Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Royal Canal

Waterways Ireland advises masters and owners of vessels on the Royal Canal that Lock 45 in Cloondara, Co Longford is closed to navigation until further notice for emergency leakage repairs.

Navigation on this inland waterway between Lock 44 and Lock 45 will not be possible until at least Friday 6 May when works are expected to be completed.

Published in Inland Waterways

Waterways Ireland has issued notice that it plans to remove vessels in contravention of bye-laws from three of its inland waterways from early next month.

Vessels that appear abandoned or have no no permit (as per Bye Law 6(8), are doubled moored and/or causing obstruction (sunk) (Bye Law 27 (3)), or are deemed to be/likely to cause a hazard to navigation (Bye-Law 33(3)) will be removed from the Grand Canal, Royal Canal and Barrow Navigation from Wednesday 4 May.

Removed vessels may then be subsequently disposed of in accordance with Bye Law 34(2).

Affected vessels have been stickered where access allows and owners, where known, have been contacted, Waterways Ireland says.

Published in Inland Waterways

Waterways Ireland has provided an update for masters and owners regarding canal boat passage arrangements in and out of Dublin city for the 2022 boating season.

Movements in or out of the city on its inland waterways will continue to be organised by prior arrangement to take place as a single movement in one day.

Passage will be organised and assisted for craft if they have the valid permit(s) and arrangements in place with the Waterways Ireland inspectorate. Some flexibility may be required on dates/times of travel to align with staffing and other considerations.

In order to plan the necessary lock assistance for movements east of Lock 12 on either canal, masters are required to contact the Eastern Regional Office at [email protected] or +353 (0)1 868 0148 prior to making passage.

At time of making contact, masters should provide the following details:

  • Length, beam, water and air drafts of craft (provide approximates if don’t have exact dimensions)
  • Permit number and expiry date of current canal permit
  • Contact details for making arrangements

On the Grand Canal, a minimum of two days’ notice prior to intended passage must be given and, with the exception of pre-arranged events, a maximum of two boats per day will be taken through the locks, travelling either east or west.

Due to periodic anti-social activity along some of canal route into Dublin, boat passage will generally not be arranged in certain weather conditions and at weekends when less support is available. This can be planned for at time of making contact and suitable arrangements for passage made.

On the Royal Canal, repairs and upgrades continue to Spencer Dock Sea Lock, so boat passage (including Newcomen Bridge lifts) will be on a reduced schedule.

In addition, there will be no boat passages permitted through Locks 2 and 4 on Whitworth Road from next Tuesday 12 April for two weeks due to gate repair, gate measurement and associated works. Sections of towpath on the south side of the canal also require closure during this time.

Masters are asked to note that bridge lift dates are pre-set and as listed below, and normal restrictions will apply. Two weeks’ notice in advance of these is required; and lock assistance, bridge lift operation and sea lock passage will then be organised accordingly:

  • Sunday 1 May, 9am-1pm (Liffey Low Water at 0620, 1839)
  • Saturday 4 June, 9am-1pm (LW @ 0915)
  • Tuesday 21 June, 11am-1pm (LW @ 1156)

Masters and owners are also reminded to ensure that they have the following before making the passage through the city locks on either canal:

  • adequate fuel on board
  • competent and adequate crew to operate the boat and locks (minimum crew of 3)
  • a lock key on board their boat
  • mooring lines of adequate length to handle vessel through a lock (approx. 15m length)
  • no known mechanical problems with their boat

Waterways Ireland reserve the right to postpone passage to another day if all of these are not in place.

Lock passages can be arranged in the boating season from now until the end of October, subject to any other restrictions that may be advised by Notice from time to time.

Also note that aquatic weed is generally more prevalent as the season progresses which can hamper passage.

Boaters will be facilitated as far as practicable although Waterways Ireland cannot guarantee that passage will be possible on every planned date. Early contact will greatly assist planning and facilitate the making of the necessary arrangements.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on the Royal Canal that due to persisting mechanical issues with Begnagh Bridge that necessitate repairs, the lift bridge can only be operated manually on a limited fixed schedule until mid-June.

