Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Irene of Bridgwater

The tall ship that ran aground off Scotland yesterday has been refloated.
As previously reported on Afloat.ie, the 100-foot-long Irene of Bridgwater, with 10 people on board, became stuck in Lamlash Bay on its way to port at Greenock - one of five ports on the route of the 2011 Tall Ships Races.
A spokesperson for Clyde Coastguard told STV that the ship was refloated at 3.45am this morning.
"There were no injuries and no damage," she added.
The tall ship that ran aground off Scotland yesterday has been refloated.

As previously reported on Afloat.ie, the 100-foot-long Irene of Bridgwater, with 10 people on board, became stuck in Lamlash Bay on its way to port at Greenock - one of five ports on the route of the 2011 Tall Ships Races.

A spokesperson for Clyde Coastguard told STV that the ship was refloated at 3.45am this morning.

"There were no injuries and no damage," she added.
Published in Tall Ships
One of the vessels that departed last weekend's Tall Ships festival in Waterford and is heading for the next  race stage in Scotland has run aground off the island of Arran.

The 100ft-long tall ship Irene of Bridgwater, with 10 people on board, became stuck in Lamlash Bay on its way to port at Greenock.

Clyde Coastguard said the ship was expected to refloat at high tide in the early hours of this morning. There was no danger to anyone on board.

Greenock is hosting the second stage of the race, following Waterford, Ireland. BBC News has more HERE.


Published in Tall Ships

Dun Laoghaire Baths Renovation

Afloat has been reporting on the new plans for the publically owned Dun Laoghaire Baths site located at the back of the East Pier since 2011 when plans for its development first went on display by Dun Laoghaire Rathdown County Council. 

Foreshore consent was applied for in 2013.

Last used 30 years ago as the 'Rainbow Rapids' before falling into dereliction – the new site does not include a public pool.

The refurbished Dun Laoghaire Baths include the existing Baths Pavilion for use as artist workspaces, a gallery café and for the provision of public toilet facilities. 

Work finally got underway at Dún Laoghaire on the €9 million redevelopments of the old Dún Laoghaire Baths site in June 2018 under a contract with SIAC-Mantovani.

The works have removed dilapidated structures to the rear of the Pavilion to permit the creation of a new route and landscaping that will connect the walkway at Newtownsmith to both the East Pier and the Peoples Park. 

Original saltwater pools have been filled in and new enhanced facilities for swimming and greater access to the water’s edge by means of a short jetty have also been provided.

The works included the delivery of rock armour to protect the new buildings from storm damage especially during easterly gales. 

It hasn't all been plain sailing during the construction phase with plastic fibres used in construction washing into the sea in November 2018

Work continues on the project in Spring 2020 with the new pier structure clearly visible from the shoreline.

A plinth at the end of the pier will be used to mount a statue of Roger Casement, a former Sandycove resident and Irish nationalist.