Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Irish Language

Inland Fisheries Ireland (IFI) says it is now preparing a draft Irish Language Scheme for review by An Coimisinéir Teanga following a public consultation this past summer.

As previously reported on Afloat.ie, the initiative aims for accordance with Section 11 of the Official Languages Act 2003, which has the goal of ensuring better availability and a higher standard of public services through the Irish language.

IFI says one public submission (from Conradh na Gaeilge) was received during the six-week consultation process, which concluded on 6 July, and it has made that submission available to download in English and Irish.

Published in Angling

Inland Fisheries Ireland (IFI) proposes to draft a scheme in accordance with Section 11 of the Official Languages Act 2003, which aims to ensure better availability and a higher standard of public services through Irish.

The State agency with responsibility for the protection and conservation of freshwater fish and habitats now wishes to invite representations in relation to the preparation of the draft scheme from any interested parties.

Submissions should be addressed to [email protected]. Alternatively, they may be posted to: Irish Language Scheme Public Consultation, Inland Fisheries Ireland, 3044 Lake Drive, Citywest Business Campus, Dublin 24, D24 CK66.

Information in relation to the mandate and role/services provided to the public by IFI is available on www.fisheriesireland.ie.

The latest date for receipt of representations is Wednesday 6 July.

IFI asks those making submissions to hindly note that:

  1. Everyone who takes part in an IFI consultation will be notified of the final document emerging from the consultation process.
  2. The names of respondents and their submissions will be published on IFI’s website at the end of each consultation process (ie at the time the document arising from the consultation is published). Any further information relating to an identified or identifiable natural person (‘Personal data ‘as defined under Article 4 of GDPR) will be redacted prior to publication on the IFI website.
  3. IFI is subject to the provisions of the Freedom of Information Act 2014 and therefore has to consider any request made to it under that Act. IFI will provide advice as follows: ‘If you consider that any part of your submission would be subject to any of the statutory exclusions under that Act please so indicate in your submission, specifying under which exemption you believe the content should be excluded.’

All personal data that IFI may use is collected, processed and held in accordance with the provisions of EU Regulation 2016/679 General Data Protection Regulation (“GDPR”) and the Data Protection Act 2018.

A version of this notice in Irish is available on the IFI website HERE.

Published in Angling

Dun Laoghaire Baths Renovation

Afloat has been reporting on the new plans for the publically owned Dun Laoghaire Baths site located at the back of the East Pier since 2011 when plans for its development first went on display by Dun Laoghaire Rathdown County Council. 

Foreshore consent was applied for in 2013.

Last used 30 years ago as the 'Rainbow Rapids' before falling into dereliction – the new site does not include a public pool.

The refurbished Dun Laoghaire Baths include the existing Baths Pavilion for use as artist workspaces, a gallery café and for the provision of public toilet facilities. 

Work finally got underway at Dún Laoghaire on the €9 million redevelopments of the old Dún Laoghaire Baths site in June 2018 under a contract with SIAC-Mantovani.

The works have removed dilapidated structures to the rear of the Pavilion to permit the creation of a new route and landscaping that will connect the walkway at Newtownsmith to both the East Pier and the Peoples Park. 

Original saltwater pools have been filled in and new enhanced facilities for swimming and greater access to the water’s edge by means of a short jetty have also been provided.

The works included the delivery of rock armour to protect the new buildings from storm damage especially during easterly gales. 

It hasn't all been plain sailing during the construction phase with plastic fibres used in construction washing into the sea in November 2018

Work continues on the project in Spring 2020 with the new pier structure clearly visible from the shoreline.

A plinth at the end of the pier will be used to mount a statue of Roger Casement, a former Sandycove resident and Irish nationalist.