The dates of operation are approximately every two weeks apart, as follows:

  • Friday 15 April at 10am
  • Thursday 28 April at 10am
  • Friday 13 May at 10am
  • Friday 27 May at 10am
  • Friday 10 June at 10am
  • Friday 24 June at 10am

Prior notice must be given two days in advance to the water patroller in Clondra on 087 915 1400.

Published in Inland Waterways

Waterways Ireland wishes to notify users of the Royal Canal that leakage repair works are ongoing at The Downs, outside Mullingar in Co Westmeath, and will continue until Thursday 28 April. The inland waterway will remain closed to navigation at this location until that date.

Published in Inland Waterways

Waterways Ireland advises masters and owners of vessels of issues affecting navigation on the Shannon-Erne Waterway this week.

Following Storm Franklin, the Woodford River was completely blocked to navigation by two partially submerged fallen trees immediately upstream of Old Aghalane Bridge.

In addition, there are high-water levels in all areas of the waterway. Masters should consult with the water patrollers prior to undertaking a passage.

The by-pass current across the navigation on the lower side of Lock 15 is strong and could affect low powered vessels.

Air draft under bridges has been reduced as a result of the high-water levels and masters of craft are advised to navigate with additional caution in the vicinity of bridges.

Elsewhere, users of the Royal Canal towpath in the Maynooth area are advised that the section from Lock 13 at Deey Bridge to Pike Bridge east of Maynooth has been closed due to flooding from a blocked culvert.

The cross-border body for Ireland’s inland waterways says it is working with Kildare County Council to resolve the issue as soon as possible and apologises to users for any inconvenience this may cause.

Published in Inland Waterways

Waterways Ireland advises of a number of temporary closures and scheduled works across the inland waterways in the coming days.

On the Grand Canal, masters of vessels should note that there will be no boat passages permitted on the Nass Branch (NCB2) for six weeks from Monday 14 February to facilitate breast gate replacement and associated works.

On the Shannon Navigation, Athlone Lock will be closed to boat traffic from Wednesday 16 to Friday 18 February to allow for the relocation hydraulic and electrical services as part of recent flood relief works.

Further north, essential dredging works will see the closure of Portna Canal on the Lower Bann Navigation to boat traffic from Monday 14 to Monday 21 February.

And in Dublin, masters and users of the Royal Canal should note essential tree works taking place between the 12th Lock and Granard Bridge (Castleknock Road) from Monday 14 February.

These works are expected to last for 10 working days which may not be consecutive, weather and staff resources allowing. Vessel owners moored on the north band are asked to cooperate with the tree works contractor to access the bank area for tree removal.

While closure of the towpath is not foreseen, towpath users are asked to be mindful of the works ongoing.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on the Royal Canal that the summit level near Mullingar is closed to navigation with immediate effect until the end of February, in order to facilitate essential leakage repair works on the inland waterway.

Published in Inland Waterways

Christmas has arrived along the Royal Canal Greenway as a line-up of festive things to do and see at its multiple trailheads are announced.

In Kildare, visitors can veer off the greenway to experience a taste of Christmas with Festive Afternoon Tea at Carton House, available Thursdays to Sunday.

In Longford, those keen to kick start their New Year’s health resolutions early can hire a bike from the Midlands Cycle Hub in Cloondara or at Ballymahon Greenway Cycles to avail of seasonal special offers on bike hire over the December and Christmas holiday period.

Then unwind and enjoy festive entertainment after your Royal Canal visit with a performance of Longford’s Snow White Christmas Pantomime which is running at St Mel’s College from 20 December to 2 January.

Also not to be missed are Fiona Egan’s Festive Cookery Class (runs throughout December, booking required) and Longford’s Traditional Panto, which runs from 20 December to 2 January (book here).

If you’re in Westmeath, get into the festive spirit at Mullingar Arts Centre this Christmas with its extensive programme of festive fun events and performances for all the family.

