Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Suspended sailings

Ferry company Stena Line has been forced to suspend sailings between Rosslare and Fishguard until 12 April, to plug gap left by P&O Ferries between Larne and Cairnryan.

As ITV news reports, P&O’s two ships – the European Causeway and the European Highlander – haven’t sailed on the route since the company sacked all 800 staff on St Patrick’s Day.

It caused a freight backlog on a key route used to bring goods into Northern Ireland.

As a result, Stena Line moved the Stena Nordica onto the route as an extra freight ship from its (temporary) Dublin to Holyhead service.

It was replaced on that route by the Stena Europe – which had been sailing between Rosslare-Fishguard.

Afloat.ie adds Stena Europe has since last month, operated as second ship on the Dublin-Holyhead route along with Stena Adventurer. This led to the route's other routine ferry, Stena Estrid to transfer to the Rosslare-Cherbourg route

While the Ireland-France route ferry Stena Horizon dry-docks at Harland & Wolff, Belfast, as alluded in the ITV coverage which has more. 

Published in Stena Line

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.