Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Dublin Array

The Department of Transport has been advised by Dublin Array that they will be conducting geophysical, geotechnical and environmental surveys for the Dublin Array offshore wind farm project.

Site investigation operations for the wind farm and the Expert Corridor Route (ECR) between the coast of Dublin and Wicklow will take place between Friday 19 April and the end of July, subject to weather and operational constraints.

The geophysical survey will be carried out by the vessel Fugro Helmert (callsign C6FT8). During these operations, the vessel will be towing equipment at a depth of up to five metres below the surface and extending some 300 metres astern.

The geotechnical survey will be carried out by the vessel M/V Flat Holm (callsign GHLZ) at fixed stations. The environmental survey will be carried out by the vessel Ros Áine (callsign EIZG5) in daytime hours only.

All vessels will be mobilised from Dun Laoghaire and will be restricted in their ability to manoeuvre, therefore all other mariners are advised to provide a wide berth and navigate with caution in the relevant area.

Coordinates and a map of the survey area, as well as contact details, can be found in Marine Notice No 18 of 2024, attached below.

Published in Power From the Sea

RWE Renewables Ireland has appointed Vanessa O’Connell as its new Development Project Director for the Dublin Array offshore wind farm.

Dublin Array is a proposed 824MW offshore wind farm, which will be located about 10 kilometres from the coast of counties Dublin and Wicklow.

Vanessa replaces Peter Lefroy, who has been leading the project since 2018, while also being the Offshore Development Head for Ireland. Peter will continue in his role as Offshore Development Head of RWE Ireland & UK West.

Vanessa brings more than 12 years of experience in leadership in the offshore wind sector to RWE. She has worked across all stages of offshore wind projects, encompassing development, construction, and operations, with involvement in nine offshore wind projects.

Vanessa spent over ten years at Ørsted, working on projects such as Hornsea 1 (1.2GW), Burbo Bank Extension (258MW), Walney Extension (659MW), and Barrow (90MW). On Hornsea 1, Vanessa held leadership positions in the commercial function, served on the construction leadership team, and assumed overall accountability for the asset during its transition to the operational phase.

Returning to Ireland over two years ago, Vanessa assumed the role as Head of Inis Offshore Wind. This independent offshore wind developer, backed by Temporis and the Ireland Strategic Investment Fund, focuses on early stage development in Ireland.

Vanessa holds an MSc in Environmental Technology from Imperial College London and a BA in Economics from Trinity College Dublin. She lives in Dun Laoghaire with her husband and two daughters.

Commenting on the appointment, RWE Director of Offshore Development UK & Ireland Danielle Lane said:

“I’m delighted that Vanessa has chosen to join RWE and Dublin Array. Her skills and experience in working in offshore wind will make a great contribution to the project at an important time. Dublin Array is a flagship project in the Irish offshore wind market and Vanessa is joining a strong, established team that will thrive under her leadership.”

Dublin Array

Dublin Array is a proposed offshore wind farm, which will be located on the Kish and Bray Banks, approximately 10km from the coastline of counties Dublin and Wicklow. It is being developed by RWE, one of the world’s leading developers of renewable energy, and Irish renewable energy firm Saorgus Energy. RWE is leading the development on behalf of the partnership.

Once operational, the project will deliver up to 824MW of clean, renewable electricity and will consist of up to 50 wind turbines. This is enough energy to supply around 770,000 homes and reduce Ireland’s annual carbon emissions by over 1.4m tonnes per year. The final decision on the number of turbines will be informed by ongoing surveys and detailed design work.

The Dublin Array project will also bring significant economic benefits during its construction and operation, with over 1,000 construction phase jobs and 80 direct and 160 indirect full-time jobs expected during the 30-year operational phase. Dublin Array’s operations base is expected to be located within Dún Laoghaire, resulting in an estimated €540 million in local expenditure across the Greater Dublin Area.

Dublin Array was awarded its Maritime Area Consent (MAC) in December 2022. A MAC is required for any proposed Irish offshore wind farm development to be able to seek planning permission. Subject to planning permission, the project could be operational by 2028.

Published in Power From the Sea
Tagged under

Kish Offshore Wind Ltd and Bray Offshore Wind Ltd will be conducting geotechnical investigations on the Dublin Array project site and associated export cable corridor off the coast of counties Dublin and Wicklow from later this month.

