Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Port of Cherbourg

Brittany Ferries has given the go-ahead to a new rail-freight link connecting the Port of Cherbourg in Normandy and Bayonne in the Nouvelle Aquitaine region in south-western France.

The Breton based ferry company first announced the rail project back in February 2020, shortly before the COVID-19 health crisis hit, forcing a reduction in ferry services for nearly two years. But while the project—which Brittany Ferries deems strategic—was delayed, it was never cancelled.

During the pause, Brittany Ferries worked with French rail network operator SNCF Réseau and the Ministry for Ecological Transition to determine the routing for the new service, which will provide daily return journeys between Cherbourg and Mouguerre. Following a study into the modification of four railway tunnels on the Atlantic corridor route to allow the lowest available wagons to pass through, a framework agreement was signed, allowing the project to enter its concrete development phase.

With support from the French-state, Europe, and the regions of Normandie and Nouvelle Aquitaine, Brittany Ferries will open the ‘rail motorway’ linking the port of Cherbourg to the European Freight Centre at Mouguerre, near Bayonne, thereby connecting Spain to the UK and Ireland via the French railway network.

The launch of the new service, initially planned for 2022, is now expected by mid-2024.

Minimising transport’s environmental impact

To meet the needs of hauliers and logistics companies who wish to reduce harmful emissions and greenhouse gases, Brittany Ferries will diversify its freight offer, by offering a combined transport service for unaccompanied trailers along the French Atlantic Coast. The new link will form a natural extension of Brittany Ferries’ existing sea routes linking Cherbourg to Ireland and the UK, cutting the number of lorries transiting France by road by around 25,000 per year. Brittany Ferries will operate and sell the new service, effectively becoming a rail operator.

The next steps

Planning for rail movements using the French rail network is now underway.

The next phase will comprise the construction of two rail freight terminals in Cherbourg and Mouguerre, and the acquisition of wagons and specialised loading equipment for the Lohr Railway System which has been selected for the project.

Ports de Normandie, in its capacity as an investor, and the Port of Cherbourg in its capacity as a future operator, are also involved in planning for the next phase of the project. The first step is to organise a preliminary consultation with the residents of Cherbourg. The Normandy part of the project has received the support of Europe, the Normandy Regional Council, the Manche department, and the Communauté d’agglomération du Cotentin.

Brittany Ferries meanwhile will work closely with the Communauté d’agglomération du Pays Basque (CAPB) and the Nouvelle-Aquitaine region to carry out public consultation in Bayonne. The company has initiated discussions with the CAPB in order to acquire land for the Mouguerre rail freight terminal. In addition, a consortium comprising Mouguerre transport operators, the CAPB and Brittany Ferries has been formed to respond to a European Union call for proposals under the Connecting Europe Facility, which aims to develop new multimodal platforms.

Main characteristics of the ‘rail motorway’

  • A rail service with sea connections linking Poole, Portsmouth and Rosslare (Europort) to Cherbourg, allowing seamless transport of unaccompanied trailers from Ireland and UK to the Iberian Peninsula and vice versa.
  • A 970km rail journey replacing a 920km road journey
  • A regular year-round service, with one daily return journey, six to seven days per week, operated by two trains:
    • Each train is composed of 21 MODALOHR UIC wagons with double pockets, allowing 42 trailers to be transported. Trailers are rolled on and off using specialised horizontal handling equipment.
    • Parts of the route are not currently electrified. Initially the trains will be hauled by diesel locomotives, but in the future these could be replaced by dual-mode locomotives, further reducing emissions.
    • From 2024 trains will be routed via Saintes, then from 2026 via the Poitiers-Angoulême-Bordeaux mainline.
    • High service reliability and punctuality will foster customer loyalty.
    • Journeys have been timetabled to connect with ferry arrival and departure times, whilst also avoiding periods of peak road traffic in Cherbourg.

The southbound service will depart Cherbourg at 19:15, arriving in Bayonne/Mouguerre the following day at 11:00. The northbound service will depart Bayonne/Mouguerre at 19:26, arriving at Cherbourg the following day at 11:08.

The service will be available to customers of all Cherbourg ferry operators, as well as logistics companies based in the wider Cherbourg area.

Modalohr railway wagons for sustainable transport

Founded over 50 years ago, the Alsace-based LOHR group offers its customers transport systems that meet the needs of an increasingly environmentally-aware transport sector.

Modalohr wagons combined with fixed equipment at terminals allow rapid and secure loading and unloading of semitrailers. Since 2003 this French technology has allowed more than two million trucks to be shifted from European roads to railways, cutting carbon dioxide emissions by more than 2 million tonnes. Each time a semitrailer is transported over 1000km by rail instead of road, negative externalities such as accidents, noise, congestion and emissions are reduced by €800.

Published in Ferry
Irish Ferries cruiseferry Oscar Wilde docked this morning in Rosslare port and her arrival from Roscoff marked the last round trip of this year's high-season operated route, writes Jehan Ashmore.
This does not mean the end of French routes as the cruiseferry continues to maintain year-round sailngs to Cherbourg. The passage time on the Normandy route takes approximately 17 hours 30 minutes and compares favourably to the shorter Breton route that shaved sailing times by only an hour less. The company are currently running mini-cruises and wine hotel shopping breaks to Cherbourg.