Visitors seeking to stay awhile can find respite at popular accommodation options in Westmeath including the centrally located Newbury Hotel and the family-run Annebrook House Hotel, situated in the heart of Mullingar nearby and renowned locally for its annual breath-taking Christmas foyer display.

Refuel at one of Westmeath’s picturesque eateries. Nanny Quinn’s, located on the banks of the Royal Canal by Lock 18 at Thomastown Harbour, is a must-taste restaurant serving fresh, local home-cooked fare and is adorned with Christmas lights offering a charming festive experience.

And see Santa while you stop off in Westmeath at the Andean Alpacas Christmas Experience where you can explore the festive pathways, visit the elves and receive a gift from Saint Nick himself.

Your little elves can even post a letter to Santa in a special letterbox destined for the North Pole, feed the alpacas and site and have storytime with Mrs Claus.

Speaking about the events planned for the festive season, Sharon Lavin of Waterways Ireland said: “As Ireland’s longest greenway covering over 130kms across Kildare, Longford, Meath and Westmeath, the Royal Canal Greenway has plenty of activity happening this Christmas.

“There is an abundance of activities planned near our four main trailheads, whether you are in the mood for a festive feast or taking the whole family to see Santa, visitors can enjoy the seasonal beauty of the Royal Canal Greenway while still partaking in the festive events and activities along the way.”

Check out the Royal Canal Greenway on Facebook, Instagram or Twitter where more information about events is being added daily.

Published in Inland Waterways

Waterways Ireland has launched a request for tender for the development of a visitor and tourism plan for the Clondra/Richmond Harbour and Tarmonbarry area at the western end of the Royal Canal.

According to the RFT, the intended plan “will chart and identify the recreational and tourism interventions required to boost tourism, recreation and economic regeneration in the area”.

Among its objectives are “to take an integrated development approach to conserve, develop and promote [the area] as a significant recreation/tourism destination in the centre of Ireland”, and “to set out a clear, realistic and achievable tourism vision…over a 10-year period”.

In addition, any plan “must be compatible with the environmental designation and zoning” of the localities covered on this part of the inland waterway.

A particular focus for Waterways Ireland will be to “protect and restore one of our heritage assets” — namely the old lock keeper’s house at Lock 46, which dates from the early 19th century.

The deadline for receipt of tender applications is 3pm on Thursday 13 January 2022. More details can be found on the eTenders website HERE.

Published in Inland Waterways
Page 4 of 14

Dublin Bay 21s

An exciting new project to breathe life into six defunct 120-year-old Irish yachts that happen to be the oldest intact one-design keelboat class in the world has captured the imagination of sailors at Ireland's biggest sailing centre. The birthplace of the original Dublin Bay 21 class is getting ready to welcome home the six restored craft after 40 years thanks to an ambitious boat building project was completed on the Shannon Estuary that saved them from completely rotting away.

Dublin Bay 21 FAQs

The Dublin Bay 21 is a vintage one-design wooden yacht designed for sailing in Dublin Bay.

Seven were built between 1903 and 1906.

As of 2020, the yachts are 117 years old.

Alfred Mylne designed the seven yachts.

The total voting population in the Republic's inhabited islands is just over 2,600 people, according to the Department of Housing.

Dublin Bay Sailing Club (DBSC) commissioned the boat to encourage inexpensive one-design racing to recognise the success of the Water Wag one-design dinghy of 1887 and the Colleen keelboat class of 1897.

Estelle built by Hollwey, 1903; Garavogue built by Kelly, 1903; Innisfallen built by Hollwey, 1903.; Maureen built by Hollwey, 1903.; Oola built by Kelly, 1905; Naneen built by Clancy, 1905.

Overall length- 32'-6', Beam- 7'-6", Keel lead- 2 tons Sail area - 600sq.ft

The first race took place on 19 June 1903 in Dublin Bay.