The geotechnical investigations will include 27 vibrocores which will be sampled at locations within the offshore wind farm site. Project works will commence on Saturday 29 April and continue through to late May, subject to weather and operational constraints.

Investigations will be conducted within the Kish lease area, Bray lease area and the expert cable corridor, all of which are off the coast of counties Dublin and Wicklow.

Operations will be conducted by the multipurpose vessel Voe Vanguard (callsign MBEN9). The vessel will be positioned at each of the investigation points for approximately two hours, which may extend in the event of inclement weather.

The vessel is supplied with a VHF multi-channel radio and mobile phone. It will be operating 24 hours a day during the survey works and will display relevant lights and shapes as required under COLREGS.

All other vessels operating within the planned area of survey are requested to keep their distance and give a wide berth wherever possible.

Contact details, a map and coordinates of the survey area can be found in Marine Notice No 24 of 2023, attached below.

Published in Power From the Sea

The Department of Transport has been advised by Kish Offshore Wind Ltd and Bray Offshore Wind Ltd that geotechnical investigations will be conducted on the Dublin Array offshore wind farm project site off the coast of counties Dublin and Wicklow.

The project works will commence next Saturday 1 April and continue through to late May 2023, subject to weather and operational constraints.

The geotechnical investigation will include approximately seven boreholes which will be drilled at locations within the project work site.

Operations will be conducted by the Dutch Pearl (callsign PBZP), a support vessel/tug, and the Excalibur (callsign YJKQ5), a jack-up barge.

The Excalibur will be positioned at each of the investigation points for several days which may extend in the event of inclement weather. The Dutch Pearl will be assisting the Excalibur in its daily operations and towing the barge between investigation points. The standby tug will be at anchor on the project site and will be conducting transits between the site and Dublin Port.

Both vessels will display the relevant light and shapes as required under COLREGS. Both vessels will keep continuous watch on VHF Channels 16 and 72. During operations, the vessels will be restricted in their ability to manoeuvre. All other vessels are requested to leave a wide berth during the operations.

Contact details, relevant coordinates and a map of the work area ca be found in Marine Notice No 16 of 2023, attached below.

Published in Power From the Sea

Marine Notices No 37 of 2021 and No 44 of 2021 advised of the deployment of two wave buoys and one floating LiDAR buoy at the Dublin Array offshore wind farm on the Bray and Kish Banks.

The two wave buoys were recovered from site in June 2022. Now the Department of Transport has now been advised by Partrac Ltd that the floating LiDAR buoy on Bray Bank is scheduled to be recovered in the period between Thursday 5 and Thursday 19 January 2023, subject to weather and operational constraints.

The floating LiDAR buoy at Latitude 53° 10.645’ N, Longitude 005° 55.785' W has a square footprint with an area of 4 sqm and height of around 4m above the water line. It is yellow in colour and has a St Andrew cross on top.

It also contains a yellow light which emits five flashes every 20 seconds and is visible for up to three nautical miles.

The vessel CT Barnston (callsign MUZU5) will recover the buoy and tow it back to Wicklow Harbour for demobilisation. Dublin Port will be contacted in advance regarding the operations with estimated timings. The buoy will be towed some 30m astern of the CT Branston at a maximum speed of 3.5 knots.

During recovery of the floating LiDAR buoy on Bray Bank, the vessel will be restricted in its ability to manoeuvre. All other vessels are requested to leave a wide berth during the recovery and towing operations. Radio transmissions will be conducted with VTS and other seafarers to notify them of the buoy operations.

Contact details can be found in Marine Notice No 85 of 2022, attached below.

Published in Power From the Sea

Marine Notice 37 of 2021 advised of the deployment of one floating lidar buoy and two wave buoys at the Dublin Array offshore wind farm on the Bray and Kish Banks.

The Department of Transport has now been advised by Partrac Ltd that all three Metocean buoys are scheduled to be serviced soon over a period of two days.

Weather permitting, it is expected that the two wave buoys will be recovered and redeployed in the three-week period between tomorrow, Friday 11 February and Friday 4 March.

