Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Egan,

# CANOEING: Ireland’s two senior competitors at the Canoe Marathon World Championships finished in the top 20 in their classes in Rome today. In the women’s K1, Jenny Egan had a frustrating run which included a capsize and was eventually placed 16th. This was just over seven minutes behind Renata Csay of Hungary. In the men’s K1, Peter Egan was 17th. The event was won by Spain’s Ivan Alonso.

Canoe Marathon World Championships – Day Two (Irish interest)

Men

K1 Senior: 1 Spain (I Alonso) 2 hours 11 mins 43.120 seconds; 17 P Egan 2:16:28.870.

Women

K1 Senior: 1 Hungary (R Csay) 2 hours 1 minute 2.710 seconds; 16 J Egan 2:08:05.460

Published in Canoeing

#CANOEING: Ireland’s Barry Watkins reached two semi-finals at the ICF Canoe Sprint World Cup in Poznan in Poland today. He came closest to reaching the A Final in the K1 500 metres - he finished fourth in the semi-final, having won his heat. In the K1 1,000 metres he was second in his heat and fifth in the semi-final.

Jenny Egan reached the semi-final of the K1 500 metres, where she finished sixth.  

Canoe Sprint World Cup, Poznan, Poland (Irish interest)

Men

K1 1,000m – Heat Five (1-6 to semi-final): 2 Ireland (B Watkins) 3:44.458. Semi-Final Two (1-2 and 3rd best time to A Final): 5 Watkins 3:58.572

K1 500 Heat Five (1-7 and one best time to Semi-Final): 1 Watkins 1:49.747. Semi-Final (1-2 and next best time to A Final): Watkins 1:49.618

Women

K1 500 – Heat One (1-6 to semi-final): 5 Ireland (J Egan) 2:07.163. Semi-Final One (1-2 and 3rd best time to A Final) 6 Egan 2:09.263.

Published in Canoeing

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.