Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: 'Europe' in service

Passengers, particularly Welsh rugby fans travelling by ‘foot’ for this Saturday’s match with Ireland, in Dublin, have got good news as the Stena Line owned port of Fishguard is to see their ferry back on the run after a five-and-a-half-week disruption in service.

The south Wales-Ireland route, formerly served until last year by the popular Stena Europe as Afloat referred earlier today, (see related Stena CEO story), will reports the Western Telegraph, travel but from the Irish port of Rosslare to Fishguard at 7.30pm (19.30hrs) this evening on the first crossing in more than a month as the St. Georges Channel ferry service resumes. (At the time of writing, Afloat can confirm the Stena Europe has departed Rosslare). 

Stena Europe is being used as a temporary vessel while Fishguard Port undergoes maintenance work to a linkspan berth. The work means that the Stena Nordica, which was announced a year ago as the ‘permanent’ ferry since its introduction in July last year, was operating between Fishguard and Rosslare is unable to berth in Fishguard at the moment.

The ropax ferry since January has been been put on the Dublin to Holyhead route while the work takes place, allowing also for that route’s secondary ferry, Stena Estrid to provide relief cover for the Belfast-Birkenhead E-flexer twins to go for annual overhaul dry-dockings.

The only one ferry that is able to berth at Fishguard in its current configuration is the Stena Europe, however the veteran vessel dating to 1981 had to go for repairs at Cammell Laird, Birkenhead, from where the ferry has been for the most part of these past weeks, then a stint afterwards at Liverpool Docks. Afloat had tracked the ferry relocate having crossed the Mersey with the assistance of a pair of tugs to enable berthing within the docks that would later include shifting to Canada Dock.

Now that the Stena Europe has returned to Fishguard after the long delay due to unforeseen mechanical issues, but Stena has confirmed that the ferry has taken over the route from today.

As previously reported, Stena Europe covered the Fishguard-Rosslare run for 21 years, until 13 July last year followed by a trip to A&P Falmouth that afterwards led to a short charter on the Strait of Gibraltar between Spain and Morocco.

“Stena Line can confirm that Stena Europe will enter service on the Rosslare-Fishguard route at 7.30pm on Tuesday, February 20,” said a company spokesperson. “We apologise for the delay to the resumption of this service, and we look forward to welcoming our customers onboard.”

More on the story here as the Stena Europe will also be a most welcome sight for ferry fans on both sides of the southern corridor route, though the ferry will be replaced again when Stena Nordica makes its presence with a night-sailing departing the Welsh port on St. David’s Day, 1st March.

Afloat however understands Stena Nordica is to be off-service again but on a temporary basis on the Rosslare-Cherbourg route joining the Stena Vision as the Ireland-France route's secondary ferry, ropax Stena Horizon is currently running Stena's new Dublin-Birkenhead 'freight' route but is scheduled to return to the continental service in April. 

Published in Stena Line

Dun Laoghaire Baths Renovation

Afloat has been reporting on the new plans for the publically owned Dun Laoghaire Baths site located at the back of the East Pier since 2011 when plans for its development first went on display by Dun Laoghaire Rathdown County Council. 

Foreshore consent was applied for in 2013.

Last used 30 years ago as the 'Rainbow Rapids' before falling into dereliction – the new site does not include a public pool.

The refurbished Dun Laoghaire Baths include the existing Baths Pavilion for use as artist workspaces, a gallery café and for the provision of public toilet facilities. 

Work finally got underway at Dún Laoghaire on the €9 million redevelopments of the old Dún Laoghaire Baths site in June 2018 under a contract with SIAC-Mantovani.

The works have removed dilapidated structures to the rear of the Pavilion to permit the creation of a new route and landscaping that will connect the walkway at Newtownsmith to both the East Pier and the Peoples Park. 

Original saltwater pools have been filled in and new enhanced facilities for swimming and greater access to the water’s edge by means of a short jetty have also been provided.

The works included the delivery of rock armour to protect the new buildings from storm damage especially during easterly gales. 

It hasn't all been plain sailing during the construction phase with plastic fibres used in construction washing into the sea in November 2018

Work continues on the project in Spring 2020 with the new pier structure clearly visible from the shoreline.

A plinth at the end of the pier will be used to mount a statue of Roger Casement, a former Sandycove resident and Irish nationalist.