Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Greater Gabbard Offshore WindFarm

1st September 2010

Wicklow's Wildcat Wind-farmer's

The County Wicklow based firm, Island Shipping which ordered a pair of Wind-farm support service vessels starting with the Island Tiger, recently took up station on charter work at the world's largest offshore wind-farm construction project, writes Jehan Ashmore.

The Island Tiger is working at the Greater Gabbard Offshore Wind-farm in the North Sea, which is located 25km off the Suffolk coastline. The site of the £650m project is identified as one of three strategic locations for offshore wind-farm development identified by the UK Government. The 140 wind-turbine project with a 504MW capacity is owned by joint venture partners Scottish and Southern Energy (SSE) and RWE npower (RWE).

The second newbuild Island Panther, is currently under construction at Safehaven Marine, Cork and available for charter in 2011. Both craft are of the WildCat 53 design catamaran, that are robust to handle in heavy seas. The 16m craft are designed to go at high-speed at a maximum of 27 knots and are water-jet propelled. The craft are manned by a crew of two and can carry 12 passengers, which is the craft's primary role to transfer wind-farm support personnel, equipment and their supplies to land at the offshore wind-turbine installations.

The charter market for such service-support craft is increasing as the number of offshore wind-farm projects continue and the need to maintain them when completed. Before Island Tiger took up North Sea duties, the newbuild was show-cased at SeaWork, the shipping industry's event for small workboats that was held in Southampton during June.

Apart from experience in serving the offshore wind-farm industry, Island Shipping also operate vessels for charter management; marine construction and underwater operations which involved the company's tug Husky in assisting in the contruction of the new River Shannon road tunnel, close to Limerick City.

Island_Tiger_in_rough_seas_passes_a_wind-turbine_

Island Tiger in rough seas passes a wind-turbine

Published in Ports & Shipping

2024 Irish Flying Fifteen Worlds Qualification Events Calendar

  • FFAI Westerns 25th + 26th May - Sruthan, Connemara
  • British Nationals 19th - 22nd June - SLYC, Co Down. Rank +50%
  • FFAI Champs of Ireland - 6th - 8th Sept – Dunmore Rank +50%
  • FFAI East Coast - 21st - 22nd Sept - Dublin.
  • FFAI South Coast - 12th - 13th Oct - Lough Derg

Flying Fifteen - At A Glance

Overall Length 20 ft6.1 m

Waterline Length 15 ft4.6 m

Mast Height 22 ft 6 in6.86 m

Sail Area 150 sq ft14 sqm

Spinnaker Area 140 sq ft13 sqm

Hull Weight 300 lb136 kg

Keel Weight 400 lb169 kg

Minimum Weight 685 lb305 kg

Racing Crew Two

Ideal Crew Range 18 - 28 st145 - 185 kg

Featured Sailing School

INSS sidebutton

Featured Clubs

dbsc mainbutton
Howth Yacht Club
Kinsale Yacht Club
National Yacht Club
Royal Cork Yacht Club
Royal Irish Yacht club
Royal Saint George Yacht Club

Featured Brokers

leinster sidebutton

Featured Webcams

Featured Associations

ISA sidebutton
ICRA
isora sidebutton

Featured Marinas

dlmarina sidebutton

Featured Chandleries

CHMarine Afloat logo
https://afloat.ie/resources/marine-industry-news/viking-marine

Featured Sailmakers

northsails sidebutton
uksails sidebutton
watson sidebutton

Featured Blogs

W M Nixon - Sailing on Saturday
podcast sidebutton
BSB sidebutton
wavelengths sidebutton
 

Please show your support for Afloat by donating