Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Bullock Harbour (Masterplan)

The presence of a murky substance and discolouration in the water surrounding Bullock Harbour and Dalkey, Irish Water claim does not emanate from their waste treatment plants.

As the Dublin Gazette reports locals voiced their concern on the quality of the water during the week with images posted online showing a black substance floating to the top of the bay.

In a statement, Irish Water said: “Irish Water has investigated this issue and can confirm that the discolouration at Bullock Harbour is unrelated to the wastewater treatment process.

“All wastewater assets in the area are operating as normal and no incidents have been reported.”

Green Party county councillor Ossian Smyth says that “seawater is tested weekly at nine points along the coast from Shankill to Blackrock.

More on the story can be read here 

In addition Afloat adds a Harbour Masterplan prepared by the local council concerning Bullock and neighbouring Sandycove is currently available for consultation. 

Dun Laoghaire-Rathdown Council invite any interested parties or individuals to make submissions and observations in respect of the Bullock and Sandycove Harbours Draft Masterplan 2019 noting the closing date is Monday, 19th August. 

Click the download of the draft Masterplan and the link to an online survey to make submission.  

Published in Dublin Bay

Shannon Foynes Port Information

Shannon Foynes Port (SFPC) are investing in an unprecedented expansion at its general cargo terminal, Foynes, adding over two-thirds the size of its existing area. In the latest phase of a €64 million investment programme, SFPC is investing over €20 million in enabling works alone to convert 83 acres on the east side of the existing port into a landbank for marine-related industry, port-centric logistics and associated infrastructure. The project, which will be developed on a phased basis over the next five years, will require the biggest infrastructure works programme ever undertaken at the port, with the entire 83 acre landbank having to be raised by 4.4 metres. The programme will also require the provision of new internal roads and multiple bridge access as well as roundabout access.