Waterways Ireland advises masters of vessels on and users of the Shannon Navigation that the lifting bridge at Tarmonbarry in Co Roscommon will now reopen on Friday 3 May.

This extension of the bridge’s closure since February is a result of additional repair works required following a bridge strike.

The cross-border body for Ireland’s inland waterways says it apologises for extending this closure “but the additional work is essential to ensure the bridge is safely operational in advance of the bank holiday weekend”.

A diversion route remains available via the Camlin River.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on the Shannon Navigation that in-river works for the construction of the Killaloe Bypass upper bridge superstructure are progressing as planned and will continue until October 2024.

As previously reported on Afloat.ie, the bridge is being constructed around 1km downstream of the current Killaloe–Ballina bridge.

A buoyed navigational channel continues to be provided for 100 metres either side of the in-river works.

The following plant and equipment will be operating on or overhead the navigation during the upper bridge works:

  • 600t crawler crane set up on the east shore
  • Stabilising crane barge (30m x 23m x 1.88m)
  • 100t crawler crane
  • Tugboat/pusher boat
  • Dumb barge (23m x 9m) and mobile elevated work platforms
  • Safety boat
  • Landing pontoon and gangways

From next Tuesday 2 to Friday 19 April, the final steel girders will be lifted into position in the central spans of the bridge.

This is a heavy lift operation and deemed high-risk work, requiring calm waters for operation of mobile elevated work platforms (MEWP) on barges.

Masters of vessels are requested to proceed at slow speed (5 knots, no wash) with additional caution in the vicinity of the works, and to follow the instructions of the safety boat crew as there are hazards such as bridge piers, steel piles and mooring lines to navigate.

The cross-border body for Ireland’s inland waterways thanks its customers for their cooperation in relation to these works.

Published in Inland Waterways

Waterways Ireland advises masters of vessels that the winter mooring period will end this Easter Sunday, 31 March, on the Shannon Navigation and Shannon-Erne Waterway.

Shannon Navigation Bye-law No. 17(3) will apply from 31 March, such that vessels should not berth in the same harbour for longer than the statutory period of five consecutive days nor more than a total of seven days in any one month.

Services were reconnected to Waterways Ireland harbours and jetties from Friday 15 March, the cross-border body for Ireland’s inland waterways adds.

Published in Inland Waterways

Waterways Ireland advises all masters of vessels on and users of the Shannon Navigation that Battlebridge Lock and the harbour areas immediately upstream and downstream in Battlebridge, Co Leitrim will be closed from this Wednesday 27 to Friday 29 March due to planned diving inspections in the area.

The cross-border body for Ireland’s inland waterways says it regrets any inconvenience that this may cause and thanks its customers for their cooperation.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on and users of the Shannon Navigation that all locks and bridges within the North Shannon region will be closed for one day on Thursday 21 March to facilitate mandatory staff training.

The cross-border body for Ireland’s inland waterways apologies for any inconvenience this may cause and thanks its customers for their cooperation in relation to this matter.

Published in Inland Waterways

Waterways Ireland advises all masters of vessels on and users of the Shannon Navigation that the lifting bridge at Tarmonbarry in Co Roscommon will remain closed until at least Thursday 18 April to facilitate essential maintenance works.

Works at Tarmonbarry were previously extended twice since beginning in early February, and a diversion route is available via the Camlin River.

The cross-border body for Ireland’s inland waterways says it regrets any inconvenience that this may cause and thanks its customers for their cooperation.

This story was updated on Wednesday 3 April to include the latest information.

Published in Inland Waterways

Waterways Ireland advises all masters of vessels on and users of the Shannon Navigation that Clarendon Lock in Knockvicar, Co Roscommon will be closed this Wednesday 28 February from 9am to 5pm due to a planned ESB power outage in the area.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on and users of the Shannon Navigation that the installation of lighting on the underside of Carrick-on-Shannon bridge arches will take place between Monday 19 and Friday 23 February, with works to take place between 10am to 3pm daily.

The contractor will be using a mobile under-bridge hoist vehicle. One lane of the bridge will be closed during these hours and a stop/go traffic management plan will be in place for traffic crossing the bridge.

