Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: TUC

In the UK, the head of the Trades Union Congress has written to the Insolvency Service calling for it to disqualify the directors of P&O Ferries after they sacked nearly 800 crew without notice.

In a letter seen by The Guardian, Frances O’Grady, the TUC’s general secretary, said the Insolvency Service should “initiate disqualification proceedings against the directors of P&O Ferries Division Holdings Limited”.

The Insolvency Service last month confirmed it had “initiated both formal criminal and civil investigations” into the circumstances of the redundancies, after making inquiries at the request of the government.

P&O Ferries caused outrage when it fired 786 workers with immediate effect on 17 March, despite no notice or consultation with unions, as required under company law. The company, which is owned by Dubai-based DP World, instead said it would replace those workers with lower-paid agency staff.

A week later, Peter Hebblethwaite, the chief executive of P&O Ferries, admitted to astonished MPs that its directors “chose not to” consult workers despite acknowledging there was “absolutely no doubt we were required to consult with the unions”.

His testimony prompted MPs to ask whether he was a “shameless criminal”, but he insisted he would “make this decision again”

The Guardian has more on the story.  

Published in Ferry

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.