Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Adam Winkelmann

There were no final races today at the Dragon European Championships meaning last night's results stand leaving Pedro Rebeo De Andrade, Ireland's Adam Winkelmann and Jorge Pinheiro De Melo in second overall.

The fleet was held ashore for most of the day as the easterly winds were very fickle all morning. They only went afloat at 1.30 as the RO attempted one start before the 3 pm cut off time.

However, as the Dragons arrived at the race course the wind shifted 180 degrees as the strong gale force Mistral winds arrived from the west bringing 3/4 metre waves.

The Race Officer abandoned any attempts to start a race and sent the fleet ashore for the last time.

 

Published in Dragon
Tagged under

A win for Adam Winkelmann, of the National and Royal Irish Yacht Clubs, puts him in second overall and two points off the overall lead at the Dragon European Championships in San Remo, Italy after five races sailed.

As Afloat previously reported, Winkelmann is on the crew of the Portuguese entry Petti Portugal with reigning Dragon European and Gold Cup Champion Pedro Andrade at the helm.

Swiss entry Quick1 sailed by Wolf Waschkuhn, Charles Nankin and Ruairidh Scott continue his overall lead by two points after discard and with two races left to sail for The Virginie Heriot Cup.

In Thursday's race five, the Portuguese/Irish entry was second to the top mark with Washkin struggling mid-fleet. Andrade managed to get to first on the second beat and Washkin got back to seventh by the finish.

There is a question mark tonight over the rest of the championship due to the forecasted arrival of a storm on Friday.

The current plan is to go out early for two final races in San Remo, weather permitting.

Download results below

Published in Dragon
Tagged under

The Dragon European Championships kick off in San Remo, Italy on Monday next.

Irish interest in the three-man keelboat competition will be with Adam Winkelmann, National and Royal Irish Yacht Clubs, who joins the crew of the Portuguese entry Petti Portugal with reigning Dragon European & Gold Cup Champion Pedro Andrade at the helm.

Pedro is also the new owner of Petticrows, the largest builder of Dragons in Europe and they are sailing one of the earliest new boats from their production line in Portugal (moved from Burnham on Crouch in the UK).

Both Pedro and Adam are regular crew with Martin Byrne and John Simms onboard Jaguar Sailing Team from Royal St George Yacht Club, who are based in Europe, but not competing at this regatta.

The Dragon European Championship racing continues until Friday, 

Published in Dragon
Tagged under

Peter Kennedy made waves on Lough Ree when the current SB20 national champion took the Helmsman’s Cup at the weekend.

However, a special mention must go to Water Wag pair Guy Kilroy and Adam Winkelmann for their ‘catch of the day’ as they discovered an unusual and large fishing lure caught on their keel.

The extra weight and drag, however small, surely didn’t help their campaign at the All Ireland Sailing Championships — but perhaps it also means a good omen for next year’s event?

Large fishing lure caught on Gilroy and Winkelmann's keel

Published in Water Wag

July's Volvo Dun Laoghaire regatta has taken in 22 entries six months ahead of the first race. It's an encouraging figure that's on a par with the 2009 VDLR, the biggest regatta in Irish sailing that year.

The positive early response is an indication, says organiser Adam Winkelmann, that the 2011 fleet, should be a bumper one too when it sets sail on July 7th for the four day event.

The emphasis is again on providing quality racing over different courses each day but organisers are also aiming to live up up to the regatta's pre-event billing as a 'Mega Party'.

The event has opened a new website, a new Facebook page (with afloat.ie, so if you're a Facebook user please show your support and 'like it'). The regatta site is also featuring the youtube clip below of events on the bay two years ago.


So far entries received are spread across nine separate classes but it's a visiting Wayfarer fleet with eight boats named already that is setting the pace. The organisers are expecting up to 50 of the two man classic design for the class National Championships that's being staged as part of the regatta.

The notice of race (NOR) was published online in October and highlighted a reduced entry fee for 'earlybird entries'. Click HERE. or scroll down to download it as a PDF. If you participated in 2009 and entered online, this year you only need to enter your email address.

Three boats are entered in the non spinnaker class and another three in the Squib keelboat. Two entries have been received in both IRC 2 and 3.  

It's still too early for a table of bands to be decided but the organisers intend to give some indication of handicap break-ups as the entries build. The IRC bands will be in line with those laid down by the Irish Cruiser Racing Association.

Despite the fact the regatta's strength since 2007 is that it draws on the capital's own fleet of 400 boats it is in fact visitors from elsewhere on the east coast that are first in. East Down Yacht Club, for example, has four entries.