The floating lidar buoy will be towed from its location on Bray Bank to Wicklow Harbour for routine maintenance overnight and towed back to Bray Bank for redeployment in its current position. This recovery and redeployment will take place in the three-week period between Thursday 24 February 2022 and Friday 18 March.

The AMS Retriever (callsign MEHI8) will recover and redeploy all three buoys. The floating lidar buoy will be towed some 30 metres astern of the AMS Retriever at a maximum speed of 3.5 knots.

During this time, the vessel will be restricted in its ability to manoeuvre. As such, vessels operating within this area are requested to keep their distance, maintaining a safety zone around the deployment vessel, and pass at minimum speed to reduce vessel wash.

Radio transmissions will be conducted with VTS and other seafarers to notify them of the buoy operations.

Coordinates of the buoy locations and contact details can be found in Marine Notice No 10 of 2022, attached below.

Published in News Update

Following the Marine Notice two months ago on the deployment of wave buoys and a floating lidar buoy at the Dublin Array offshore wind farm, a new notice has been issued regarding the lidar buoy’s move to a fixed position.

Partrac Ltd will relocate the floating lidar buoy from its current temporary position at Kish Lighthouse to a new location in Bray Bank some time between this Wednesday 4 August and Tuesday 17 August, weather permitting.

The relocation is expected to take one day. The buoy will then remain in place for 18 months and a further Marine Notice will be issued providing information on the retrieval of the buoy.

The AMS Retriever (callsign MEHI8) will recover the buoy and tow it to its new location. During this work, the vessel will be restricted in its ability to manoeuvre.

As such, all other vessels operating within this area are requested to keep their distance, maintaining a safety zone around the AMS Retriever, and to pass at minimum speed to reduce vessel wash.

Further details including coordinates of the buoy’s new location are included in Marine Notice No 44 of 2021, which can be downloaded below.

Published in News Update

Partrac Ltd intend to deploy three Metocean buoys at the Dublin Array offshore wind farm in a one-day operation some time between this Wednesday 9 and Wednesday 23 June, weather permitting.

One floating lidar buoy and two wave buoys will be deployed by the AMS Retriever (callsign MEHI8) which will be displaying all appropriate lights and shapes.

The floating lidar buoy has a square footprint with an area of 4m2 and a height of some 4m above the water line. It is yellow in colour and has a St Andrew’s cross on top.

The wave buoys are spherical in shape with a diameter of around 1.1m. When deployed, the wave buoys appear clear with a yellow hull.

Both the floating lidar buoy and the wave buoys have a yellow light which emits five flashes every 20 seconds. The light is visible for up to three nautical miles.

The floating lidar buoy will be deployed for a period of four to eight weeks. It will then be moved to a permanent position in the south end of Dublin Array where it will be deployed for 18 months. The wave buoys will be deployed for a period of 12 months.

The floating lidar buoy will be towed approximately 30m astern of the AMS Retriever at a maximum speed of four knots.

As such, the vessel will be restricted in its ability to manoeuvre so all other boats operating in proximity are requested to keep their distance, maintaining a safety zone around the deployment vessel and pass at minimum speed to reduce vessel wash.

Details of the buoy locations are included in Marine Notice No 37 of 2021 which can be downloaded below.

Published in News Update

Mariners have been given notice of a series of geophysical surveys for the Dublin Array Wind Farm taking place between next week and early May.

The Dublin Array is a project on the Kish and Bray banks some 10 km off the east coast of Ireland, immediately south of Dublin.

As previously reported on Afloat.ie, the proposed Irish-German venture could see as many as 100 wind turbines generate power for more than half a million homes.

Fugro GB Marine Limited has been contracted for the geophysical surveys to characterise the offshore array and export cable search area, including exploring possible landfall options at Shanganagh Park and Poolbeg.

Operations across a total of four vessels are expected to begin next Tuesday 9 February and continue until Tuesday 11 May.

Details of the surveys and their coordinates are included in Fugro’s notice to mariners, which can be downloaded below.

Published in Dublin Bay

A €1.5 billion offshore wind farm stretching from Booterstown to Greystones could generate enough electricity to power 600,000 homes.

