Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Van Oord

The UK's second largest port operator has welcomed a new energy efficient LNG dredger for the first time as it continues to improve the sustainability of its dredging work.

The Peel Ports Group has used Dutch marine contractor Van Oord’s groundbreaking Vox Apolonia for maintenance dredging of the Port of Liverpool and King George V Dock in Glasgow.

It is the first time the LNG trailing suction hopper dredger has been used at any of the group’s ports, and only the second time it has carried out work in the UK
.
The Vox Apolonia uses liquefied natural gas (LNG) and has a significantly lower carbon footprint than conventional trailing suction hopper dredgers. The use of LNG reduces nitrous oxide emissions by 90 per cent, as well as totally eliminating sulphur emissions.

Peel Ports Group – which is committed to being a net zero port operator by 2040 – first welcomed the vessel to the Port of Liverpool this month, before it carried out work in Glasgow, and returned for further work at its site in Liverpool.

At the same time, Van Oord also provided its new hybrid water-injection dredger Maas to the port, bunkered for the first time with a biofuel blend. The company estimates she currently emits 40 per cent less CO2e than her predecessor whilst dredging for the port group in Liverpool.

It comes as the firm supplied four separate vessels to carry out important dredging of the Liverpool channel and docks at the same time.

Garry Doyle, Group Harbour Master at Peel Ports Group, said; “We are always looking for ways to reduce our impact on the environment across our port estate. We are striving to become net zero across the group by 2040, and the Vox Apolonia is a step ahead in terms of its sustainability credentials.

“Maintenance dredging is vital to both support the functioning of our ports, and to provide a safe navigation for vessels passing through our waters.

“It’s important to us that we use methods that are as energy efficient as possible to do this work, and that’s why we chose the Vox Apolonia for this important project.”

Marine Bourgeois, Project Manager at Van Oord, said: “We're constantly researching and investing to bring our fleet to the next level in terms of sustainability. We have our own commitment to achieve net-zero emissions by 2050 and the Vox Apolonia is the next step towards that goal."

“It's been great to work with Peel Ports on this project. They are always open to collaborate in our initiatives to provide greener and more efficient dredging solutions. We are proud to bring our marine ingenuity in support of their goal to be net zero by 2040."

Maintenance dredging involves the removal of sediments that have built up in existing channels, berths, approaches, and associated swing basins. The work helps maintain a safe depth of water for vessels passing through its ports.

Published in Ports & Shipping

A Dutch marine contractor are about to begin work on a Capital Dredging campaign at Dublin Port in order to create two new riverside berths.

As disclosed by Dublin Port Company, the contractor Van Oord, reports DredgingToday, intends to carry out loading and dumping at sea of dredged material arising from capital dredging as part of the MP2 Project over the period October to December 2022.

The MP2 Project (website) is as Afloat reported is the second Strategic Infrastructure Development Project to be brought forward for planning from Dublin Port’s Masterplan 2040, reviewed 2018. An Bord Pleanála granted Planning Permission for the MP2 Project on 1st July 2020 (ABP-304888-19).

The areas to be dredged during the 2022 campaign all lie within Dublin Port and comprise the creation of the new Berth 52 and Berth 53, and localised widening of the navigation channel in the vicinity of the Poolbeg Oil Jetty.

The dredged material – consists of a mixture of clay, silt, sand, gravel and cobbles – will be disposed of at the existing licensed offshore disposal site located at the entrance to Dublin Bay to the west of the Burford Bank, (6.75 km from the lighthouse at the end of the Great South Wall).

Dredging will be carried out using a combination of a backhoe dredger and a trailer suction hopper dredger together with support vessels.

Published in Dredging

Cork Harbour Information

It’s one of the largest natural harbours in the world – and those living near Cork Harbour insist that it’s also one of the most interesting.

This was the last port of call for the most famous liner in history, the Titanic, but it has been transformed into a centre for the chemical and pharmaceutical industry.

The harbour has been a working port and a strategic defensive hub for centuries, and it has been one of Ireland's major employment hubs since the early 1900s. Traditional heavy industries have waned since the late 20th century, with the likes of the closure of Irish Steel in Haulbowline and shipbuilding at Verolme. It still has major and strategic significance in energy generation, shipping and refining.