But locals are signing up too. Single entries have been received in the Mermaid, Beneteau 31.7, Dragon and IRC Zero classes.

Course areas are likely to stay the same according to principal Race officer con Muphy of the National YC. Th race team is Alan Crosbie - KYC, Peter Crowley - RCYC,
David Lovegrove - HYC, Harry Gallagher - HYC, Henry Leonard - RIYC, Jack Roy - RIYC and Con Murphy  - NYC. Mike Butterfield will head up the jury.

The organisers are on the look out for volunteers to assist in the run up to and during the country's biggest sailing event. In 2009 over 300 helped to make it the biggest participant sport event in the country after the city marathon, with over 3,500 sailors afloat. More details from Ciara in the event office HERE.

Published in Volvo Regatta

The Dun Laoghaire Regatta team has announced its long term sponsor Volvo will continue their long association with the regatta.

Volvo Car Ireland will sponsor the 2011 event in association with Spirit Motor Group, a dealership for Volvo in South Dublin.

"Sailing is a global platform for Volvo with our global involvement in the sport including the Volvo Ocean Race and we are proud to continue our association with this superb inshore regatta organised by the 4 waterfront yacht clubs in Dun Laoghaire" commented David Baddeley, Managing Director Volvo Car Ireland.

Given the challenging economic environment this announcement illustrates the confidence of Volvo Car Ireland in the ongoing recovery in the Irish economy and the belief in the regatta as a marketing platform for the brand.

"Spirit Motor Group are delighted to work with Volvo Car Ireland and the Dun Laoghaire Regatta Committee to ensure a winning partnership for customers and the important sailing community that participate in the event" commented Alan Moore, Dealer Principal, Spirit Motor Group.

Adam Winkelmann, Chairman of the 2011 Volvo Dun Laoghaire Regatta Committee added "like all events we rely enormously on the support of our sponsors to run the event. The regatta relies heavily on sponsorship and an army of volunteers to deliver a quality event at an affordable price. We are really delighted that Volvo Car Ireland, our long-standing title sponsor, continues as our primary brand partner in that regard. We welcome Spirit Motor Group as a new and very important addition to the mix."

The biennial Volvo Dun Laoghaire Regatta will attract in the region of 500 boats and 3,000 participants along with families and friends to Dun Laoghaire in July next year. The sailors come mainly from Ireland and the UK from where we expect at least the same number of visitors as 2009. The event promises an important boost to the local economy of Dun Laoghaire town in the middle of the summer season. The regatta prides itself in delivering quality racing along with a wonderful festive atmosphere across the Dun Laoghaire waterfront.

This announcement is timed to coincide with the launch of the 2011 Volvo Dun Laoghaire Regatta official Notice of Race and Online Entry which is now available on www.dlregatta.org

Published in Volvo Regatta
There is a new helmsman at the wheel of Dun Laoghaire regatta next season and after taking soundings from local Dublin Bay classes, new event boss Adam Winkelmann is expecting in excess of 500 boats, despite the hard times. 'We all need to enjoy ourselves from time to time' Winkelmann, 'and that, as always, will be the focus of the regatta in July next year – great racing and good fun ashore'.

A number of classes have already committed to run open championships within the regatta including the Wayfarer UK and Irish Nationals, the J109 Open Championship, the SB3 Open Championship and a return match of the Irish Sea Championship in J80s between Ireland and Wales. The race management team headed up by Con Murphy, aided by the usual ocean of wonderful volunteers, are working to facilitate this to ensure the kind of quality race management and organisation that will ensure the success of these championships.

The non-spinnaker fleet was the largest fleet in the Regatta in 2009 and is expected again to top the numbers and provide great racing for large boats with a smaller crew.

The regatta combines the wonderful waterfront facilities of all 4 Dun Laoghaire clubs and includes support from other clubs in the Dublin area including Howth. There will be a full on entertainment programme for all participants and many more with the continued support of many of the sponsors of 2009 which included Volvo Cars, Dublin Port, Dun Laoghaire Rathdown County Council, The Royal Marine Hotel, Helly Hansen, Dubarry and many more.

One of the highlights of the regatta are the Ladies Lunches which will again be held across a number of the clubs on the Saturday. Top Fashion, great food, a dash of style accompanies by the glass of champagne are the order of the day. All these at a very reasonable price reflecting the realities of today's tightened purse strings.

There will be more announcements in the coming weeks.

For more information visit www.dlregatta.org or event secretary Ciara Dowling at [email protected]

Published in Dublin Bay

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020