Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Tarmonbarry

Waterways Ireland advises masters of vessels on and users of the Shannon Navigation that the closure of Tarmonbarry Bridge will be extended until at least Monday 27 May.

This further delay is due to additional repair works requiring specialist components being manufactured and delivered from international suppliers.

The cross-border body for Ireland’s inland waterways says the parts required are essential to the safe operation of the bridge.

A diversion route remains available via the Camlin River with additional staff being deployed to Clondra Lock to aid vessel movements along the Camlin.

Waterways Ireland says it regrets any inconvenience that this may cause and thanks its customers for their cooperation in relation to this matter.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on and users of the Shannon Navigation that the lifting bridge at Tarmonbarry in Co Roscommon will now reopen on Friday 3 May.

This extension of the bridge’s closure since February is a result of additional repair works required following a bridge strike.

The cross-border body for Ireland’s inland waterways says it apologises for extending this closure “but the additional work is essential to ensure the bridge is safely operational in advance of the bank holiday weekend”.

A diversion route remains available via the Camlin River.

Published in Inland Waterways

Waterways Ireland advises all masters of vessels on and users of the Shannon Navigation that the lifting bridge at Tarmonbarry in Co Roscommon will remain closed until at least Thursday 18 April to facilitate essential maintenance works.

Works at Tarmonbarry were previously extended twice since beginning in early February, and a diversion route is available via the Camlin River.

The cross-border body for Ireland’s inland waterways says it regrets any inconvenience that this may cause and thanks its customers for their cooperation.

This story was updated on Wednesday 3 April to include the latest information.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on and users of the Shannon Navigation that diving operations will be taking place at Tarmonbarry Wier from Monday 25 September for a period of approximately one week.

Alpha Flag (Divers Flag) will be flown to indicate the presence of divers in the water. The cross-border body for Ireland’s inland waterways asks masters of vessels to please proceed with additional caution in the area.

Published in Inland Waterways

Waterways Ireland advises all masters of vessels and water users on the Shannon Navigation that Tarmonbarry Bridge and Lock in Co Longford will be closed from Tuesday 10 to Friday 13 May for further emergency repair works.

An alternative route via the Camlin River is available. Masters of vessels and water users are advised to check their airdraft prior to undertaking the passage on this inland waterway due to the low bridge on the N5 road.

Update 11/5: Waterways Ireland says Tarmonbarry Bridge and Lock have now been reopened to navigation. Essential maintenance works are continuing at Tarmonbarry Bridge and some minor delays may be experienced.

Published in Inland Waterways

Waterways Ireland has launched a request for tender for the development of a visitor and tourism plan for the Clondra/Richmond Harbour and Tarmonbarry area at the western end of the Royal Canal.

According to the RFT, the intended plan “will chart and identify the recreational and tourism interventions required to boost tourism, recreation and economic regeneration in the area”.

Among its objectives are “to take an integrated development approach to conserve, develop and promote [the area] as a significant recreation/tourism destination in the centre of Ireland”, and “to set out a clear, realistic and achievable tourism vision…over a 10-year period”.

In addition, any plan “must be compatible with the environmental designation and zoning” of the localities covered on this part of the inland waterway.

A particular focus for Waterways Ireland will be to “protect and restore one of our heritage assets” — namely the old lock keeper’s house at Lock 46, which dates from the early 19th century.

The deadline for receipt of tender applications is 3pm on Thursday 13 January 2022. More details can be found on the eTenders website HERE.

Published in Inland Waterways

The re-opening of Tarmonbarry Lock on the Shannon Navigation has been extended until Wed 1 Apr 2015. Further information may be had by contacting Waterways Ireland's Carrick-on-Shannon office at 07196-50563 or the lockkeeper at 087-9222020.

Published in Inland Waterways
Tagged under

Waterways Ireland advises the Lock Gate maintenance at Tarmombarry on the Shannon Navigation has been completed.

Published in Inland Waterways
Tagged under

About Safehaven Marine 

Safehaven Marine are designers and builders of FRP Pilot boats, Patrol boats, Crew transfer vessels, Hydrographic survey catamarans, Naval & Military craft and unique custom private motor yachts. All our vessels are built to the highest standards of strength & engineering and are renowned worldwide for their exceptional sea-keeping abilities, we set a new World long-range speed record in 2017 with our own vessel and crew. Established in 1996 we have built over 138 vessels supplied to 27 countries worldwide with over 40 pilot vessels in operation globally, and have become leaders in our field.

Based in Youghal, Co Cork Ireland, Safehaven manufacture our vessels from two modern factories, with all design work carried out in house, and built with our own experienced team of engineers, carpenters, electricians, shipwrights and laminators.

Always at the forefront of new technology and designs we continuously develop our range and push the frontiers of design: In 2020 we aim to set a UIM Transatlantic World record with our unique (patent applied for) new 22m high-speed vessel XSV20

Interceptor 42 pilot boat

The Pilot 42 model built by Safehaven Marine has been delivered to ports worldwide and has proved to be a superb sea boat performing admirably in pilotage operations with all owners extolling its virtues of seakeeping, strength and stability.

L.O.A. (Length overall) 13.2m

L.W.L. (Length along waterline) 11.5m

Length moulded (GRP hull only) 12.7

Beam Moulded (GRP only ex fender) 4.0m

Beam overall (Including fenders) 4.4m

Draft (Depth of hull below waterline) 1.35m

Displacement Lightship 14,500kg

Fully loaded 16,000kg

Fuel capacity 1600 litres

Water capacity 110 litres

Crew capacity 5 persons

Engines Volvo D9 425hp

Gearboxes ZF325

Subdivision 4 x separate watertight compartments

Crew capacity 1-2 crew plus 3- 4 pilots

Classification PRS

Speed 23.5kts fully loaded