Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Shannon Foynes Port Company

Shannon Foynes Port Company (SFPC) is currently recruiting for the position of Business Development Executive.

Shannon Foynes is Ireland’s second largest port operation, currently handling in excess of 11 million tonnes per annum.

The Shannon Estuary is Ireland’s main deep-water facility with a channel depth of in excess of 32 meters and a handling capacity for large vessels up to 200,000 deadweight tonnes (dwt).

Supporting large-scale capital-intensive industry, it is the largest dry bulk port in Ireland. SFPC annually facilitates trade valued at €8.5bn supporting circa 3,700 jobs.

The company’s customer base extends across many sectors including the industrial, energy, agricultural, recyclable and renewable sectors to name some. Consequently, it facilitates a diverse trade mix in the dry bulk, liquid bulk and break-bulk categories.

Importantly, SFPC not only facilitates the movement of trade within its port estate and estuary but is developing as a large-scale distribution and industrial hub.

The company plans to develop and expand its existing customer base by providing new and/or improved customer offerings and services. To this end, it is necessary to build stronger relationships with the customer base and work with them to develop mutually beneficial solutions/services and offerings.

Reporting directly to the Head of Business Development, the Business Development Executive is a new role tasked with developing and managing the existing and future customer base for all ports under the remit of the company.

The role requires an individual with the desire and ability to network nationally and internationally, and in doing so identify potential opportunities for the Shannon Estuary which they will develop in conjunction with the Business Manager and team.

This is a role which requires well-developed business development and customer relationship management skills. Sector-specific experience is not essential.

Full details of the role, including how to apply, can be found via the SFPC website HERE.

Shannon Foynes Port Company is fully committed to a policy of equality of opportunity and treatment in its employment practices, and is committed to employing best practice in recruiting staff.

Published in Jobs

The ESB and Shannon Foynes Port have announced a funding collaboration for a €250k study at MaREI — the SFI Research Centre for Energy, Climate and Marine at University College Cork (UCC) — in the latest step towards helping Ireland to deliver floating offshore wind (FLOW) projects in the future.

Starting this month, the focus of the research will be to examine the requirements and identify potential sites for wet storage, which is the temporary offshore storage of floating offshore wind turbines in suitable areas prior to installation.

This is a key requirement for facilitating floating offshore wind, which will be a fundamental technology in Ireland reaching its offshore renewable targets.

Research will take place over two phases. The first phase will consist of understanding the key conditions and constraints associated with the development and identification of suitable wet storage sites, while phase two will focus on the technical challenges of designing sites in terms of the optimum layout and mooring configuration.

The aim of the study is to identify and inform considerations for the future FLOW industry that are required at an economic, environmental, societal and policy level in Ireland and also, to set a benchmark for best international practice through close academic and industry collaboration.

Ronan O’Flynn, ESB programme director for Green Atlantic @ Moneypoint said: “We understand the importance that floating offshore wind projects are going to play in both Ireland achieving its ambitious renewable energy targets and ESB delivering on our commitment to reach net zero by 2040.

“Research such as this, carried out by our partners MaREI and supported by Shannon Foynes Port, will help the entire industry to better understand what is required for crucial wet storage facilities that will allow floating offshore wind projects to be delivered at scale.”

‘This project will be an important enabler for the emerging floating wind energy sector in Ireland’

Pat Keating, CEO at Shannon Foynes Port said: “Our partnership with the ESB on funding this research will help underpin understanding in the key area of wet storage, in which [the] Shannon Estuary will be a major provider of as we go about harvesting the unprecedented opportunity for not just our region and State arising from floating offshore wind.

“Because of the estuary’s existing deepwater ports at Foynes and Moneypoint, wet storage space and available land for large-scale industrial development, we are one of few locations in Europe that can manufacture floating turbines at the scale necessary for commercialisation.”

Dr Jimmy Murphy, funded investigator in MaREI and senior lecturer in the School of Engineering in UCC, said: “This project will be an important enabler for the emerging floating wind energy sector in Ireland and will allow strategic planning decisions to be made related to the efficient deployment of floating windfarms.

“MaREI has a track record of research and development in floating wind and welcomes this collaboration with ESB and Shannon Foynes Port to address the challenge of identifying potential wet storage locations and optimising design layout.”

Ireland’s offshore wind energy potential arising from our Atlantic seaboard winds is among Europe’s leading renewable energy opportunities, the partners suggest.