The Irish Times reports on proposals by an Irish-German partnership for the ‘Dublin Array’ offshore energy venture that could see as many as 100 wind turbines installed over 2,440 hectares, partly in Dublin Bay.

Saorgus and Innogy are now seeing a foreshore licence to conduct surveys in the intended locations of the Kish Bank and Bray Bank.

Pledges have been made to work with shipping companies, fishing interests, sailing clubs and other water users during this process, as the venture promises a “meaningful approach to supporting local communities”.

It is also hoped that the project would benefit from new Government supports guaranteeing revenue for renewable energy generators, a scheme which is currently under EU scrutiny.

The Irish Times has much more on the story HERE.

Published in Dublin Bay
Page 1 of 2

About the Irish Navy

The Navy maintains a constant presence 24 hours a day, 365 days a year throughout Ireland’s enormous and rich maritime jurisdiction, upholding Ireland’s sovereign rights. The Naval Service is tasked with a variety of roles including defending territorial seas, deterring intrusive or aggressive acts, conducting maritime surveillance, maintaining an armed naval presence, ensuring right of passage, protecting marine assets, countering port blockades; people or arms smuggling, illegal drugs interdiction, and providing the primary diving team in the State.

The Service supports Army operations in the littoral and by sealift, has undertaken supply and reconnaissance missions to overseas peace support operations and participates in foreign visits all over the world in support of Irish Trade and Diplomacy.  The eight ships of the Naval Service are flexible and adaptable State assets. Although relatively small when compared to their international counterparts and the environment within which they operate, their patrol outputs have outperformed international norms.

The Irish Naval Service Fleet

The Naval Service is the State's principal seagoing agency. The Naval Service operates jointly with the Army and Air Corps.

The fleet comprises one Helicopter Patrol Vessel (HPV), three Offshore Patrol Vessels (OPV), two Large Patrol Vessel (LPV) and two Coastal Patrol Vessels (CPV). Each vessel is equipped with state of the art machinery, weapons, communications and navigation systems.

LÉ EITHNE P31

LE Eithne was built in Verlome Dockyard in Cork and was commissioned into service in 1984. She patrols the Irish EEZ and over the years she has completed numerous foreign deployments.

Type Helicopter Patrol Vessel
Length 80.0m
Beam 12m
Draught 4.3m
Main Engines 2 X Ruston 12RKC Diesels6, 800 HP2 Shafts
Speed 18 knots
Range 7000 Nautical Miles @ 15 knots
Crew 55 (6 Officers)
Commissioned 7 December 1984

LÉ ORLA P41

L.É. Orla was formerly the HMS SWIFT a British Royal Navy patrol vessel stationed in the waters of Hong Kong. She was purchased by the Irish State in 1988. She scored a notable operational success in 1993 when she conducted the biggest drug seizure in the history of the state at the time, with her interception and boarding at sea of the 65ft ketch, Brime.

Type Coastal Patrol Vessel
Length 62.6m
Beam 10m
Draught 2.7m
Main Engines 2 X Crossley SEMT- Pielstick Diesels 14,400 HP 2 Shafts
Speed 25 + Knots
Range 2500 Nautical Miles @ 17 knots
Crew 39 (5 Officers)

LÉ CIARA P42

L.É. Ciara was formerly the HMS SWALLOW a British Royal Navy patrol vessel stationed in the waters of Hong Kong. She was purchased by the Irish State in 1988. She scored a notable operational success in Nov 1999 when she conducted the second biggest drug seizure in the history of the state at that time, with her interception and boarding at sea of MV POSIDONIA of the south-west coast of Ireland.

Type Coastal Patrol Vessel
Length 62.6m
Beam 10m
Draught 2.7m
Main Engines 2 X Crossley SEMT- Pielstick Diesels 14,400 HP 2 Shafts
Speed 25 + Knots
Range 2500 Nautical Miles @ 17 knots
Crew 39 (5 Officers)

LÉ ROISIN P51

L.É. Roisin (the first of the Roisín class of vessel) was built in Appledore Shipyards in the UK for the Naval Service in 2001. She was built to a design that optimises her patrol performance in Irish waters (which are some of the roughest in the world), all year round. For that reason a greater length overall (78.8m) was chosen, giving her a long sleek appearance and allowing the opportunity to improve the conditions on board for her crew.