Masters of vessels should proceed with additional caution during these works and comply with the instructions of onsite safety staff, the cross-border body for Ireland’s inland waterways adds.

Published in Inland Waterways

Waterways Ireland advises all masters of vessels on and users of the Shannon Navigation that the lifting bridges at Tarmonbarry and Rooskey in Co Roscommon will be closed on Thursday 8 and Friday 9 February to facilitate structural inspections.

In an update on Friday, Waterways added that while Rooskey lifting bridge will reopen on Saturday 10 February, the bridge at Tarmonbarry will remain closed until next Friday 16 February to facilitate maintenance works.

Update 16/2: Waterways Ireland wishes to notify masters of vessels and users Tarmonbarry Bridge will remain closed until Friday 8 March to facilitate essential maintenance works. A diversion route is available via the Camlin River.

The cross-border body for Ireland’s inland waterways says it regrets any inconvenience that this may cause and thanks its customers for their cooperation.

Published in Inland Waterways

Waterways Ireland advises all masters of vessels on and users of the Shannon Navigation that the westernmost section of the public jetty access at the Boyle Harbour public amenity in Boyle, Co Roscommon will be closed from Monday 5 to Friday 23 February to facilitate planned maintenance works to the harbour.

Published in Inland Waterways
Page 1 of 18

Beneteau 211 sailing in Ireland

A small, fast cruiser/racer – in style very much a miniature Open 60 or early Figaro, the Beneteau First 211 offers high sailing performance for her size, plus simple accommodation for up to four people.
The boat is very dinghy-style to sail, although the keel makes her self-righting, and foam buoyancy renders her unsinkable, according to the French manufacturer.

Designed by Groupe Finot and introduced in 1998 as a replacement model for the 1992 model First 210, the Beneteau First 211 is a small high-performance yacht designed to be simple to sail and take the ground or be trailed. The words' pocket rockets' tend to be used to describe these boats!
The design was revised to become the Beneteau First 21.7 in 2005. All three models, 210, 211 and 21.7, are very similar in style and concept and share many actual components.

The hull of the Beneteau First 211 is solid GRP, with sandwich construction for the deck moulding. There is foam buoyancy at the bow and stern, guaranteeing unsinkability. The ballasted drop keel is raised by a manual jack and allows easy transport of the boat and drying out if required, supported level by the twin rudders.
The sailplan has a non-overlapping jib to keep sheet loads down and a large spinnaker to achieve high speeds downwind. With almost six foot of draught with keel down and twin rudders for control, upwind performance is also excellent.

The design is popular in Ireland's boating capital at Dun Laoghaire Harbour, where up to a dozen race as part of a one-design class in regular Dublin Bay Sailing Club racing. The boats also race for national championship honours annually. The boats are kept on Dun Laoghaire Marina and look all the more impressive as the fleet of pocket rocket racers are all moored together on one pontoon.

At A Glance – Beneteau First 211 Specifications

LOA: 6.2m (20ft 4in)

Draught: 1.8m to 0.65m (5ft 11in to 2ft 2in)

Displacement: 1,100kg (2,200lb)

LWL: 6m (19ft 7in)

ARCHITECT
• Finot Conq et Associés

Featured Sailing School

INSS sidebutton

Featured Clubs

dbsc mainbutton
Howth Yacht Club
Kinsale Yacht Club
National Yacht Club
Royal Cork Yacht Club
Royal Irish Yacht club
Royal Saint George Yacht Club

Featured Brokers

leinster sidebutton

Featured Webcams

Featured Associations

ISA sidebutton
ICRA
isora sidebutton

Featured Marinas

dlmarina sidebutton

Featured Chandleries

CHMarine Afloat logo
https://afloat.ie/resources/marine-industry-news/viking-marine

Featured Sailmakers

northsails sidebutton
uksails sidebutton
watson sidebutton

Featured Blogs

W M Nixon - Sailing on Saturday
podcast sidebutton
BSB sidebutton
wavelengths sidebutton
 

Please show your support for Afloat by donating