Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Luke Patience

The British Olympic Association (BOA) has announced the names of the very first athletes to officially join Team GB for the Rio 2016 Olympic Games.

A total of eight athletes have been selected across six of the ten sailing events, who between them have won four Olympic medals and seven World Championship golds.

Giles Scott's is the first name to appear on the Rio teamsheet, with the 28-year-old, unbeaten in almost two years, set to make his Olympic debut in the Finn class.

London 2012 silver medallists Hannah Mills and Saskia Clark are paired together again in the 470 Women's class while Luke Patience, who also won silver three years ago, teams up with two-time World Champion Elliot Willis in the 470 Men's event.

Bryony Shaw, who became Britain's first female Olympic medal-winning windsurfer with bronze at Beijing 2008, is set to contest her third Olympic Games next year in the RS:X Women's event.

London 2012 Olympian Alison Young returns in the Laser Radial while 2015 Laser World Champion Nick Thompson earns his first Olympic appearance to round off the first wave of sailing selections for Rio.

British sailors have won 55 medals - including 26 golds - since sailing made its debut at Paris 1900 with Team GB topping the overall Olympic sailing medal table.

Trials for the Irish Olympic team get underway in the mens and women's Laser class this Winter.

Published in Olympic

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.