Type Long Offshore Patrol Vessel
Length 78.84m
Beam 14m
Draught 3.8m
Main Engines 2 X Twin 16 cly V26 Wartsila 26 medium speed Diesels
5000 KW at 1,000 RPM 2 Shafts
Speed 23 knots
Range 6000 Nautical Miles @ 15 knots
Crew 44 (6 Officers)
Commissioned 18 September 2001

LÉ NIAMH P52

L.É. Niamh (the second of the Róisín class) was built in Appledore Shipyard in the UK for the Naval Service in 2001. She is an improved version of her sister ship, L.É.Roisin

Type Long Offshore Patrol Vessel
Length 78.84m
Beam 14m
Draught 3.8m
Main Engines 2 X Twin 16 cly V26 Wartsila 26 medium speed Diesels
5000 KW at 1,000 RPM 2 Shafts
Speed 23 knots
Range 6000 Nautical Miles @ 15 knots
Crew 44 (6 Officers)
Commissioned 18 September 2001

LÉ SAMUEL BECKETT P61

LÉ Samuel Beckett is an Offshore Patrol Vessel built and fitted out to the highest international standards in terms of safety, equipment fit, technological innovation and crew comfort. She is also designed to cope with the rigours of the North-East Atlantic.

Type Offshore Patrol Vessel
Length 90.0m
Beam 14m
Draught 3.8m
Main Engines 2 x Wärtsilä diesel engines and Power Take In, 2 x shafts, 10000kw
Speed 23 knots
Range 6000 Nautical Miles @ 15 knots
Crew 44 (6 Officers)

LÉ JAMES JOYCE P62

LÉ James Joyce is an Offshore Patrol Vessel and represents an updated and lengthened version of the original RÓISÍN Class OPVs which were also designed and built to the Irish Navy specifications by Babcock Marine Appledore and she is truly a state of the art ship. She was commissioned into the naval fleet in September 2015. Since then she has been constantly engaged in Maritime Security and Defence patrolling of the Irish coast. She has also deployed to the Defence Forces mission in the Mediterranean from July to end of September 2016, rescuing 2491 persons and recovering the bodies of 21 deceased

Type Offshore Patrol Vessel
Length 90.0m
Beam 14m
Draught 3.8m
Main Engines 2 x Wärtsilä diesel engines and Power Take In, 2 x shafts, 10000kw
Speed 23 knots
Range 6000 Nautical Miles @ 15 knots
Crew 44 (6 Officers)

LÉ WILLIAM BUTLER YEATS P63

L.É. William Butler Yeats was commissioned into the naval fleet in October 2016. Since then she has been constantly engaged in Maritime Security and Defence patrolling of the Irish coast. She has also deployed to the Defence Forces mission in the Mediterranean from July to October 2017, rescuing 704 persons and recovering the bodies of three deceased.

Type Offshore Patrol Vessel
Length 90.0m
Beam 14m
Draught 3.8m
Main Engines 2 x Wärtsilä diesel engines and Power Take In, 2 x shafts, 10000kw
Speed 23 knots
Range 6000 Nautical Miles @ 15 knots
Crew 44 (6 Officers)

LÉ GEORGE BERNARD SHAW P64

LÉ George Bernard Shaw (pennant number P64) is the fourth and final ship of the P60 class vessels built for the Naval Service in Babcock Marine Appledore, Devon. The ship was accepted into State service in October 2018, and, following a military fit-out, commenced Maritime Defence and Security Operations at sea.

Type Offshore Patrol Vessel
Length 90.0m
Beam 14m
Draught 3.8m
Main Engines 2 x Wärtsilä diesel engines and Power Take In, 2 x shafts, 10000kw
Speed 23 knots
Range 6000 Nautical Miles @ 15 knots
Crew 44 (6 Officers)

Ship information courtesy of the Defence Forces

Irish Navy FAQs

The Naval Service is the Irish State's principal seagoing agency with "a general responsibility to meet contingent and actual maritime defence requirements". It is tasked with a variety of defence and other roles.

The Naval Service is based in Ringaskiddy, Cork harbour, with headquarters in the Defence Forces headquarters in Dublin.

