Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Ocean Signal

There has often been a dilemma as to which type of personal locator beacon (PLB) is best for mariners — the choice being either the 406Mk satellite PLB or the AIS beacon.

Now with the all-new, DAME Design Award winning Ocean Signal RescueMe PLB3, both systems have been combined into one, making it the ultimate PLB for all users.

Add return link sending (RLS), near-field communication (NFC) and controllability via a smartphone app, and the RescueMe PLB3 is a game-changer in personal safety onboard, whether for inshore, coastal or trans-ocean use.

CH Marine are taking pre-orders now for delivery by the end of December at a special limited Black Friday deal price of €499 — a huge saving of 25% on the RRP of €670.

Published in CH Marine Chandlery
Tagged under

Owners of the Ocean Signal SeaSafe E100 or E100G emergency radio beacons are reminded to perform their unit’s self-test function as soon as possible.

The manufacturer says all of its EPIRBs should be routinely tested on a monthly basis, as per the user manual.

All Ocean Signal beacons are designed to have sufficient capacity to accommodate a monthly self-test over the lifetime of the battery.

However, for those beacons that do not pass the self-test, an exchange process is being offered for affected units.

Details on how to perform the self-test — and seek a replacement if necessary — are detailed in Marine Notice No 29 of 2020 attached below.

Published in Marine Warning

Shannon Foynes Port Information

Shannon Foynes Port (SFPC) are investing in an unprecedented expansion at its general cargo terminal, Foynes, adding over two-thirds the size of its existing area. In the latest phase of a €64 million investment programme, SFPC is investing over €20 million in enabling works alone to convert 83 acres on the east side of the existing port into a landbank for marine-related industry, port-centric logistics and associated infrastructure. The project, which will be developed on a phased basis over the next five years, will require the biggest infrastructure works programme ever undertaken at the port, with the entire 83 acre landbank having to be raised by 4.4 metres. The programme will also require the provision of new internal roads and multiple bridge access as well as roundabout access.