservation limit and require protection’

On the same day in Kilkenny District Court, Michael Hynes of Ballybeg, Co Waterford was fined €300 together with a €500 contribution after he pleaded guilty to the offences of illegal netting, the possession of seven salmon and the refusal to give the name and address of another person when lawfully demanded.

The breaches of fisheries legislation here occurred on 22 June 2020 on the River Nore, in the townland of Clonamery, Co Kilkenny.

Evidence in relation to the offence was given before Judge Carthy sitting at Kilkenny District Court. IFI officers outlined the facts of the case to the court that Mr Hynes was apprehended and found to be in possession of seven dead salmon in his vehicle.

Lynda Connor, director of the South Eastern River Basin District at IFI, said: “I would like to commend the fisheries officers’ efforts and continuous commitment to protecting salmon.

“On the River Barrow and the River Nore, salmon stocks are well below their conservation limit and require protection. This type of illegal activity can have devastating effects on future stocks of salmon.

“These two convictions highlight the ongoing issue of illegal netting for salmon and IFI’s zero tolerance of this serious misconduct.”

Published in Angling

RTÉ News and TheJournal.ie report that a body was recovered yesterday, Saturday 6 March, in the search for a kayaker missing on the River Barrow in Athy since last weekend.

As previously reported on Afloat.ie, Declan Reid (34) and his eight-year-old son entered the water when their kayak capsized near Ardreigh Lock last Sunday afternoon (28 February).

While the boy was rescued by a passer-by, Reid disappeared — which prompted a multi-agency search operation throughout the week.

Published in Kayaking

Emergency services resumed searching today (Tuesday 2 March) for a man who went missing after his kayak capsized on the River Barrow at the weekend.

According to RTÉ News, 34-year-old Declan Reid had been kayaking with his young son when the vessel overturned near Ardreigh Lock in Athy, Co Kildare on Sunday afternoon (28 February).

Independent.ie reports that Reid — who is set to be a father again in early summer — valiantly kept the eight-year-old boy afloat until he was rescued by a passer-by.

It’s also understood that Reid’s family live in the old lock-keeper’s cottage close to the scene.

Local Labour Party senator Mark Wall told TheJournal.ie: “Everyone in the town is very upset. Athy is and always has been a very close knit community … It has hit the town so hard.”

Published in Kayaking

The start date for works on the proposed Barrow Blueway has been announced by Kildare County Council in conjunction with Laois County Council and Waterways Ireland.

When complete, the scheme will provide a multi-activity 46km off-road, flat and accessible public space and leisure route along the inland waterway – together with approved paddling trails for on water access – running from Lowtown in Kildare, through the towns of Rathangan, Monasterevin, Vicarstown, to Athy.

The proposed upgrade will improve access to the beautiful Barrow Way, both on and along the water, offering an enhanced experience to walkers, cyclists, wheelchairs users, paddlers and families.

Works are to commence on Wednesday 15 July at Milltown Bridge, some 3km north of Athy, with localised closures to facilitate the upgrade of the towpath. The duration of works this year will be around 16–18 weeks.

The works will be carried out in accordance with all environmental and planning conditions and under the oversight of an ecological clerk of works, to ensure any potential negative environmental impacts are avoided and ecological mitigation is implemented in accordance with legislation and best practice.

What’s being touted as a “top tourist attraction” is due to be complete early 2022 and “will not only offer a huge economic boost, positively influencing economic growth opportunities, it will also increase that sense of community, create exciting opportunities for both recreation and ways to experience many of the community's interesting places from new perspectives”, according to the project partners.

Kildare County Council will keep the public updated as works progress on the blueway scheme, which is funded by the Government of Ireland under Project Ireland 2040.

Published in Inland Waterways

Proposals for a new blueway along the River Barrow have been blocked by planners who objected to the scheme for a hard surface along the 115km of towpath.

But as The Irish Times reports, many locals and users of the waterway believe what the Barrow and the communities along its reach really need are better promotion.

Earlier this month, An Bord Pleanála rejected plans long in the offing for the Barrow Blueway, a new cycling and walking path between Lowtown in Co Kildare and St Mullins in Co Carlow.

Hundreds of Barrow locals had their say at public meetings, with campaigners against the path plans — among them broadcaster Olivia O’Leary — citing the existing grassy surface as more than suitable for walkers.

Others saw the blueway as “a fantastic opportunity” to save business such as pubs which have been closing at a rapid rate in rural areas, and raised the question of boggy or overgrown stretches that are a deterrent to visitors.

But others still argue that with proper maintenance and a weight of a promotional campaign behind it, the existing path would prove a major tourism attraction both domestically and abroad.

“I have people coming from the States, Canada, Australia, Europe, UK and they are just flabbergasted at how incredibly gorgeous it is, and they can’t believe there is nobody on it,” said local canoe tour operator Charlie Horan.

Those sentiments are shared by environmental journalist Lenny Antonelli, who tweeted that the Barrow is “already walkable, paddle-able and often cycle-able too.

“The Barrow doesn't need a greenway, but it does need better marketing and promotion, particularly within Ireland, and better facilitates for visitors. Imagine if all its derelict lock cottages became bothies for example?”

The Irish Times has more on the story HERE.

Published in Inland Waterways

#InlandWaterways - The scale of the New Ross bypass project for the layperson is as dizzying as its bridge over the River Barrow is going to be high.

For starters, the Killkenny People writes the scheme is 26 years in the making - from its humble beginnings in Kilkenny and Wexford County Development Plans in 1993 and 1994 for an additional river crossing around New Ross.

So to begin with, getting the project over the line took decades in terms of route selection, bridge options, an oral hearing, scheme approval, design, Compulsory Purchase Orders, tendering and all that an infrastructural development of this size entails.

Then there’s the task constructing 13.6km of dual carriageway which will boast Ireland’s longest bridge once it is completed.

For further reading on this impressive project, click here. 

Published in Inland Waterways
Page 1 of 3

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020