Giraffe wander along its shores, from which tens of thousands of men and women left Ireland, most of them never to return. The harbour is home to the oldest yacht club in the world, and to the Irish Navy. 

This deep waterway has also become a vital cog in the Irish economy.

‘Afloat.ie's Cork Harbour page’ is not a history page, nor is it a news focus. It’s simply an exploration of this famous waterway, its colour and its characters.

Cork Harbour Festival

Ocean to City – An Rás Mór and Cork Harbour Open Day formerly existed as two popular one-day events located at different points on Cork’s annual maritime calendar. Both event committees recognised the synergy between the two events and began to work together and share resources. In 2015, Cork Harbour Festival was launched. The festival was shaped on the open day principle, with Ocean to City – An Ras Mór as the flagship event.

Now in its sixth year, the festival has grown from strength to strength. Although the physical 2020 festival was cancelled due to Covid-19, the event normally features nine festival days starting on the first week of June. It is packed full of events; all made possible through collaboration with over 50 different event partners in Cork City, as well as 15 towns and villages along Cork Harbour. The programme grows year by year and highlights Ireland’s rich maritime heritage and culture as well as water and shore-based activities, with Ocean to City – An Rás Mór at the heart of the festival.

Taking place at the centre of Ireland’s maritime paradise, and at the gateway to Ireland’s Ancient East and the Wild Atlantic Way, Cork is perfectly positioned to deliver the largest and most engaging harbour festival in Ireland.

The Cork Harbour Festival Committee includes representatives from Cork City Council, Cork County Council, Port of Cork, UCC MaREI, RCYC, Cobh & Harbour Chamber and Meitheal Mara.

Marinas in Cork Harbour

There are six marinas in Cork Harbour. Three in Crosshaven, one in East Ferry, one in Monkstown Bay and a new facility is opening in 2020 at Cobh. Details below

Port of Cork City Marina

Location – Cork City
Contact – Harbour Masters Dept., Port of Cork Tel: +353 (0)21 4273125 or +353 (0)21 4530466 (out of office hours)

Royal Cork Yacht Club Marina

Location: Crosshaven, Co. Cork
Contact: +353 (0) 21 4831023

Crosshaven Boatyard Marina

Location: Crosshaven, Co. Cork
Contact: +353 (0)21 4831161

Salve Marina Ltd

Location: Crosshaven, Co. Cork
Contact: +353 (0) 21 4831145

Cork Harbour Marina

Location: Monkstown, Co. Cork
Contact: +353 (0)87 3669009

East Ferry Marina

Location: East Ferry, Co. Cork
Contact: +353 (0)21 4813390

New Cove Sailing Club Marina

(to be opened in 2020)

Location: Cobh, Co. Cork
Contact: 087 1178363

Cork Harbour pontoons, slipways and ramps

Cork City Boardwalk Existing pontoon

Port of Cork 100m. pontoon

Cork city – End of Cornmarket St. steps and slip;

Cork city - Proby’s Qy. Existing limited access slip

Quays Bar & Restaurant, Private pontoon and ramp for patrons, suitable for yachts, small craft town and amenities

Cobh harbour [camber] Slip and steps inside quay wall pontoon

Fota (zoo, house, gardens) Derelict pontoon and steps

Haulbowline naval basin; restricted space Naval base; restricted access;

Spike Island pier, steps; slip, pontoon and ramp

Monkstown wooden pier and steps;

Crosshaven town pier, with pontoon & steps

East Ferry Marlogue marina, Slip (Great Island side) visitors’ berths

East Ferry Existing pier and slip; restricted space East Ferry Inn (pub)
(Mainland side)

Blackrock pier and slips

Ballinacurra Quay walls (private)

Aghada pier and slip, pontoon & steps public transport links

Whitegate Slip

Passage West Pontoon

Glenbrook Cross-river ferry

Ringaskiddy Parking with slip and pontoon Ferry terminal; village 1km.

Carrigaloe pier and slip; restricted space; Cross-river ferry;

Fountainstown Slip

White’s Bay beach

Ringabella beach

Glanmire Bridge and tide restrictions

Old Glanmire - Quay