Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: One & Only Visit

#FrenchDucVisit – On this date a quarter of a century ago, a Brittany Ferries ship made a once-only visit to Cork, a unique event in Irish ferry terms which was personally observed, writes Jehan Ashmore.

The 1500 passenger/350 vehicle ferry Duc de Normandie was seen sailing into Cork Harbour on 28 March 1992, having sailed overnight from Roscoff, Brittany. To add to the unique occasion the arrival of the business-like yet handsome looking ferry was noted when entering the neck of the lower harbour. This was noted from the elevated site of the former Fort Camden beyond Crosshaven.

The site now officially named Fort Meagher also affords views to its counterpart Fort Carlisle (Fort Davis) on the opposite side of the harbour. Further south along that side of the coast is the iconic landmark of Roches Point Lighthouse.

As an avid ferry enthusiast, the course of the Duc de Normandie was keenly traced as the former Dutch ferry (Prinses Beatrix) gently weaved further into the expanse of the natural harbour, yet a route that is dictated by the channel beneath. By the time the ferry was between Whitegate Oil Jetty and Spike Island, it was decided to depart this vantage point and head to Ringaskiddy Ferry Terminal.

Upon arrival in Ringaskiddy, the distinctive sound of 'live' Breton traditional musical was clearly heard within the grounds of the ferry terminal. Reasons as to why soon transpired as a wedding celebration was underway. It was nice to see such an occasion and how the seasonal ferry link gave an example in connecting Celtic traditions between the Irish and Bretons.

It should however be noted that this now historic visit by Duc de Normandie, which was made early into the seasonal service of 1992 had followed the opening sailing. This saw the deployment of a chartered but former Brittany Ferries ship, Cornouailles.

This would not be a conducive return to Cork of the ferry renamed Havelet of British Channel Island Ferries. Following a late arrival, Havelet set off on the return crossing to Roscoff but a freak wave struck the Norwegian custom-built ferry.

The incident caused a serious listing and damage on the vehicle decks. This led to the Havelet having to turn around and head back to Cork for repairs. Two days after the terminated sailing the ferry departed after repairs, however this caused a row with the Department of the Marine who claimed that enquires into the incident were not completed.

To replace Havelet on the Ireland-France service this led to this first and only visit of the Duc de Normandie, however it would be Quiberon that would take over the shoulder months that season. The Quiberon been no stranger to the continental route having entered service in 1982 on a route that was established almost four decades ago in 1978 by the Armorique.

As for the high-season summer months of 1992, they were carried out by the then flagship Bretagne. The first custom built 'cruiseferry' for Brittany Ferries entered service in 1989. She was designed to operate Spanish and English Channel routes in addition to serve the seasonal duties of the Irish route.

There have been other once-off callers from the Brittany Ferries fleet but they were deployed during the earlier years of the route. Asides Duc de Normandie, the most recent once-off caller was Bretagne albeit having served the route until 2004, the cruiseferry made a return visit to Cork two years later.

On that occasion, a trip was made to see the Bretagne make an arrival and departure in October 2006. The reason was that routine flagship, Pont-Aven was on charter for the Route du Rhum yacht event.

Pont-Aven as Afloat recently reported was deployed on St. Malo-Portsmouth duties in tandem with routine ship, Bretagne. The Cork-Roscoff regular, Pont-Aven is scheduled to resume the seassonal service this week.

The first sailing from France departs Roscoff on Friday, 31 March and the corresponding return sailing from Ireland departs on Saturday, 1 April. 

Published in Cork Harbour

About Dublin Port 

Dublin Port is Ireland’s largest and busiest port with approximately 17,000 vessel movements per year. As well as being the country’s largest port, Dublin Port has the highest rate of growth and, in the seven years to 2019, total cargo volumes grew by 36.1%.

The vision of Dublin Port Company is to have the required capacity to service the needs of its customers and the wider economy safely, efficiently and sustainably. Dublin Port will integrate with the City by enhancing the natural and built environments. The Port is being developed in line with Masterplan 2040.

Dublin Port Company is currently investing about €277 million on its Alexandra Basin Redevelopment (ABR), which is due to be complete by 2021. The redevelopment will improve the port's capacity for large ships by deepening and lengthening 3km of its 7km of berths. The ABR is part of a €1bn capital programme up to 2028, which will also include initial work on the Dublin Port’s MP2 Project - a major capital development project proposal for works within the existing port lands in the northeastern part of the port.

Dublin Port has also recently secured planning approval for the development of the next phase of its inland port near Dublin Airport. The latest stage of the inland port will include a site with the capacity to store more than 2,000 shipping containers and infrastructures such as an ESB substation, an office building and gantry crane.

Dublin Port Company recently submitted a planning application for a €320 million project that aims to provide significant additional capacity at the facility within the port in order to cope with increases in trade up to 2040. The scheme will see a new roll-on/roll-off jetty built to handle ferries of up to 240 metres in length, as well as the redevelopment of an oil berth into a deep-water container berth.

