Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Cable Innovator

# PORTS & SHIPPING -A specialist cable-laying vessel, Cable Innovator (1995/14,277 tonnes) arrived into Dublin Port yesterday. She is due start work next week on a €12.5m telecoms cable for CeltixConnect between Dublin and Holyhead.

According to a report in The Irish Times (click HERE) CeltixConnect's chief executive Diane Hodnett expected customers to start transmitting traffic on the cable at the end of January.

The cable will pass through the East Point Business Park in Dublin and on to the city's IFSC. On the Welsh side, the 131km cable will connect to the Welsh Assembly-funded Parc Cybi business park in Holyhead. From there it will connect to networks linking Manchester, London and the rest of Europe.

Capacity on the cable will be sold primarily to telecoms firms and ISPs, mobile phone operators and a small number of multinationals in the technology space which have massive bandwidth requirements.

For more information about the UK-flagged vessel which berthed in the port's Alexandra Basin, click this LINK.

Published in Ports & Shipping

# PORTS & SHIPPING -A specialist cable-laying vessel, Cable Innovator (1995/14,277 tonnes) arrived into Dublin Port yesterday. She is due start work next week on a €12.5m telecoms cable for CeltixConnect between Dublin and Holyhead.

According to a report in The Irish Times (click HERE) CeltixConnect's chief executive Diane Hodnett expected customers to start transmitting traffic on the cable at the end of January.

The cable will pass through the East Point Business Park in Dublin and on to the city's IFSC. On the Welsh side, the 131km cable will connect to the Welsh Assembly-funded Parc Cybi business park in Holyhead. From there it will connect to networks linking Manchester, London and the rest of Europe.

Capacity on the cable will be sold primarily to telecoms firms and ISPs, mobile phone operators and a small number of multinationals in the technology space which have massive bandwidth requirements.

For more information about the UK-flagged vessel which berthed in the port's Alexandra Basin, click this LINK.

Published in Ports & Shipping

At A Glance – 420 Dinghy Specifications

Crew 2
Type Monohull
Design One-Design
Construction GRP
Rig Bermuda
Keel Centerboard
Trapeze Single
LOA 4.2 metres (13 ft 9 in)
Beam 1.63 metres (5 ft 4 in)
Draft 0.965 metres (3 ft 2.0 in)
Hull weight 80 kilograms (180 lb)
Mast height 6.26 metres (20 ft 6 in)
Main & Jib area 10.25 square metres (110.3 sq ft) [1]
Mainsail area 7.45 square metres (80.2 sq ft)
Jib / Genoa area 2.8 square metres (30 sq ft)
Spinnaker area 8.83 square metres (95.0 sq ft)

Featured Sailing School

INSS sidebutton

Featured Clubs

dbsc mainbutton
Howth Yacht Club
Kinsale Yacht Club
National Yacht Club
Royal Cork Yacht Club
Royal Irish Yacht club
Royal Saint George Yacht Club

Featured Brokers

leinster sidebutton

Featured Webcams

Featured Associations

ISA sidebutton
ICRA
isora sidebutton

Featured Marinas

dlmarina sidebutton

Featured Chandleries

CHMarine Afloat logo
https://afloat.ie/resources/marine-industry-news/viking-marine

Featured Sailmakers

northsails sidebutton
uksails sidebutton
watson sidebutton

Featured Blogs

W M Nixon - Sailing on Saturday
podcast sidebutton
BSB sidebutton
wavelengths sidebutton
 

Please show your support for Afloat by donating