Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Minister for the Environment

16th September 2011

New Angling Resort Makes a Splash

The Irish Times' Derek Evans has good things to say about the new Southern County Fishing Resort in Bagenalstown, Co Carlow.
"Bowled over" by the "45 acres of beautifully landscaped surrounds", Evans was particularly taken by the resort's three lakes, "all stocked with high quality rainbow trout grown from the hatchery on site".
Big catches are plentiful for anglers of all ages and levels of experience. Novices are particularly welcome as bait and rod hire are available.
Speaking at the launch, Minister for the Environment Phil Hogan said: "This type of development is what we need in rural areas to develop a natural product, to love nature and to understand the value of our water resource."
The Irish Times has more on the story HERE.

The Irish Times' angling correspondent Derek Evans has good things to say about the new Southern County Fishing Resort in Bagenalstown, Co Carlow.

"Bowled over" by the "45 acres of beautifully landscaped surrounds", Evans was particularly taken by the resort's three lakes, "all stocked with high quality rainbow trout grown from the hatchery on site".

Big catches are plentiful for anglers of all ages and levels of experience. Novices are particularly welcome as bait and rod hire are available.

Speaking at the launch, Minister for the Environment Phil Hogan said: "This type of development is what we need in rural areas to develop a natural product, to love nature and to understand the value of our water resource."

The Irish Times has more on the story HERE.

Published in Angling
Minister for the Environment Phil Hogan is set to be quizzed over plans to deal with the toxic waste site on Haulbowline island in Cork Harbour, the Irish Examiner reports.
As previously reported on Afloat.ie, two weeks ago the European Commission gave the Government three months to take action over the the former steel works, which contains an estimated 500,000 tonnes of toxic metal waste and cancer-causing materials.
The minister will meet Cork County Council on 9 May after an official request to discuss the matter was made by Cobh independent councillor Seán O'Connor.
Labour councillor John Mulvihill said locals would not be happy until the waste was removed and a study conducted to examine if there was any link between the site and high cancer rates in the area.
The Irish Examiner has more on the story HERE.

Minister for the Environment Phil Hogan is set to be quizzed over plans to deal with the toxic waste site on Haulbowline island in Cork Harbour, the Irish Examiner reports.

As previously reported on Afloat.ie, two weeks ago the European Commission gave the Government three months to take action over the the former steel works, which contains an estimated 500,000 tonnes of toxic metal waste and cancer-causing materials.

The minister will meet Cork County Council on 9 May after an official request to discuss the matter was made by Cobh independent councillor Seán O'Connor.

Labour councillor John Mulvihill said locals would not be happy until the waste was removed and a study conducted to examine if there was any link between the site and high cancer rates in the area. 

The Irish Examiner has more on the story HERE. See also our story Hot site in the harbour.

Published in Cork Harbour
New Minister for the Environment Phil Hogan has signed off on a key foreshore licence to Shell Ireland, paving the way for the completion of the controversial Corrib gas project.
The Irish Times reports that the licence, subject to conditions, consents for the construction of the final 8km section of pipeline linking the Corrib gas field to Shell's onshore terminal at Ballinaboy. Co Mayo.
The scheme already has approval from An Bord Pleanála, and consents approved by former acting energy minister Pat Carey. But An Taisce has sought a judicial review of the planning decision, due before the High Court on Tuesday.
Still required by the developer before any work can begin are a revised emissions licence from the Environmental Protection Agency and a safety permit from the Commission for Energy Regulation under the Petroleum (Exploration and Extraction) Safety Act 2010.
The Irish Times has more on the story HERE.

New Minister for the Environment Phil Hogan has signed off on a key foreshore licence to Shell Ireland, paving the way for the completion of the controversial Corrib gas project.

The Irish Times reports that the licence, subject to conditions, consents for the construction of the final 8km section of pipeline linking the Corrib gas field to Shell's onshore terminal at Ballinaboy. Co Mayo.

The scheme already has approval from An Bord Pleanála, and consents approved by former acting energy minister Pat Carey. But An Taisce has sought a judicial review of the planning decision, due before the High Court on Tuesday.

Still required by the developer before any work can begin are a revised emissions licence from the Environmental Protection Agency and a safety permit from the Commission for Energy Regulation under the Petroleum (Exploration and Extraction) Safety Act 2010.

The Irish Times has more on the story HERE.

Published in Coastal Notes

About Safehaven Marine 

Safehaven Marine are designers and builders of FRP Pilot boats, Patrol boats, Crew transfer vessels, Hydrographic survey catamarans, Naval & Military craft and unique custom private motor yachts. All our vessels are built to the highest standards of strength & engineering and are renowned worldwide for their exceptional sea-keeping abilities, we set a new World long-range speed record in 2017 with our own vessel and crew. Established in 1996 we have built over 138 vessels supplied to 27 countries worldwide with over 40 pilot vessels in operation globally, and have become leaders in our field.

Based in Youghal, Co Cork Ireland, Safehaven manufacture our vessels from two modern factories, with all design work carried out in house, and built with our own experienced team of engineers, carpenters, electricians, shipwrights and laminators.

Always at the forefront of new technology and designs we continuously develop our range and push the frontiers of design: In 2020 we aim to set a UIM Transatlantic World record with our unique (patent applied for) new 22m high-speed vessel XSV20

Interceptor 42 pilot boat

The Pilot 42 model built by Safehaven Marine has been delivered to ports worldwide and has proved to be a superb sea boat performing admirably in pilotage operations with all owners extolling its virtues of seakeeping, strength and stability.

L.O.A. (Length overall) 13.2m

L.W.L. (Length along waterline) 11.5m

Length moulded (GRP hull only) 12.7

Beam Moulded (GRP only ex fender) 4.0m

Beam overall (Including fenders) 4.4m

Draft (Depth of hull below waterline) 1.35m

Displacement Lightship 14,500kg

Fully loaded 16,000kg

Fuel capacity 1600 litres

Water capacity 110 litres

Crew capacity 5 persons

Engines Volvo D9 425hp

Gearboxes ZF325

Subdivision 4 x separate watertight compartments

Crew capacity 1-2 crew plus 3- 4 pilots

Classification PRS

Speed 23.5kts fully loaded