Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Newcomen Bridge

Waterways Ireland advises arrangements have been made for Iarnród Éireann to open the lifting bridge at Newcomen Bridge on the Royal Canal in Dublin on the following dates and times, if there is demand:

  • Sunday 5 May, 9am-1pm (Low water 16:00)
  • Saturday 25 May, 9am-1pm (Low water 06:47)
  • Tuesday 18 June, 11am-1pm (Low water 15:38)
  • Tuesday 16 July, 11am-1pm (Low water 13:58)
  • Friday 16 August, 11am-1pm (Low water 15:26)
  • Friday 27 September, 11am-1pm (Low water 14:26)

Waterways Ireland’s Eastern Regional Office requires two weeks’ notice from boaters for use of these lifts (Tel: +353 1 868 0148 or [email protected]). Should there not be a demand (minimum two boats) for a particular date, Iarnród Éireann will be notified that the scheduled lift is cancelled.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Saturday/Sunday lifts and eight for the weekday lifts). Priority will be given on a first come, first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under the bridge and through Lock 1, the cross-border body for Ireland’s inland waterways adds.

Published in Inland Waterways

#InlandWaters - The schedule of lift dates 2015 for Newcomen Bridge on the Royal Canal in Dublin city centre runs from the end of April till the end of September.

Arrangements have been made for Irish Rail to open the bridge on the following dates and times, if there is demand:

Monday 27 April 11am–1pm
Sunday 3 May 9am–1pm
Saturday 30 May 9am–1pm
Thursday 11 June 11am–1pm
Thursday 9 July 11am–1pm
Thursday 23 July 11am–1pm
Monday 24 August 11am–1pm
Monday 21 September 11am–1pm

The Waterways Ireland Eastern Regional Office requires two weeks' notice from boaters for use of these lifts.

Should there not be demand (a minimum of two boats for passage) for a particular date, Irish Rail will be notified by Waterways Ireland that this lift is cancelled.



A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for weekend lifts, eight for weekday lifts).



On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under the bridge and through Lock 1, and must remain within signed and designated areas.

To give notice of any intended passage of Newcomen Bridge, contact the Eastern Regional Office at 01 868 0148 or [email protected]

Published in Inland Waterways

Ireland's Trading Ketch Ilen

The Ilen is the last of Ireland’s traditional wooden sailing ships.

Designed by Limerick man Conor O’Brien and built in Baltimore in 1926, she was delivered by Munster men to the Falkland Islands where she served valiantly for seventy years, enduring and enjoying the Roaring Forties, the Furious Fifties, and Screaming Sixties.

Returned now to Ireland and given a new breath of life, Ilen may be described as the last of Ireland’s timber-built ocean-going sailing ships, yet at a mere 56ft, it is capable of visiting most of the small harbours of Ireland.

Wooden Sailing Ship Ilen FAQs

The Ilen is the last of Ireland’s traditional wooden sailing ships.

The Ilen was designed by Conor O’Brien, the first Irish man to circumnavigate the world.

Ilen is named for the West Cork River which flows to the sea at Baltimore, her home port.

The Ilen was built by Baltimore Sea Fisheries School, West Cork in 1926. Tom Moynihan was foreman.

Ilen's wood construction is of oak ribs and planks of larch.

As-built initially, she is 56 feet in length overall with a beam of 14 feet and a displacement of 45 tonnes.

Conor O’Brien set sail in August 1926 with two Cadogan cousins from Cape Clear in West Cork, arriving at Port Stanley in January 1927 and handed it over to the new owners.

The Ilen was delivered to the Falkland Islands Company, in exchange for £1,500.

Ilen served for over 70 years as a cargo ship and a ferry in the Falkland Islands, enduring and enjoying the Roaring Forties, the Furious Fifties, and Screaming Sixties. She stayed in service until the early 1990s.

Limerick sailor Gary McMahon and his team located Ilen. MacMahon started looking for her in 1996 and went out to the Falklands and struck a deal with the owner to bring her back to Ireland.

After a lifetime of hard work in the Falklands, Ilen required a ground-up rebuild.

A Russian cargo ship transported her back on a 12,000-mile trip from the Southern Oceans to Dublin. The Ilen was discharged at the Port of Dublin 1997, after an absence from Ireland of 70 years.

It was a collaboration between the Ilen Project in Limerick and Hegarty’s Boatyard in Old Court, near Skibbereen. Much of the heavy lifting, of frames, planking, deadwood & backbone, knees, floors, shelves and stringers, deck beams, and carlins, was done in Hegarty’s. The generally lighter work of preparing sole, bulkheads, deck‐houses fixed furniture, fixtures & fittings, deck fittings, machinery, systems, tanks, spar making and rigging is being done at the Ilen boat building school in Limerick.

Ten years. The boat was much the worse for wear when it returned to West Cork in May 1998, and it remained dormant for ten years before the start of a decade-long restoration.

Ilen now serves as a community floating classroom and cargo vessel – visiting 23 ports in 2019 and making a transatlantic crossing to Greenland as part of a relationship-building project to link youth in Limerick City with youth in Nuuk, west Greenland.

At a mere 56ft, Ilen is capable of visiting most of the small harbours of Ireland.

©Afloat 2020