Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Dunbar

Plans are afoot to power Edinburgh with a giant offshore windfarm, the Edinburgh Evening News reports.
The £1.2 billion (€ billion) project proposed by Irish group Mainstream Renewable Power could see as many as 130 turbines generate power for up to 335,000 homes.
The turbines would be installed 30km north of Dunbar, East Lothian, though a number would be visible from the coastline.
Concerns have been raised by East Lothian residents at a consultation hearing regarding the environmental impact of the project, dubbed Neart na Gaoithe (might of the wind), though wildlife and environmental surveys are still being carried out.
Any final go-ahead on the windfarm scheme would have to be given by the Scottish government.
As previously reported on Afloat.ie, Mainstream Renewable Power - headed by Eddie O'Connor - has signed deals for windfarms in South Africa and Alberta province in Canada.
The Evening News has more on the story HERE.

Plans are afoot to power Edinburgh with a giant offshore windfarm, the Edinburgh Evening News reports.

The £1.2 billion (€ 1.37 billion) project proposed by Irish group Mainstream Renewable Power could see as many as 130 turbines generate power for up to 335,000 homes.

The turbines would be installed 30km north of Dunbar, East Lothian, though a number would be visible from the coastline.

Concerns have been raised by East Lothian residents at a consultation hearing regarding the environmental impact of the project, dubbed Neart na Gaoithe (might of the wind), though wildlife and environmental surveys are still being carried out.

Any final go-ahead on the windfarm scheme would have to be given by the Scottish government.

As previously reported on Afloat.ie, Mainstream Renewable Power - headed by Eddie O'Connor - has signed deals for windfarms in South Africa and Alberta province in Canada.

The Evening News has more on the story HERE.

Published in Power From the Sea

Ireland's Trading Ketch Ilen

The Ilen is the last of Ireland’s traditional wooden sailing ships.

Designed by Limerick man Conor O’Brien and built in Baltimore in 1926, she was delivered by Munster men to the Falkland Islands where she served valiantly for seventy years, enduring and enjoying the Roaring Forties, the Furious Fifties, and Screaming Sixties.

Returned now to Ireland and given a new breath of life, Ilen may be described as the last of Ireland’s timber-built ocean-going sailing ships, yet at a mere 56ft, it is capable of visiting most of the small harbours of Ireland.

Wooden Sailing Ship Ilen FAQs

The Ilen is the last of Ireland’s traditional wooden sailing ships.

The Ilen was designed by Conor O’Brien, the first Irish man to circumnavigate the world.

Ilen is named for the West Cork River which flows to the sea at Baltimore, her home port.

The Ilen was built by Baltimore Sea Fisheries School, West Cork in 1926. Tom Moynihan was foreman.

Ilen's wood construction is of oak ribs and planks of larch.

As-built initially, she is 56 feet in length overall with a beam of 14 feet and a displacement of 45 tonnes.

Conor O’Brien set sail in August 1926 with two Cadogan cousins from Cape Clear in West Cork, arriving at Port Stanley in January 1927 and handed it over to the new owners.

The Ilen was delivered to the Falkland Islands Company, in exchange for £1,500.

Ilen served for over 70 years as a cargo ship and a ferry in the Falkland Islands, enduring and enjoying the Roaring Forties, the Furious Fifties, and Screaming Sixties. She stayed in service until the early 1990s.

Limerick sailor Gary McMahon and his team located Ilen. MacMahon started looking for her in 1996 and went out to the Falklands and struck a deal with the owner to bring her back to Ireland.

After a lifetime of hard work in the Falklands, Ilen required a ground-up rebuild.

A Russian cargo ship transported her back on a 12,000-mile trip from the Southern Oceans to Dublin. The Ilen was discharged at the Port of Dublin 1997, after an absence from Ireland of 70 years.

It was a collaboration between the Ilen Project in Limerick and Hegarty’s Boatyard in Old Court, near Skibbereen. Much of the heavy lifting, of frames, planking, deadwood & backbone, knees, floors, shelves and stringers, deck beams, and carlins, was done in Hegarty’s. The generally lighter work of preparing sole, bulkheads, deck‐houses fixed furniture, fixtures & fittings, deck fittings, machinery, systems, tanks, spar making and rigging is being done at the Ilen boat building school in Limerick.

Ten years. The boat was much the worse for wear when it returned to West Cork in May 1998, and it remained dormant for ten years before the start of a decade-long restoration.

Ilen now serves as a community floating classroom and cargo vessel – visiting 23 ports in 2019 and making a transatlantic crossing to Greenland as part of a relationship-building project to link youth in Limerick City with youth in Nuuk, west Greenland.

At a mere 56ft, Ilen is capable of visiting most of the small harbours of Ireland.

©Afloat 2020