With a maritime area more than seven times the size of its landmass, ideal wind conditions and strategic location on the Atlantic Ocean's edge, floating offshore wind generation has the potential to deliver up to 30 gigawatts of energy by 2050 — six times more than current domestic electricity demand.

MaREI will provide the research expertise along with the various tools required for the study which is aligned with their core research principles. ESB and Shannon Foynes Port will provide funding support and industry knowledge for the study which is in line with ESB’s Net Zero by 2040 strategy and Shannon Foynes Port’s Vision 2041 masterplan.

Published in Power From the Sea

Shannon Foynes Port Company is hiring for the position of compliance executive.

This full-time permanent role will report directly to the corporate and regulatory assurance officer with a base located at the company’s head office in Foynes, Co Limerick.

The successful candidate will demonstrate strong organisational skills in guiding and advising on audit, governance, compliance and risk management-related activities.

The compliance executive will be responsible for supporting the corporate and regulatory assurance officer to ensure that Shannon Foynes Port Company meets its significant compliance obligations, within deadlines and to the appropriate standards.

Further details of the role and how to apply can be found on the Shannon Foynes Port Company website HERE.

The closing date for applications is midnight on Friday 28 July.

Published in Jobs

The Shannon Estuary can become an international floating offshore wind and related green fuels generation hub, according to the Chief Executive of the Port Company, Pat Keating, who today welcomed the expression of interest’ tender for works on the 42km Limerick-Foynes rai line.

“The re-generation of the rail line is one of two transport links essential for delivering on the unprecedented opportunity for the estuary as a global floating offshore wind energy and transhipment hub. It will be of great benefit to the wider project, but even more essential is the road link to Foynes,” he said.

“The expression of interest tender is a very significant moment within our wider plans to capitalise on the unprecedented opportunity for the Shannon Estuary as it gives even greater certainty that this important rail connectivity is going to happen. This is a strategic move that will enhance connectivity to Foynes port but also help to decarbonise the supply chain by transferring significant cargo tonnages from road to rail. “However, the primary access to and from Foynes will still be road and it’s essential that the Foynes to Limerick road goes ahead as soon as possible. It will carry by far the majority of goods to and from Foynes, goods and materials that rail cannot accommodate. So, while we are delighted with an announcement regarding the reinstatement of rail, we look forward to an early commitment, too, on the Foynes to Limerick road,” he said.

“We appreciate the expediency regarding the rail reinstatement but it is essential, too, that we get moving on addressing our road infrastructure. Shannon Foynes is a Core Corridor Port under the EU’s Ten-t Regulations. These regulations require that upgraded hinterland connections, ie road and rail, are in place by 2030.

“The Shannon Estuary can become an international floating offshore wind and related green fuels generation hub, but our current road network links are an impediment to that. We must move quickly, however, as time is not on our side when it comes to energy security and climate change. The Estuary can be an enabler for addressing those critical issues for not just Ireland but Europe, with transformative economic as well as environmental impact, but it won’t happen without the necessary infrastructure,” he said.

Mr Keating added that the rail project is also very much endorsed at European level. “In 2015 we secured €800,000 from the EU’s Connecting Europe Facility for a Feasibility and Detailed Design study, including all associated consenting requirements, for the regeneration of the rail link in 2015. Those works were completed in 2019 and were part funded also by Shannon Foynes Port Company and undertaken by Irish Rail. As a result, the reinstatement of the 40kms Limerick to Foynes line is now shovel-ready, so moving to this next ‘expressions of interest’ stage to realise this opportunity is a key moment.”

Published in Shannon Estuary

#IrishPorts - Transport Minister Paschal Donohoe has today (Friday 10 July) welcomed the announcement by the European Commission that a number of projects – including developments across three Irish ports – have been recommended for co-funding under the Connecting Europe Facility (CEF).

"This is good news and a further boost for infrastructure investment in Ireland," said Minister Donohoe. "The recommendation by the European Commission in respect of these five projects is a positive step in the development of these key infrastructural projects which will allow for future growth and development which will ultimately help with job creation.

“I was particularly delighted to support the port companies in their applications. Ireland’s National Ports Policy categorises the Port of Cork Company, Dublin Port Company and Shannon Foynes Port Company as Ports of National Significance (Tier 1) in recognition of the key role of they play in national economic development.

"This positive announcement will support significant, planned investment by the ports and follows the news that the Ringaskiddy project in the Port of Cork has recently been granted planning permission, while just today the Alexander Basin Redevelopment Project received a positive planning decision from An Bord Pleanála, allowing the largest ever infrastructure development project to be carried out at Dublin Port.