The Naval Service provides the maritime component of the Irish State's defence capabilities and is the State's principal seagoing agency. It "protects Ireland's interests at and from the sea, including lines of communication, fisheries and offshore resources" within the Irish exclusive economic zone (EEZ). The Naval Service operates jointly with the Army and Air Corps as part of the Irish defence forces.

The Naval Service was established in 1946, replacing the Marine and Coastwatching Service set up in 1939. It had replaced the Coastal and Marine Service, the State's first marine service after independence, which was disbanded after a year. Its only ship was the Muirchú, formerly the British armed steam yacht Helga, which had been used by the Royal Navy to shell Dublin during the 1916 Rising. In 1938, Britain handed over the three "treaty" ports of Cork harbour, Bere haven and Lough Swilly.

The Naval Service has nine ships - one Helicopter Patrol Vessel (HPV), three Offshore Patrol Vessels (OPV), two Large Patrol Vessel (LPV) and two Coastal Patrol Vessels (CPV). Each vessel is equipped with State of the art machinery, weapons, communications and navigation systems.

The ships' names are prefaced with the title of Irish ship or "long Éireannach" (LE). The older ships bear Irish female names - LÉ Eithne, LÉ Orla, LÉ Ciara, LÉ Roisín, and LÉ Niamh. The newer ships, named after male Irish literary figures, are LÉ Samuel Beckett, LÉ James Joyce, LÉ William Butler Yeats and LÉ George Bernard Shaw.

Yes. The 76mm Oto Melara medium calibre naval armament is the most powerful weapon in the Naval Services arsenal. The 76mm is "capable of engaging naval targets at a range of up to 17km with a high level of precision, ensuring that the Naval Service can maintain a range advantage over all close-range naval armaments and man-portable weapon systems", according to the Defence Forces.

The Fleet Operational Readiness Standards and Training (FORST) unit is responsible for the coordination of the fleet needs. Ships are maintained at the Mechanical Engineering and Naval Dockyard Unit at Ringaskiddy, Cork harbour.

The helicopters are designated as airborne from initial notification in 15 minutes during daylight hours, and 45 minutes at night. The aircraft respond to emergencies at sea, on inland waterways, offshore islands and mountains and cover the 32 counties. They can also assist in flooding, major inland emergencies, intra-hospital transfers, pollution, and can transport offshore firefighters and ambulance teams. The Irish Coast Guard volunteers units are expected to achieve a 90 per cent response time of departing from the station house in ten minutes from notification during daylight and 20 minutes at night. They are also expected to achieve a 90 per cent response time to the scene of the incident in less than 60 minutes from notification by day and 75 minutes at night, subject to geographical limitations.

The Flag Officer Commanding Naval Service (FOCNS) is Commodore Michael Malone. The head of the Defence Forces is a former Naval Service flag officer, now Vice-Admiral Mark Mellett – appointed in 2015 and the first Naval Service flag officer to hold this senior position. The Flag Officer oversees Naval Operations Command, which is tasked with the conduct of all operations afloat and ashore by the Naval Service including the operations of Naval Service ships. The Naval Operations Command is split into different sections, including Operations HQ and Intelligence and Fishery Section.

The Intelligence and Fishery Section is responsible for Naval Intelligence, the Specialist Navigation centre, the Fishery Protection supervisory and information centre, and the Naval Computer Centre. The Naval Intelligence Cell is responsible for the collection, collation and dissemination of naval intelligence. The Navigation Cell is the naval centre for navigational expertise.

The Fishery Monitoring Centre provides for fishery data collection, collation, analysis and dissemination to the Naval Service and client agencies, including the State's Sea Fisheries Protection Agency. The centre also supervises fishery efforts in the Irish EEZ and provides data for the enhanced effectiveness of fishery protection operations, as part of the EU Common Fisheries Policy. The Naval Computer Centre provides information technology (IT) support service to the Naval Service ashore and afloat.

