An ultra-high-resolution geophysical survey will be carried out in the Oriel Wind Farm array area in the Irish Sea off Co Louth to provide bathymetric and subsurface information to facilitate the development of the offshore wind farm.
The survey work was anticipated to start Friday 18 November 2022 and to be completed by mid-December 2022, subject to weather and operational constraints.
Works will be confined to the Oriel Wind Farm array area, which is located between Dunany Point and the Cooley Peninsula.
The survey will be conducted by the Fastnet Pelican (callsign 2FNX7), which is a shallow draft survey vessel. The vessel will be restricted in its ability to manoeuvre due to the deployment of towed survey equipment up to 100 metres astern.
All other vessels operating within this area are requested to leave a wide berth.
The work vessel will display appropriate lights and signals and operations will be conducted during daylight hours. Mariners are advised to keep continuous watch on VHF Channel 16 when navigating the area.
Coordinates and a map of the survey area as well as contact details can be found in Marine Notice No 78 of 2022, attached below.