They may be the oldest intact class of racing keelboat yacht in the world. Sailing together in a fleet, they are one of the loveliest sights to be seen on any sailing waters in the world, according to many Dublin Bay aficionados.

In 1964, some of the owners thought that the boats were outdated, and needed a new breath of fresh air. After extensive discussions between all the owners, the gaff rig and timber mast was abandoned in favour of a more fashionable Bermudan rig with an aluminium mast. Unfortunately, this rig put previously unseen loads on the hulls, resulting in some permanent damage.

The fleet was taken out of the water in 1986 after Hurricane Charlie ruined active Dublin Bay 21 fleet racing in August of that year. Two 21s sank in the storm, suffering the same fate as their sister ship Estelle four years earlier. The class then became defunct. In 1988, master shipwright Jack Tyrrell of Arklow inspected the fleet and considered the state of the hulls as vulnerable, describing them as 'still restorable even if some would need a virtual rebuild'. The fleet then lay rotting in a farmyard in Arklow until 2019 and the pioneering project of Dun Laoghaire sailors Fionan De Barra and Hal Sisk who decided to bring them back to their former glory.

Hurricane Charlie finally ruined active Dublin Bay 21 fleet racing in August 1986. Two 21s sank in the storm, suffering the same fate as a sister ship four years earlier; Estelle sank twice, once on her moorings and once in a near-tragic downwind capsize. Despite their collective salvage from the sea bed, the class decided the ancient boats should not be allowed suffer anymore. To avoid further deterioration and risk to the rare craft all seven 21s were put into storage in 1989 under the direction of the naval architect Jack Tyrrell at his yard in Arklow.

While two of the fleet, Garavogue and Geraldine sailed to their current home, the other five, in various states of disrepair, were carried the 50-odd miles to Arklow by road.

To revive the legendary Dublin Bay 21 class, the famous Mylne design of 1902-03. Hal Sisk and Fionan de Barra are developing ideas to retain the class's spirit while making the boats more appropriate to today's needs in Dun Laoghaire harbour, with its many other rival sailing attractions. The Dublin Bay 21-foot class's fate represents far more than the loss of a single class; it is bad news for the Bay's yachting heritage at large. Although Dún Laoghaire turned a blind eye to the plight of the oldest intact one-design keelboat fleet in the world for 30 years or more they are now fully restored.

The Dublin Bay 21 Restoration team includes Steve Morris, James Madigan, Hal Sisk, Fionan de Barra, Fintan Ryan and Dan Mill.

Retaining the pure Mylne-designed hull was essential, but the project has new laminated cold-moulded hulls which are being built inverted but will, when finished and upright, be fitted on the original ballast keels, thereby maintaining the boat’s continuity of existence, the presence of the true spirit of the ship.

It will be a gunter-rigged sloop. It was decided a simpler yet clearly vintage rig was needed for the time-constrained sailors of the 21st Century. So, far from bringing the original and almost-mythical gaff cutter rig with jackyard topsail back to life above a traditionally-constructed hull, the project is content to have an attractive gunter-rigged sloop – “American gaff” some would call it.

The first DB 21 to get the treatment was Naneen, originally built in 1905 by Clancy of Dun Laoghaire for T. Cosby Burrowes, a serial boat owner from Cavan.

On Dublin Bay. Dublin Bay Sailing Club granted a racing start for 2020 Tuesday evening racing starting in 2020, but it was deferred due to COVID-19.
Initially, two Dublin Bay 21s will race then three as the boat building project based in Kilrush on the Shannon Estuary completes the six-boat project.
The restored boats will be welcomed back to the Bay in a special DBSC gun salute from committee boat Mac Lir at the start of the season.
In a recollection for Afloat, well known Dun Laoghaire one-design sailor Roger Bannon said: "They were complete bitches of boats to sail, over-canvassed and fundamentally badly balanced. Their construction and design was also seriously flawed which meant that they constantly leaked and required endless expensive maintenance. They suffered from unbelievable lee helm which led to regular swamping's and indeed several sinkings.

©Afloat 2020