Dublin Port FAQ

Dublin was little more than a monastic settlement until the Norse invasion in the 8th and 9th centuries when they selected the Liffey Estuary as their point of entry to the country as it provided relatively easy access to the central plains of Ireland. Trading with England and Europe followed which required port facilities, so the development of Dublin Port is inextricably linked to the development of Dublin City, so it is fair to say the origins of the Port go back over one thousand years. As a result, the modern organisation Dublin Port has a long and remarkable history, dating back over 300 years from 1707.

The original Port of Dublin was situated upriver, a few miles from its current location near the modern Civic Offices at Wood Quay and close to Christchurch Cathedral. The Port remained close to that area until the new Custom House opened in the 1790s. In medieval times Dublin shipped cattle hides to Britain and the continent, and the returning ships carried wine, pottery and other goods.

510 acres. The modern Dublin Port is located either side of the River Liffey, out to its mouth. On the north side of the river, the central part (205 hectares or 510 acres) of the Port lies at the end of East Wall and North Wall, from Alexandra Quay.

Dublin Port Company is a State-owned commercial company responsible for operating and developing Dublin Port.

Dublin Port Company is a self-financing, and profitable private limited company wholly-owned by the State, whose business is to manage Dublin Port, Ireland's premier Port. Established as a corporate entity in 1997, Dublin Port Company is responsible for the management, control, operation and development of the Port.

Captain William Bligh (of Mutiny of the Bounty fame) was a visitor to Dublin in 1800, and his visit to the capital had a lasting effect on the Port. Bligh's study of the currents in Dublin Bay provided the basis for the construction of the North Wall. This undertaking led to the growth of Bull Island to its present size.

Yes. Dublin Port is the largest freight and passenger port in Ireland. It handles almost 50% of all trade in the Republic of Ireland.

All cargo handling activities being carried out by private sector companies operating in intensely competitive markets within the Port. Dublin Port Company provides world-class facilities, services, accommodation and lands in the harbour for ships, goods and passengers.

Eamonn O'Reilly is the Dublin Port Chief Executive.

Capt. Michael McKenna is the Dublin Port Harbour Master

In 2019, 1,949,229 people came through the Port.

In 2019, there were 158 cruise liner visits.

In 2019, 9.4 million gross tonnes of exports were handled by Dublin Port.

In 2019, there were 7,898 ship arrivals.

In 2019, there was a gross tonnage of 38.1 million.

In 2019, there were 559,506 tourist vehicles.

There were 98,897 lorries in 2019

Boats can navigate the River Liffey into Dublin by using the navigational guidelines. Find the guidelines on this page here.

VHF channel 12. Commercial vessels using Dublin Port or Dun Laoghaire Port typically have a qualified pilot or certified master with proven local knowledge on board. They "listen out" on VHF channel 12 when in Dublin Port's jurisdiction.

A Dublin Bay webcam showing the south of the Bay at Dun Laoghaire and a distant view of Dublin Port Shipping is here
Dublin Port is creating a distributed museum on its lands in Dublin City.
 A Liffey Tolka Project cycle and pedestrian way is the key to link the elements of this distributed museum together.  The distributed museum starts at the Diving Bell and, over the course of 6.3km, will give Dubliners a real sense of the City, the Port and the Bay.  For visitors, it will be a unique eye-opening stroll and vista through and alongside one of Europe’s busiest ports:  Diving Bell along Sir John Rogerson’s Quay over the Samuel Beckett Bridge, past the Scherzer Bridge and down the North Wall Quay campshire to Berth 18 - 1.2 km.   Liffey Tolka Project - Tree-lined pedestrian and cycle route between the River Liffey and the Tolka Estuary - 1.4 km with a 300-metre spur along Alexandra Road to The Pumphouse (to be completed by Q1 2021) and another 200 metres to The Flour Mill.   Tolka Estuary Greenway - Construction of Phase 1 (1.9 km) starts in December 2020 and will be completed by Spring 2022.  Phase 2 (1.3 km) will be delivered within the following five years.  The Pumphouse is a heritage zone being created as part of the Alexandra Basin Redevelopment Project.  The first phase of 1.6 acres will be completed in early 2021 and will include historical port equipment and buildings and a large open space for exhibitions and performances.  It will be expanded in a subsequent phase to incorporate the Victorian Graving Dock No. 1 which will be excavated and revealed. 
 The largest component of the distributed museum will be The Flour Mill.  This involves the redevelopment of the former Odlums Flour Mill on Alexandra Road based on a masterplan completed by Grafton Architects to provide a mix of port operational uses, a National Maritime Archive, two 300 seat performance venues, working and studio spaces for artists and exhibition spaces.   The Flour Mill will be developed in stages over the remaining twenty years of Masterplan 2040 alongside major port infrastructure projects.

Source: Dublin Port Company ©Afloat 2020.