Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Scottish Port Access

#Ferry - Across Northern Ireland businesses continue to be disadvantaged by poor road access to their key markets in the UK.

Ferry operator Stena Line has raised concerns with local political and business stakeholders to increase the focus and necessity of addressing a critical infrastructure deficit which impacts a range of key NI business sectors including manufacturing, food production and tourism.

Whilst road connections in Northern Ireland have been better at keeping pace with economic development, a situation which will be greatly enhanced once work starts on the York Street Interchange project. The same cannot be said of key roads in Scotland, specifically the road network to and from Loch Ryan Port (Cairnryan), which handles approximately 45% of NI trade (through Belfast Port) with the rest of the UK.

Paul Grant, Stena Line’s Trade Director (Irish Sea North) said: “We have been working hard over a number of years to try to get key road improvements made on the A77 and more importantly the A75 heading south from Scotland. Despite significant investments by ferry operators between NI and Scotland, including Stena Line’s new £80m port and terminal facility at Cairnryan, which included the introduction of two larger ferries, successive administrations have been unable to commit the necessary capital resources to carry out these vital road upgrades.

“Access to and from Scottish ports is severely lacking compared with other UK hubs. Journeys could be made easier and travel times shortened which would help to reduce NI’s remoteness and help support key economic contributor groups such as hauliers and tourists. Investments have been made to roads at Holyhead and Heysham and these are already providing tangible benefits to business and tourism levels in their regions.”

Paul Grant added: “Local politicians need to engage with other stakeholders to get the Scottish and Westminster governments to work collaboratively to push for a fit for purpose road network system on both sides of the Irish Sea. The dualling of the A75 will be a long-term infrastructure project which could take a number of years to plan and complete. As it stands however, the clock isn’t even ticking so if we want NI to remain a competitive, forward thinking economy which can attract major investments in the future, we need to start the process of change and work collaboratively now to get the commitments and resources in place before a shift in trade away from NI becomes irreversible.”

Published in Ferry

About Safehaven Marine 

Safehaven Marine are designers and builders of FRP Pilot boats, Patrol boats, Crew transfer vessels, Hydrographic survey catamarans, Naval & Military craft and unique custom private motor yachts. All our vessels are built to the highest standards of strength & engineering and are renowned worldwide for their exceptional sea-keeping abilities, we set a new World long-range speed record in 2017 with our own vessel and crew. Established in 1996 we have built over 138 vessels supplied to 27 countries worldwide with over 40 pilot vessels in operation globally, and have become leaders in our field.

Based in Youghal, Co Cork Ireland, Safehaven manufacture our vessels from two modern factories, with all design work carried out in house, and built with our own experienced team of engineers, carpenters, electricians, shipwrights and laminators.

Always at the forefront of new technology and designs we continuously develop our range and push the frontiers of design: In 2020 we aim to set a UIM Transatlantic World record with our unique (patent applied for) new 22m high-speed vessel XSV20

Interceptor 42 pilot boat

The Pilot 42 model built by Safehaven Marine has been delivered to ports worldwide and has proved to be a superb sea boat performing admirably in pilotage operations with all owners extolling its virtues of seakeeping, strength and stability.

L.O.A. (Length overall) 13.2m

L.W.L. (Length along waterline) 11.5m

Length moulded (GRP hull only) 12.7

Beam Moulded (GRP only ex fender) 4.0m

Beam overall (Including fenders) 4.4m

Draft (Depth of hull below waterline) 1.35m

Displacement Lightship 14,500kg

Fully loaded 16,000kg

Fuel capacity 1600 litres

Water capacity 110 litres

Crew capacity 5 persons

Engines Volvo D9 425hp

Gearboxes ZF325

Subdivision 4 x separate watertight compartments

Crew capacity 1-2 crew plus 3- 4 pilots

Classification PRS

Speed 23.5kts fully loaded