Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Cancellation

#Rowing: Athlone Regatta has been cancelled. The weather forecast for Saturday in the area was for strong winds with gusts. The regatta is in its 49th year and this is the third time it has been cancelled for weather reasons. All those cancellations have come in the last six years. The 2018 rowing season has been marked by a succession of cancellations. 

Published in Rowing

# ROWING: A decision will be made this afternoon on whether this weekend’s two big regattas at the National Rowing Centre will go ahead. The Skibbereen Regatta is fixed for Sunday and the Irish Universities and Schools’ Championships for Saturday, but both are in doubt because of the forecast of bad weather around the Co Cork venue.

Published in Rowing

The European Parliament and European Council have formally adopted a regulation giving new compensation rights to passengers using water transport. The regulation is expected to come into force at the end of 2012.

"People are entitled to enjoy the same levels of quality and safety wherever they travel within the European Union. I am very glad that after introducing rights for air and rail passengers, we are now also able to introduce similar rights for passengers travelling by water" said Siim Kallas, Commission Vice President and responsible for transport.

The new regulation that will enable passengers travelling by sea and by inland waterways to enjoy the same rights wherever they travel in the European Union. The information can be viewed in full from the Irish Maritime Development Office (IMDO) website: www.imdo.ie

Below is a list of the new Passenger Rights.

 

•guarantee of reimbursement or rerouting in situations of cancellation or of delay at departure of more than 90 minutes;

•adequate assistance (such as snacks, meals, refreshments and, where necessary, accommodation up to three nights, with a financial coverage up to €80 per night) in situations of cancellation or delay at departure of more than 90 minutes;

•compensation, between 25% and 50% of the ticket price, in situations of delay in arrival or cancellation of journeys;

•non-discriminatory treatment and specific assistance free of charge for disabled persons and persons with reduced mobility both at port terminals and on board ships, as well financial compensation for loss or damage of their mobility equipment;

•minimum rules on information for all passengers before and during their journey, as well as general information about their rights in terminals and on board ships;

•establishment by carriers and terminal operators of complaint handling mechanism available to passengers;

•establishment of independent national bodies for the enforcement of the regulation, through, where appropriate, the application of penalties.

In addition further detailed information about passenger rights in all modes of transport can be found HERE.

Published in Ports & Shipping

Galway Port & Harbour

Galway Bay is a large bay on the west coast of Ireland, between County Galway in the province of Connacht to the north and the Burren in County Clare in the province of Munster to the south. Galway city and port is located on the northeast side of the bay. The bay is about 50 kilometres (31 miles) long and from 10 kilometres (6.2 miles) to 30 kilometres (19 miles) in breadth.

The Aran Islands are to the west across the entrance and there are numerous small islands within the bay.

Galway Port FAQs

Galway was founded in the 13th century by the de Burgo family, and became an important seaport with sailing ships bearing wine imports and exports of fish, hides and wool.

Not as old as previously thought. Galway bay was once a series of lagoons, known as Loch Lurgan, plied by people in log canoes. Ancient tree stumps exposed by storms in 2010 have been dated back about 7,500 years.

It is about 660,000 tonnes as it is a tidal port.

Capt Brian Sheridan, who succeeded his late father, Capt Frank Sheridan

The dock gates open approximately two hours before high water and close at high water subject to ship movements on each tide.

The typical ship sizes are in the region of 4,000 to 6,000 tonnes

Turbines for about 14 wind projects have been imported in recent years, but the tonnage of these cargoes is light. A European industry report calculates that each turbine generates €10 million in locally generated revenue during construction and logistics/transport.

Yes, Iceland has selected Galway as European landing location for international telecommunications cables. Farice, a company wholly owned by the Icelandic Government, currently owns and operates two submarine cables linking Iceland to Northern Europe.

It is "very much a live project", Harbourmaster Capt Sheridan says, and the Port of Galway board is "awaiting the outcome of a Bord Pleanála determination", he says.

90% of the scrap steel is exported to Spain with the balance being shipped to Portugal. Since the pandemic, scrap steel is shipped to the Liverpool where it is either transhipped to larger ships bound for China.

It might look like silage, but in fact, its bales domestic and municipal waste, exported to Denmark where the waste is incinerated, and the heat is used in district heating of homes and schools. It is called RDF or Refuse Derived Fuel and has been exported out of Galway since 2013.

The new ferry is arriving at Galway Bay onboard the cargo ship SVENJA. The vessel is currently on passage to Belem, Brazil before making her way across the Atlantic to Galway.

Two Volvo round world races have selected Galway for the prestigious yacht race route. Some 10,000 people welcomed the boats in during its first stopover in 2009, when a festival was marked by stunning weather. It was also selected for the race finish in 2012. The Volvo has changed its name and is now known as the "Ocean Race". Capt Sheridan says that once port expansion and the re-urbanisation of the docklands is complete, the port will welcome the "ocean race, Clipper race, Tall Ships race, Small Ships Regatta and maybe the America's Cup right into the city centre...".

The pandemic was the reason why Seafest did not go ahead in Cork in 2020. Galway will welcome Seafest back after it calls to Waterford and Limerick, thus having been to all the Port cities.

© Afloat 2020