This headquarters includes specific responsibility for the Executive/Operations Branch duties. The Naval Service Operations Room is a coordination centre for all NS current Operations. The Naval Service Reserve Staff Officer is responsible for the supervision, regulation and training of the reserve. The Diving section is responsible for all aspects of Naval diving and the provision of a diving service to the Naval Service and client agencies. The Ops Security Section is responsible for the coordination of base security and the coordination of all shore-based security parties operating away from the Naval base. The Naval Base Comcen is responsible for the running of a communications service. Boat transport is under the control of Harbour Master Naval Base, who is responsible for the supervision of berthage at the Naval Base and the provision of a boat service, including the civilian manned ferry service from Haulbowline.

Naval Service ships have undertaken trade and supply missions abroad, and personnel have served as peacekeepers with the United Nations. In 2015, Naval Service ships were sent on rotation to rescue migrants in the Mediterranean as part of a bi-lateral arrangement with Italy, known as Operation Pontus. Naval Service and Army medical staff rescued some 18,000 migrants, either pulling people from the sea or taking them off small boats, which were often close to capsizing having been towed into open water and abandoned by smugglers. Irish ships then became deployed as part of EU operations in the Mediterranean, but this ended in March 2019 amid rising anti-immigrant sentiment in the EU.

Essentially, you have to be Irish, young (less than 32), in good physical and mental health and with normal vision. You must be above 5'2″, and your weight should be in keeping with your age.

Yes, women have been recruited since 1995. One of the first two female cadets, Roberta O'Brien from the Glen of Aherlow in Co Tipperary, became its first female commander in September 2020. Sub Lieutenant Tahlia Britton from Donegal also became the first female diver in the navy's history in the summer of 2020.

A naval cadet enlists for a cadetship to become an officer in the Defence Forces. After successfully completing training at the Naval Service College, a cadet is commissioned into the officer ranks of the Naval Service as a Ensign or Sub Lieutenant.

A cadet trains for approximately two years duration divided into different stages. The first year is spent in military training at the Naval Base in Haulbowline, Cork. The second-year follows a course set by the National Maritime College of Ireland course. At the end of the second year and on completion of exams, and a sea term, the cadets will be qualified for the award of a commission in the Permanent Defence Force as Ensign.

The Defence Forces say it is looking for people who have "the ability to plan, prioritise and organise", to "carefully analyse problems, in order to generate appropriate solutions, who have "clear, concise and effective communication skills", and the ability to "motivate others and work with a team". More information is on the 2020 Qualifications Information Leaflet.

When you are 18 years of age or over and under 26 years of age on the date mentioned in the notice for the current competition, the officer cadet competition is held annually and is the only way for potential candidates to join the Defence Forces to become a Naval Service officer. Candidates undergo psychometric and fitness testing, an interview and a medical exam.
The NMCI was built beside the Naval Service base at Ringaskiddy, Co Cork, and was the first third-level college in Ireland to be built under the Government's Public-Private Partnership scheme. The public partners are the Naval Service and Cork Institute of Technology (CIT) and the private partner is Focus Education.
A Naval Service recruit enlists for general service in the "Other Ranks" of the Defence Forces. After successfully completing the initial recruit training course, a recruit passes out as an Ordinary Seaman and will then go onto their branch training course before becoming qualified as an Able Body sailor in the Naval Service.
No formal education qualifications are required to join the Defence Forces as a recruit. You need to satisfy the interview board and the recruiting officer that you possess a sufficient standard of education for service in the Defence Forces.
Recruit training is 18 weeks in duration and is designed to "develop a physically fit, disciplined and motivated person using basic military and naval skills" to "prepare them for further training in the service. Recruits are instilled with the Naval Service ethos and the values of "courage, respect, integrity and loyalty".
On the progression up through the various ranks, an Able Rate will have to complete a number of career courses to provide them with training to develop their skills in a number of areas, such as leadership and management, administration and naval/military skills. The first of these courses is the Naval Service Potential NCO course, followed by the Naval Service Standard NCO course and the Naval Service senior NCO course. This course qualifies successful candidates of Petty officer (or Senior Petty Officer) rank to fill the rank of Chief Petty Officer upwards. The successful candidate may also complete and graduate with a Bachelor of Arts in Leadership, Management and Naval Studies in partnership with Cork Institute of Technology.
Pay has long been an issue for just the Naval Service, at just over 1,000 personnel. Cadets and recruits are required to join the single public service pension scheme, which is a defined benefit scheme, based on career-average earnings. For current rates of pay, see the Department of Defence website.