Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: near collision

An Isle of Man Government fisheries protection vessel (FPV) which enforces legislation up to 12 nautical miles offshore, was recently involved in a ‘close quarters situation’ with another boat.

According to ManxRadio, the incident led to ‘avoidance manoeuvres’ having to be undertaken on 1 November after the Department of of Environment, Food and Agriculture's (DEFA) fisheries patrol vessel FPV Barrule and a local fishing boat had almost collided.

The next day the incident was reported to the Isle of Man Ship Registry.

Following the near collision, details of the incident between the 22m FPV Barrule and the fishing boat were released in response to a Freedom of Information (FOI) request.

The questioner had asked DEFA as to whether the fishing boat, the Bonnie Lass would have been ‘T-boned’ if it hadn’t been put into reverse, with its trawl gear down.

FPV Barrule Afloat adds is used by DEFA officers to enforce sea fisheries legislation within Manx territorial waters where the FPV is equipped with a RIB which is launched from the stern. This enables officers to board fishing vessels for inspection.

Another function is for scientists to conduct monitoring and survey work aswell to DEFA chartering the vessel which has a crew of five but is licensed to carry up to 12 persons. 

Published in Isle of Man

Shannon Foynes Port Information

Shannon Foynes Port (SFPC) are investing in an unprecedented expansion at its general cargo terminal, Foynes, adding over two-thirds the size of its existing area. In the latest phase of a €64 million investment programme, SFPC is investing over €20 million in enabling works alone to convert 83 acres on the east side of the existing port into a landbank for marine-related industry, port-centric logistics and associated infrastructure. The project, which will be developed on a phased basis over the next five years, will require the biggest infrastructure works programme ever undertaken at the port, with the entire 83 acre landbank having to be raised by 4.4 metres. The programme will also require the provision of new internal roads and multiple bridge access as well as roundabout access.