Menu

Ireland's sailing, boating & maritime magazine

 

Displaying items by tag: Sealink

#FERRY NEWS- The second of Stena Line's 'Superfast' new ferries Stena Superfast VIII, is en-route fresh from refurbishment in Gdansk, in advance of the new Belfast-Cairnryan route which is to open next Monday, writes Jehan Ashmore.

The new route to Loch Ryan Port, Cairnryan includes a new £80m ferryport terminal which will be served by the 30,000 gross tonnes sisters, the largest ever ferries on the North Channel. Stena Superfast VIII is currently in the Skagerrak off northern Denmark and follows her sister Stena Superfast VII which arrived over the weekend, having also undergone refurbishment at the Romentowa shipyard.

The relocation of Scottish terminal from Stranraer to Loch Ryan Port is seven miles closer to the open sea and sailing times are to be reduced to 2hrs and 15minutes. The new terminal is to be officially opened on 25th November when First Minister of Scotland Alex Salmond and Deputy First Minister of Northern Ireland Martin McGuinness will join Dan Sten Olsson, Chairman of Stena Line.

As for the 15,229 gross tonnes Stena Navigator, she made her Stranraer-Belfast sailing yesterday, after de-storing at the VT4 ferry terminal, only completed in 2008, she proceeded to berth at Albert Quay, the location of the former city-centre ferry terminal.

In the interim period to the opening of the new Belfast-Cairnryan route, the sailing schedule on the Belfast-Stranraer service are been maintained by another conventional ferry, Stena Caledonia and fast sailings by the HSS Stena Voyager.

HSS Stena Voyager is expected to lay-up at VT4 after making final sailings to and from Stranraer this Sunday. It is expected Stena Caledonia will also be withdrawn that day and berth at Albert Quay.  In the process she will pass Harland & Wolf shipyard, where she was launched in 1981 as the St. David, the last of the quartet of Saint-class ferries commissioend for Sealink/British Rail.

The career of Stena Navigator on the North Channel was short as she only entered service two years ago. She was built in 1984 as Champs Elysees first served for SNCF/Sealink's jointly run Dover-Calais route, followed by a brief spell under Stena Line as Stena Parisien on Newhaven-Dieppe sailings.

She returned to the Straits of Dover route but this time as SeaFrance Manet under the control of SeaFrance. In 2008 SeaFrance introduced SeaFrance Moliere, the former Superfast X, ironically another sister of Stena Line's 'Superfast' ships. This Superfast vessel along with two custom built newbuilds entered SeaFrance service in recent years which led to the eventual replacement of SeaFrance Renoir and her half sister SeaFrance Manet.

Published in Ferry
In the same week that Irish Continental Line (ICG) Group released end of year figures for 2010, their subdidiary Irish Ferries recorded a near 8% rise in passenger volumes and an announcement of a 10 year deal to continue operating on their south Welsh route, writes Jehan Ashmore.
Irish Ferries will maintain running the Rosslare route to Pembroke Dock for the next decade in an agreement signed with the Milford Haven Port Authority. The Pembrokeshire port provides docking and terminal facilities and the decade long contract secures the employment of 60 terminal staff.

The St. Georges channel crossing carries over 300,000 passengers and 80,000 freight annually and is served by the 34,031grt Isle of Inishmore. The ro-pax can handle 2,200 passengers, 802 cars / 152 freight trailers and is scheduled to two daily round trips, on a route that take nearly five hours.

The 1997 Dutch built vessel was first launched onto the central corridor route between Dublin-Holyhead but was transferred to the southern service after the introduction of Ulysses in 2001.

Rosslare-Pembroke Dock sailings only began in 1980, firstly operated by the B+I Line which competed with rival operators Sealink / British Rail (now Stena Line) on services running out of Fishguard.

This route was well established having started operations in 1906 and in an era when the railway companies (in this case the Great Western Railway) developed and owned the ports plus the operation of shipping services on the Irish Sea.

Published in Ferry

Dun Laoghaire to Dingle Yacht Race Information

The biennial Dun Laoghaire to Dingle race is a 320-miles race down to the east coast of Ireland, across the south coast and into Dingle harbour in County Kerry.

The race is organised by the National Yacht Club.

It never fails to offer a full range of weather, wind and tide to the intrepid entrants, ranging from a 32ft cruiser to a 79ft all-out racer.

Three divisions are available to enter: cruiser (boats equipped with furlers), racing (the bulk of the fleet) and also two-handed.

D2D Course change overruled

In 2019, the organisers considered changing the course to allow boats to select routes close to shore by removing the requirement to go outside Islands and Lighthouses en route, but following input from regular participants, the National Yacht Club decided to stick with the tried and tested course route in order to be fair to large and smaller boats and to keep race records intact.

RORC Points Calendar

The 2019 race was the first edition to form part of the Royal Ocean Racing Club “RORC” calendar for the season. This is in addition to the race continuing as part of the ISORA programme. 

D2D Course record time

Mick Cotter’s 78ft Whisper established the 1 day and 48 minutes course record for the Dun Laoghaire to Dingle Race in 2009 and that time stood until 2019 when Cotter returned to beat his own record but only just, the Dun Laoghaire helmsman crossing the line in Kerry to shave just 20 seconds off his 2009 time.