"In addition, Shannon Foynes Port Company’s first major project, the redevelopment of the East Jetty, is now well underway having commenced earlier this year. The continued commercial development of the port companies is a key strategic objective of the Government which will support job creation across the country as they are progressed in the years to come.”

The five projects are as follows:
· Port of Cork, Ringaskiddy Project (Project Type: Works, Co-funding rate: 17.47%, EU Max Contribution: €12,736,001.10)
· Shannon Foynes Port Company, Jetty Enhancement for Sea Port (Works, 20%, €2,200,000)
· Shannon Foynes Port Company, Connecting International Sea Cargo to the Irish Rail Network (Study, 50%, €800,000)
· Dublin Port, Alexandra Basin Redevelopment Project (Works, 10.3%, €22,782,055)
· City Centre Re-signalling Project (Works, 30%, €17,586,760.20)

Published in Ports & Shipping

#ShannonFoynes - The Limerick Leader reports on the Shannon Foynes Port Company's announcement of record profits in 2013.

Ireland's second largest bulk port company declared a 35% increase in its operating profits in the 12 months since its 2012 annual report, a record rise for the fourth successive year.

According to the port's CEO Patrick Keating, this strong performance underlines the objectives of the Vision 2041 master plan for the Shannon Estuary launched last year.

The Limerick Leader has more on the story HERE.

Published in Shannon Estuary

#ShannonPortProfit – Record financial profits by Shannon Foynes Port Company (SFPC) is down to an increase in shipping activity levels not seen since 2008.

SFPC posted an operating profit of just over €3 million for 2012, which after financing costs and net disposal proceeds amounted to just over €2 million.

Operating profit represents a 6.6 per cent rise on 2011 performance. The Irish Times has more on this story.

 

Published in Shannon Estuary

#Shannon - The Shannon Foynes Port Company has launched its master plan for the development of port infrastructure and services along the Shannon Estuary.

RTÉ News reports on the 30-year plan, titled Vision 2041, which will involve the construction of a new deepwater birth at Foynes, the development of warehousing and facilities across 300 acres of additional land - and the potential reopening of the Foynes-Limerick railway line, which has lain dormant since 2001.

As one of the deepest waterways in Europe, the estuary is also in prime position to take advantage of the new 'post-panamax' supertanker shipping era, and talks on securing future foreign direct investment as a priority.

As previously reported on Afloat.ie, submissions for the accompanying strategic plan for the development and management of marine-related industry and tourism in the Shannon Estuary region closed last week.

The Draft Strategic Integrated Framework Plan (SIFP) for the Shannon Estuary, the first of its type to be developed in Ireland, identifies a number of strategic sites along the estuary for future possible development in the areas of industry, tourism, energy, fishing and aquaculture and marine-related industry.

Published in Shannon Estuary

#SHANNON FOYNES – An operating profit close to €2.9m for last year (up from €2.5m in 2011) was recorded by Shannon Foynes Port Company (SFPC) according to yesterday's Irish Times.

SFPC recorded a 2.2 per cent rise in turnover to €10.1 million, resulting in a 13 per cent increase in operating margin from 25.5 per cent to 28.1 per cent, according to the 2011 annual report.

The company made a profit attributable to the shareholder of €2.73 million after exceptional items and financing. Cargo increased 8 per cent to 10.1 million tonnes from 9.4 million tonnes in 2010. About 35 per cent of Ireland's bulk traffic transits through SFPC's six terminals on the estuary.

Published in Shannon Estuary

#SHANNON ESTUARY – The Maritime Journal reports that a simulated fire and rescue drill simulating a fire on board a ship took place in Foynes Port this week.

Limerick County Fire & Rescue Service with the assistance of Shannon Foynes Port Company and Celtic Tugs which operates a fleet of  tugs in the port hosted the Ship and Ports Course.

A number of exercises were carried out during the course, to read more on the exercise click HERE.

Published in Shannon Estuary
Page 1 of 2

The Sydney Hobart Yacht Race

The Rolex Sydney Hobart Yacht Race is an annual offshore yacht racing event with an increasingly international exposure attracting super maxi yachts and entries from around tne world. It is hosted by the Cruising Yacht Club of Australia, starting in Sydney, New South Wales on Boxing Day and finishing in Hobart, Tasmania. The race distance is approximately 630 nautical miles (1,170 km).