The former Scandinavian cruiserferry was built in 1987 to serve on Color Line's Oslo-Kiel route as their Kronprins Harald. In 2007 she was sold to start French sailings and at 31,914grt, she is the largest cruiseferry to operate under Irish Ferries continental routes. Passenger capacity is just shy of 1,500 and cars total 730 in addiition space for around 90 freight vehicles. For a virtual tour of the cruiseferry's on board facilities and exterior deck views click HERE.

Winter sailings will run to the end of the year with a final departure on 30th December outbound and returning from France on 2nd January 2012. Thereafter there will be a no sailings as the cruiseferry is to undergo annual dry-docking before resuming sailings. The first sailing from Ireland is 19th February and the corresponding return sailing from France is 21st February. To keep up-to-date with sailing schedules click HERE.

Published in DBSC

Cork Harbour Information

It’s one of the largest natural harbours in the world – and those living near Cork Harbour insist that it’s also one of the most interesting.

This was the last port of call for the most famous liner in history, the Titanic, but it has been transformed into a centre for the chemical and pharmaceutical industry.

The harbour has been a working port and a strategic defensive hub for centuries, and it has been one of Ireland's major employment hubs since the early 1900s. Traditional heavy industries have waned since the late 20th century, with the likes of the closure of Irish Steel in Haulbowline and shipbuilding at Verolme. It still has major and strategic significance in energy generation, shipping and refining.

Giraffe wander along its shores, from which tens of thousands of men and women left Ireland, most of them never to return. The harbour is home to the oldest yacht club in the world, and to the Irish Navy. 

This deep waterway has also become a vital cog in the Irish economy.

‘Afloat.ie's Cork Harbour page’ is not a history page, nor is it a news focus. It’s simply an exploration of this famous waterway, its colour and its characters.

Cork Harbour Festival

Ocean to City – An Rás Mór and Cork Harbour Open Day formerly existed as two popular one-day events located at different points on Cork’s annual maritime calendar. Both event committees recognised the synergy between the two events and began to work together and share resources. In 2015, Cork Harbour Festival was launched. The festival was shaped on the open day principle, with Ocean to City – An Ras Mór as the flagship event.

Now in its sixth year, the festival has grown from strength to strength. Although the physical 2020 festival was cancelled due to Covid-19, the event normally features nine festival days starting on the first week of June. It is packed full of events; all made possible through collaboration with over 50 different event partners in Cork City, as well as 15 towns and villages along Cork Harbour. The programme grows year by year and highlights Ireland’s rich maritime heritage and culture as well as water and shore-based activities, with Ocean to City – An Rás Mór at the heart of the festival.

Taking place at the centre of Ireland’s maritime paradise, and at the gateway to Ireland’s Ancient East and the Wild Atlantic Way, Cork is perfectly positioned to deliver the largest and most engaging harbour festival in Ireland.

The Cork Harbour Festival Committee includes representatives from Cork City Council, Cork County Council, Port of Cork, UCC MaREI, RCYC, Cobh & Harbour Chamber and Meitheal Mara.

Marinas in Cork Harbour

There are six marinas in Cork Harbour. Three in Crosshaven, one in East Ferry, one in Monkstown Bay and a new facility is opening in 2020 at Cobh. Details below

Port of Cork City Marina

Location – Cork City
Contact – Harbour Masters Dept., Port of Cork Tel: +353 (0)21 4273125 or +353 (0)21 4530466 (out of office hours)

Royal Cork Yacht Club Marina

Location: Crosshaven, Co. Cork
Contact: +353 (0) 21 4831023

Crosshaven Boatyard Marina

Location: Crosshaven, Co. Cork
Contact: +353 (0)21 4831161

Salve Marina Ltd

Location: Crosshaven, Co. Cork
Contact: +353 (0) 21 4831145

Cork Harbour Marina

Location: Monkstown, Co. Cork
Contact: +353 (0)87 3669009

East Ferry Marina

Location: East Ferry, Co. Cork
Contact: +353 (0)21 4813390

New Cove Sailing Club Marina

(to be opened in 2020)

Location: Cobh, Co. Cork
Contact: 087 1178363

Cork Harbour pontoons, slipways and ramps

Cork City Boardwalk Existing pontoon

Port of Cork 100m. pontoon

Cork city – End of Cornmarket St. steps and slip;

Cork city - Proby’s Qy. Existing limited access slip

Quays Bar & Restaurant, Private pontoon and ramp for patrons, suitable for yachts, small craft town and amenities

Cobh harbour [camber] Slip and steps inside quay wall pontoon

Fota (zoo, house, gardens) Derelict pontoon and steps

Haulbowline naval basin; restricted space Naval base; restricted access;

Spike Island pier, steps; slip, pontoon and ramp

Monkstown wooden pier and steps;

Crosshaven town pier, with pontoon & steps

East Ferry Marlogue marina, Slip (Great Island side) visitors’ berths

East Ferry Existing pier and slip; restricted space East Ferry Inn (pub)
(Mainland side)

Blackrock pier and slips

Ballinacurra Quay walls (private)

Aghada pier and slip, pontoon & steps public transport links

Whitegate Slip

Passage West Pontoon

Glenbrook Cross-river ferry

Ringaskiddy Parking with slip and pontoon Ferry terminal; village 1km.

Carrigaloe pier and slip; restricted space; Cross-river ferry;

Fountainstown Slip

White’s Bay beach

Ringabella beach

Glanmire Bridge and tide restrictions

Old Glanmire - Quay