The 2022 Rolex Sydney Hobart Yacht Race starts in Sydney Harbour at 1pm (AEDT) on Monday 26 December.

This is the 77th edition of the Rolex Sydney Hobart. The inaugural race was conducted in 1945 and has run every year since, apart from 2020, which was cancelled due to the COVID-19 pandemic.

88 boats started the 2021 Rolex Sydney Hobart, with 50 finishing.

The Sydney Hobart Yacht Race - FAQs

The number of Sydney Hobart Yacht Races held by the Cruising Yacht Club of Australia since 1945 is 75

6,257 completed the Sydney Hobart Yacht race, 1036 retired or were disqualified)

About 60,061 sailors have competed in the Sydney Hobart Race between 1945 and 2019

Largest fleets: 371 starters in the 50th race in 1994 (309 finished); 154 starters in 1987 (146 finished); 179 starters in 1985 (145 finished); 151 starters in 1984 (46 finished); 173 started in 1983 (128 finished); 159 started in 1981 (143 finished); 147 started in 1979 (142 finished); 157 started in 2019 (154 finished)

116 in 2004 (59 finished); 117 in 2014 (103 finished); 157 in 2019 (154 finished)

Nine starters in the inaugural Sydney Hobart Yacht Race in 1945

In 2015 and 2017 there were 27, including the 12 Clipper yachts (11 in 2017). In the record entry of 371 yachts in the 50th in 1994, there were 24 internationals

Rani, Captain John Illingworth RN (UK). Design: Barber 35’ cutter. Line and handicap winner

157 starters, 154 finishers (3 retirements)

IRC Overall: Ichi Ban, a TP52 owned by Matt Allen, NSW. Last year’s line honours winner: Comanche, Verdier Yacht Design and VPLP (FRA) owned by Jim Cooney and Samantha Grant, in 1 day 18 hours, 30 minutes, 24 seconds. Just 1hour 58min 32secs separated the five super maxis at the finish 

1 day 9 hours 15 minutes and 24 seconds, set in 2017 by LDV Comanche after Wild Oats XI was penalised one hour in port/starboard incident for a finish time of 1d 9h 48m 50s

The oldest ever sailor was Syd Fischer (88 years, 2015).

As a baby, Raud O'Brien did his first of some six Sydney Hobarts on his parent's Wraith of Odin (sic). As a veteran at three, Raud broke his arm when he fell off the companionway steps whilst feeding biscuits to the crew on watch Sophie Tasker sailed the 1978 race as a four-year-old on her father’s yacht Siska, which was not an official starter due to not meeting requirements of the CYCA. Sophie raced to Hobart in 1979, 1982 and 1983.

Quite a number of teenage boys and girls have sailed with their fathers and mothers, including Tasmanian Ken Gourlay’s 14-year-old son who sailed on Kismet in 1957. A 12-year-old boy, Travis Foley, sailed in the fatal 1998 race aboard Aspect Computing, which won PHS overall.

In 1978, the Brooker family sailed aboard their yacht Touchwood – parents Doug and Val and their children, Peter (13), Jacqueline (10), Kathryne (8) and Donald (6). Since 1999, the CYCA has set an age limit of 18 for competitors

Jane (‘Jenny’) Tate, from Hobart, sailed with her husband Horrie aboard Active in the 1946 Race, as did Dagmar O’Brien with her husband, Dr Brian (‘Mick’) O’Brien aboard Connella. Unfortunately, Connella was forced to retire in Bass Strait, but Active made it to the finish. The Jane Tate Memorial Trophy is presented each year to the first female skipper to finish the race

In 2019, Bill Barry-Cotter brought Katwinchar, built in 1904, back to the start line. She had competed with a previous owner in 1951. It is believed she is the oldest yacht to compete. According to CYCA life member and historian Alan Campbell, more than 31 yachts built before 1938 have competed in the race, including line honours winners Morna/Kurrewa IV (the same boat, renamed) and Astor, which were built in the 1920s.

Bruce Farr/Farr Yacht Design (NZL/USA) – can claim 20 overall wins from 1976 (with Piccolo) up to and including 2015 (with Balance)

Screw Loose (1979) – LOA 9.2m (30ft); Zeus II (1981) LOA 9.2m

TKlinger, NSW (1978) – LOA 8.23m (27ft)

Wild Oats XI (2012) – LOA 30.48m (100ft). Wild Oats XI had previously held the record in 2005 when she was 30m (98ft)

©Afloat 2020